Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD10-01924
StatusFinaled
Name GROVER HUMMERT
Site Address 250 S 5TH ST Unit: 660
Project NameCW Moore Plaza - Ste #660
Customer Number 
ePlanReviewNo
Description
(AHRENS & DeAHGELI - CW Moore Plaza - Ste #660) Permit is to expand a 6,389 square foot tenant space into an adjacent 2,698 square foot tenant space and remodel the new 9,087 square foot tenant space for new tenant. PLAN MODIFICATION 9-21-10 - Modification submitted to remodel the south side of this tenant space. This mod will include demolition and construction of non-bearing walls to configure a new conference room, break room, and copy room. This mod also includes related lighting, door hardware, doors, and interior finishes. **TLW** Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing wall to create a four new offices, a 250 square foot conference room, a file room, and a reception area], installation of new accessible doors and hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. This building is sprinklered to comply with high rise provisions. NOTE: Corridor down graded due to letter verifying quick response heads. PLAN MODIFICATION 9-21-10 - Modification submitted to remodel the south side of this tenant space. This mod will include demolition and construction of non-bearing walls to configure a new conference room, break room, and copy room. This mod also includes related lighting, door hardware, doors, and interior finishes. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/11/20114/28/2011 DONE
Note on Final Cert of Value to send final fees to Thornton Oliver Keller attn: Grove Hummert (representative on appliation)//4/28/11 leg
Third Notice 4/14/20114/27/2011 DONE
faxed
Third Notice 3/22/20113/31/2011 DONE
faxed
Second Notice 3/13/20113/17/2011 DONE
DetailsChristina Prado
faxed 3-17-11
First Notice 2/14/20113/3/2011 DONE
BLD-Aging Inspection2/2/20112/2/20112/4/2011 PASS
DetailsDave Hannah
BLD-Final2/3/20112/4/20112/4/2011APASS
DetailsDave Hannah
Jack Phone #: ###-#### or Matt ###-####
Permanent Occupancy  2/4/2011 DONE
DetailsChristina Prado
FIRE-Final Inspection2/3/20112/3/20112/3/2011PPASS
DetailsForrest France
Fire life safety approved after corrections made while on site.
BLD-Aging Inspection12/2/201012/2/201012/3/2010 PASS
DetailsDave Hannah
work in progress
BLD-Framing/Rough-in9/27/20109/28/20109/29/2010APASS
DetailsDave Hannah
jack Phone #: ###-#### ok to cover wall ceiling grid no longer attached to top of wall
BLD-Framing/Rough-in9/23/20109/23/20109/23/2010PPASS
DetailsDave Hannah
Jack Phone #: ###-####
CHANGE STATUS TO (ISS)  9/22/2010 DONE
DetailsTisha Gallop
plan mod picked up and paid for
Plan assigned to (TLW)9/13/2010 9/21/2010 PASS
DetailsTim L. Woodard
9/21/2010 11:55:25 TLW - activity updated through activity BLDA022 from case BLD10-01924.
Routing - PLAN CHECK9/21/2010 9/21/2010 PASS
DetailsTim L. Woodard
Modification approved with Plan Review report on Emergency lighting. TLW
PLANS/APPL TAKEN TO FRONT DESK  9/21/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/21/2010 DONE
DetailsTim L. Woodard
Override - Parcel Holds  9/21/2010  
Permit Ready to Issue  9/21/2010 DONE
Telephone call  9/21/2010 DONE
9-21-10 called Grove permit ready and fee given ///dld
Plan Modification Accepted  9/13/2010 DONE
Plan modification excepted for BLD10-01924 They will be demolishing walls and adding (3) Three new rooms. the affected sheets are A-0.0,A-1.0,A-2.0,A-2.1,A-3.0,A-4.0,A-5.0 Routed to Tim Woodard
Issue PAID IN FULL permit  8/27/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK8/24/2010 8/24/2010 PASS
DetailsTim L. Woodard
Approved with resubmittals
PLANS/APPL TAKEN TO FRONT DESK  8/24/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/24/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  8/24/2010 DONE
Telephone call  8/24/2010 DONE
t/c w glenn at ###-#### - permit ready and fees given
Permit Ready to Issue  8/24/2010 DONE
Details
Plan assigned to (TLW)8/13/2010 8/24/2010 PASS
DetailsTim L. Woodard
8/24/2010 08:06:03 TLW - activity updated through activity BLDA022 from case BLD10-01924.
Plan resubmittals received  8/20/2010 DONE
received 1 transmittal letter and 2 copies of sheets A-2.0,A-2.1 taken to Tim Woodard
1st review completed  8/19/2010 DONE
DetailsTim L. Woodard
Routing - FIRE  8/19/2010 PASS
DetailsTim L. Woodard
Field Verify
Routing - PLAN CHECK8/19/2010 8/19/2010 PASS
DetailsTim L. Woodard
Sent report to architect and discussed over the phone. TLW
Application received 8/13/20108/13/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  8/13/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/13/2010 DONE
DetailsTisha Gallop
Intake Approval  8/13/2010 PASS
DetailsTisha Gallop