Permit Information
Permit NumberBLD10-01957
StatusFinaled
Name BAR S CONSTRUCTION LLC
Site Address 818 E BOISE AVE
Project NameWells Fargo
Customer Number 
ePlanReviewNo
Description
(Wells Fargo) Permit for the interior remodel to an existing 3,146 sq. ft. building with work to include the removal and replacement of the teller line, removal of some interior nonbearing partition walls and one bearing wall, construction of some interior nonbearing partition walls and the enlargement of the existing restrooms to meet accessibility standards and the installation of related interior finishes. Work to be done per the approved plans, plan review report, attached engineering and any notations. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/6/20127/30/2012 DONE
Third Notice 8/4/20127/30/2012 DONE
First Notice 7/13/20127/27/2012 DONE
BLD-Aging Inspection7/3/20127/3/20127/3/2012 DONE
DetailsJim Storey
DOC - Permit Finaled  7/3/2012  
Permanent Occupancy  7/3/2012 DONE
BLD-Final4/8/20114/12/20114/12/2011APASS
DetailsJim Storey
signed occ card on site.
FIRE-Final Inspection4/7/20114/8/20114/8/2011APASS
DetailsForrest France
Life safety okay after adjustment made on site. Inspection passed.
BLD-Final4/7/20114/8/20114/8/2011PFAIL
DetailsJim Storey
Greg Olsen ###-#### signage ada/ exit sign removed
BLD-Aging Inspection3/8/20113/8/20113/11/2011 FAIL
DetailsJim Storey
no insp. informed bank to complet insp. of ele and fire then bld.no insp. informed bank to complet insp. of ele and fire then bld.
BLD-Aging Inspection1/3/20111/3/20111/3/2011 PART
DetailsJim Storey
no insp. informed bank to complet insp. of ele and fire then bld.
BLD-Framing/Rough-in11/1/201011/1/201011/1/2010PPASS
DetailsJim Storey
John Phone #: ###-####
BLD-Framing/Rough-in10/28/201010/29/201010/29/2010APART
DetailsTom Arcoraci
John if possible late morning Phone #: ###-#### bathrooms ok for cover
Issue PAID IN FULL permit  10/27/2010  
Plan assigned to (CDM)9/2/20109/2/201010/8/2010 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK9/2/2010 10/8/2010 PASS
DetailsCarl D Madsen
Case Summary (BLD)  10/8/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/8/2010  
Print Occupancy Form  10/8/2010 DONE
Telephone call  10/8/2010 DONE
DetailsTisha Gallop
called Jerrod/JGT Arch. and told him permit is ready, fees and need plm & mech (if applicable) values//10/8/10 leg
Permit Ready to Issue  10/8/2010 DONE
DetailsTisha Gallop
Plan resubmittals received  10/1/2010 DONE
DetailsTisha Gallop
received transmittal and two copies of plan sheets A3-01; taken to Carl Madsen
Plan resubmittals received  9/29/2010 DONE
DetailsTisha Gallop
received response letter, two copies of structural calcs and three copies of plan sheet A3-01; taken to Carl Madsen
Intake Approval  9/13/2010 PASS
Routing - FIRE  9/13/2010 PASS
Verify in field CDM
1st review completed  9/13/2010 FAIL
Acessible section is required at the teller line. 9-11-10 CDM
Plans ACCEPTED BY PLAN TECH  9/2/2010  
Application received 8/18/2010