Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-01993
StatusFinaled
Name DICKINSON CAMERON CONSTRUCTION
Site Address 350 N MILWAUKEE ST Unit: 1083
Project NameBTS - #1083 APPLE INC
Customer Number 
ePlanReviewNo
Description
(APPLE STORE - BTS - Ste # 1083 **RACKING**) Permit to add ten foot tall mobile storage racking in an existing stock room. Work to include: installation of prefabricated 10 foot tall storage racking including seismic bolting to existing slab. Approval of this permit is contingent on adhering to approved plans and engineering. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. (Special inspections on the anchor bolts are required per ICC/ESR - 1917)**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/5/201010/29/2010 DONE
Third Notice 10/16/201010/22/2010 DONE
faxed
Second Notice 9/19/201010/11/2010 DONE
First Notice9/3/20109/3/20109/9/2010 DONE
DetailsMike Jordan
BLD-Final9/2/20109/3/20109/3/2010APASS
DetailsMike Jordan
Fire Finals at 10 AM Phone #: ###-#### >> Inspection requested via web by Jim LeRoy
DOC - Permit Finaled9/3/20109/3/20109/3/2010PPASS
DetailsMike Jordan
FIRE-Final Inspection9/3/20109/3/20109/3/2010PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final9/2/20109/2/20109/2/2010PNR
DetailsMike Jordan
Shelving Phone #: ###-#### >> Inspection requested via web by Jim LeRoy
Issue PAID IN FULL permit  8/31/2010 DONE
DetailsTisha Gallop
Plan assigned to (TLW)8/20/2010 8/27/2010 PASS
DetailsTim L. Woodard
8/27/2010 14:44:34 TLW - activity updated through activity BLDA022 from case BLD10-01993.
Routing - PLAN CHECK8/20/2010 8/27/2010 PASS
DetailsTim L. Woodard
approved with engineering and special inspections. TLW
Routing - FIRE8/27/2010 8/27/2010 PASS
DetailsScott Arellano
No high pile storage.
Routing - PLAN CHECK8/27/2010 8/27/2010 PASS
DetailsTim L. Woodard
1st review completed  8/27/2010 DONE
Passed
PLANS/APPL TAKEN TO FRONT DESK  8/27/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/27/2010 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  8/27/2010  
Permit Ready to Issue  8/27/2010  
Telephone call  8/27/2010 DONE
8-27-10 Called Jim permit ready and fee given ///dld
Plans ACCEPTED BY PLAN TECH  8/20/2010 DONE
Application received 8/20/2010