Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD10-01995
StatusFinaled
Name RCH CONSTRUCTION
Site Address 3270 N MAPLE GROVE RD
Project NameDr. Thomas Curtis
Customer Number 
ePlanReviewNo
Description
(DR. THOMAS CURTIS) Permit is to remodel an existing 2,900 square foot dentists office (Emory Clinic - Fiche # 962659) for a new dental tenant. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create two fully accessible unisex toilet rooms and to create screen walls for the new operatories, installation of new plumbing fixtures, installation of new accessible doors / hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW** 3-23-11 PER GC FINAL CERT OF VALUE $ 31,650.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/28/20113/31/2011 DONE
DetailsChristina Prado
Mailed 3-31-11
First Notice 3/10/20113/18/2011 DONE
Case Summary (BLD)  3/2/2011 DONE
Print Occupancy Form  2/28/2011 DONE
Permanent Occupancy  2/28/2011 DONE
BLD-Final2/16/20112/17/20112/17/2011ANR
DetailsJim Sly
Noah phone
BLD-Final11/3/201011/4/201011/4/2010APASS
DetailsJim Sly
Noah ###-####
OK for Perm Occ.
BLD-Final10/29/201010/29/201011/1/2010PPART
DetailsJim Sly
Noah Phone #: ###-####
OK for Temp....OK for Perm when Plumb perms.
FIRE-Final Inspection10/29/201010/29/201010/29/2010PPASS
DetailsForrest France
Correction items okayed, life safety finaled.
BLD-Final10/28/201010/29/201010/29/2010ACANC
DetailsJim Sly
Noah Phone #: ###-####
Tisha called......NR.
Meeting  10/29/2010 DONE
DetailsScott Arellano
Onsite visit by the Fire Marshal (Mark Senteno) and the General Contractor (Noah Richter). The fire marshal has evaluated and approved the construction medical gas storage room.
FIRE-Final Inspection10/28/201010/28/201010/28/2010PFAIL
DetailsTroy Cobbley
The address needs to face Maple Grove, single action hardware needs to be provided on the rear exit door (do not install deadbolt) and the gas closet needs the required venting as per IFC chapter 30 (vents were not within 6" of ceiling and floor.
Routing - Erosion and Sediment10/28/2010 10/28/2010 PASS
Details
Minor exterior work, mainly landscaping, ESC permit not required.
BLD-Conference10/18/201010/19/201010/19/2010ADONE
DetailsJim Sly
noah Phone #: ###-####
Plan resubmittals received  9/21/2010 DONE
received 1 letter of transmittal, and 2 copies of sheet P-1 taken to Bill Vandegrift permit issued 9-12-10
Routing - PLUMBING9/21/2010 9/21/2010 PASS
DetailsBill VanDegrift
passed resubmittals for the med gas and vacuum system, one to the job site, the other to be included in the approved plans.
FIRE-Conference9/16/20109/16/20109/16/2010PDONE
DetailsTroy Cobbley
I went over life safety requirements with Noah which included door hardware, fire extinguishers and requirements for the medical gas closet which could include fire sprinklers. Noah needs to provide additional information the gas type stored and quantity.
BLD-Framing/Rough-in9/14/20109/16/20109/16/2010APASS
DetailsJim Sly
noah Phone #: ###-####
BLD-Conference9/7/20109/7/20109/7/2010PDONE
DetailsJim Sly
miller Phone #: ###-####
Met with Noah. Walk thru......
Issue PAID IN FULL permit  9/2/2010 DONE
Print Occupancy Form  9/1/2010 DONE
DetailsBarbara Stitt
Permit Ready to Issue  9/1/2010  
DetailsBarbara Stitt
Telephone call  9/1/2010 DONE
DetailsBarbara Stitt
Left voice message for Larry Knopp that permit is ready & fees due on 9-1-10 @ 3:30pm
Telephone call  9/1/2010 DONE
DetailsBarbara Stitt
Left voice message for Noah Richter that permit is ready and fees due on 9-1-10 @ 3:30pm
Routing - PLAN CHECK8/31/2010 8/31/2010 PASS
DetailsTim L. Woodard
Revisions emailed and attached to plans. TLW
PLANS/APPL TAKEN TO FRONT DESK  8/31/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/31/2010 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)8/20/2010 8/31/2010 PASS
DetailsTim L. Woodard
8/31/2010 17:12:53 TLW - activity updated through activity BLDA022 from case BLD10-01995.
Routing - PLAN CHECK8/25/2010 8/30/2010 FAIL
DetailsTim L. Woodard
Verbally relayed corrections to Oscar at LRK architects. Need 5 ft. manuvering clearance at door 13 on sheet A1.0. TLW
Routing - FIRE  8/30/2010 PASS
DetailsTim L. Woodard
1st review completed  8/30/2010 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK8/24/2010 8/25/2010 PEND
DetailsTim L. Woodard
routed to plumbing for review
Routing - PLUMBING8/25/2010 8/25/2010 PASS
DetailsBill VanDegrift
Applicant indicated conversation with Lee Rice and agreeance no plumbing plans were required. Switching Four operatory chairs to three. if any changes are made to the existing dental gas and vacuum system a plan will be required. additional cross connection protection may be required.
Routing - PUBLIC WORKS8/20/2010 8/24/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing8/23/2010 8/23/2010 PASS
DetailsApril Wing
Application received 8/20/20108/20/2010 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  8/20/2010  
Plans ACCEPTED BY PLAN TECH  8/20/2010  
ok per Tim Woodard for level 2
Intake Approval  8/20/2010 PASS
DetailsTim L. Woodard