Second Notice | | 3/28/2011 | 3/31/2011 | | DONE |
Christina Prado
|
|
|
Mailed 3-31-11
|
First Notice | | 3/10/2011 | 3/18/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/2/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/28/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/28/2011 | | DONE |
|
|
|
|
BLD-Final | 2/16/2011 | 2/17/2011 | 2/17/2011 | A | NR |
Jim Sly
|
|
|
Noah phone
|
BLD-Final | 11/3/2010 | 11/4/2010 | 11/4/2010 | A | PASS |
Jim Sly
|
|
|
Noah ###-#### OK for Perm Occ.
|
BLD-Final | 10/29/2010 | 10/29/2010 | 11/1/2010 | P | PART |
Jim Sly
|
|
|
Noah Phone #: ###-#### OK for Temp....OK for Perm when Plumb perms.
|
FIRE-Final Inspection | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | PASS |
Forrest France
|
|
|
Correction items okayed, life safety finaled.
|
BLD-Final | 10/28/2010 | 10/29/2010 | 10/29/2010 | A | CANC |
Jim Sly
|
|
|
Noah Phone #: ###-#### Tisha called......NR.
|
Meeting | | | 10/29/2010 | | DONE |
Scott Arellano
|
|
|
Onsite visit by the Fire Marshal (Mark Senteno) and the General Contractor (Noah Richter). The fire marshal has evaluated and approved the construction medical gas storage room.
|
FIRE-Final Inspection | 10/28/2010 | 10/28/2010 | 10/28/2010 | P | FAIL |
Troy Cobbley
|
|
|
The address needs to face Maple Grove, single action hardware needs to be provided on the rear exit door (do not install deadbolt) and the gas closet needs the required venting as per IFC chapter 30 (vents were not within 6" of ceiling and floor.
|
Routing - Erosion and Sediment | 10/28/2010 | | 10/28/2010 | | PASS |
|
|
|
Minor exterior work, mainly landscaping, ESC permit not required.
|
BLD-Conference | 10/18/2010 | 10/19/2010 | 10/19/2010 | A | DONE |
Jim Sly
|
|
|
noah Phone #: ###-####
|
Plan resubmittals received | | | 9/21/2010 | | DONE |
|
|
|
received 1 letter of transmittal, and 2 copies of sheet P-1 taken to Bill Vandegrift permit issued 9-12-10
|
Routing - PLUMBING | 9/21/2010 | | 9/21/2010 | | PASS |
Bill VanDegrift
|
|
|
passed resubmittals for the med gas and vacuum system, one to the job site, the other to be included in the approved plans.
|
FIRE-Conference | 9/16/2010 | 9/16/2010 | 9/16/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with Noah which included door hardware, fire extinguishers and requirements for the medical gas closet which could include fire sprinklers. Noah needs to provide additional information the gas type stored and quantity.
|
BLD-Framing/Rough-in | 9/14/2010 | 9/16/2010 | 9/16/2010 | A | PASS |
Jim Sly
|
|
|
noah Phone #: ###-####
|
BLD-Conference | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | DONE |
Jim Sly
|
|
|
miller Phone #: ###-#### Met with Noah. Walk thru......
|
Issue PAID IN FULL permit | | | 9/2/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/1/2010 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 9/1/2010 | | |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/1/2010 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Larry Knopp that permit is ready & fees due on 9-1-10 @ 3:30pm
|
Telephone call | | | 9/1/2010 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Noah Richter that permit is ready and fees due on 9-1-10 @ 3:30pm
|
Routing - PLAN CHECK | 8/31/2010 | | 8/31/2010 | | PASS |
Tim L. Woodard
|
|
|
Revisions emailed and attached to plans. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/31/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 8/20/2010 | | 8/31/2010 | | PASS |
Tim L. Woodard
|
|
|
8/31/2010 17:12:53 TLW - activity updated through activity BLDA022 from case BLD10-01995.
|
Routing - PLAN CHECK | 8/25/2010 | | 8/30/2010 | | FAIL |
Tim L. Woodard
|
|
|
Verbally relayed corrections to Oscar at LRK architects. Need 5 ft. manuvering clearance at door 13 on sheet A1.0. TLW
|
Routing - FIRE | | | 8/30/2010 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 8/30/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/24/2010 | | 8/25/2010 | | PEND |
Tim L. Woodard
|
|
|
routed to plumbing for review
|
Routing - PLUMBING | 8/25/2010 | | 8/25/2010 | | PASS |
Bill VanDegrift
|
|
|
Applicant indicated conversation with Lee Rice and agreeance no plumbing plans were required. Switching Four operatory chairs to three. if any changes are made to the existing dental gas and vacuum system a plan will be required. additional cross connection protection may be required.
|
Routing - PUBLIC WORKS | 8/20/2010 | | 8/24/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/23/2010 | | 8/23/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 8/20/2010 | 8/20/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/20/2010 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2010 | | |
|
|
|
ok per Tim Woodard for level 2
|
Intake Approval | | | 8/20/2010 | | PASS |
Tim L. Woodard
|
|
|
|