Permanent Occupancy | | | 9/8/2010 | | DONE |
|
|
|
|
BLD-Final | 8/31/2010 | 9/1/2010 | 9/1/2010 | P | PASS |
Mike Jordan
|
|
|
Lynda Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 8/31/2010 | 8/31/2010 | 8/31/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 8/25/2010 | 8/26/2010 | 8/26/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide missing sprinkler coverage in the closet located in the kitchen area and final inspections need to be passed on the two AES panels installed by simplexgrinnell
|
Plan assigned to (PEP) | 8/25/2010 | 8/25/2010 | 8/25/2010 | | PASS |
Perry Paine
|
|
|
8/25/2010 10:38:22 PEP - activity updated through activity BLDA022 from case BLD10-02012.
|
Case Summary (BLD) | | | 8/25/2010 | | |
|
|
|
|
1st review completed | | | 8/25/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/25/2010 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2010 | | DONE |
|
|
|
left vm for pranee at ###-#### - permit ready
|
Permit Ready to Issue | | | 8/25/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/25/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/23/2010 | | 8/25/2010 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 8/23/2010 | | 8/24/2010 | | DEFR |
Tim L. Woodard
|
|
|
|
Application received | | 8/23/2010 | 8/23/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/23/2010 | | DONE |
Tisha Gallop
|
|
|
|