First Notice | 10/27/2010 | 10/27/2010 | 11/15/2010 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 10/26/2010 | 10/27/2010 | 10/27/2010 | P | PASS |
Dave Hannah
|
|
|
tim - please call 1/2 hr prior so he can let you in Phone #: ###-####
|
DOC - Permit Finaled | 10/27/2010 | 10/27/2010 | 10/27/2010 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 10/26/2010 | 10/27/2010 | 10/27/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 9/7/2010 | 9/7/2010 | 9/8/2010 | P | NR |
Dave Hannah
|
|
|
call when on way//Tim Lindsey ###-#### needs fire to final first
|
FIRE-Final Inspection | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide a sprinkler study of the existing fire sprinkler system to verify that it will adequate coverage for the intended storage arrangement and height as stated on the permit application.
|
Issue PAID IN FULL permit | | | 8/27/2010 | | |
|
|
|
|
Plan assigned to (425) | 8/25/2010 | 8/25/2010 | 8/26/2010 | | PASS |
Dave Hannah
|
|
|
8/26/2010 11:07:13 425 - activity updated through activity BLDA022 from case BLD10-02029.
|
Intake Approval | | | 8/26/2010 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/26/2010 | | 8/26/2010 | | PASS |
Dave Hannah
|
|
|
|
Case Summary (BLD) | | | 8/26/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/26/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/26/2010 | | DONE |
|
|
|
|
Telephone call | | | 8/26/2010 | | DONE |
|
|
|
t/c w tim at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/26/2010 | | DONE |
|
|
|
|
Application received | | 8/25/2010 | 8/25/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/25/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 8/25/2010 | | PASS |
Tisha Gallop
|
|
|
|