BLD-Final | 9/22/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Mike Jordan
|
|
|
Breanna Phone #: ###-####. ok for perm. occ.
|
FIRE-Final Inspection | 9/22/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 9/23/2010 | | |
|
|
|
|
FIRE-Final Inspection | 9/22/2010 | 9/22/2010 | 9/22/2010 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the smoke evac system only which passed.
|
FIRE-Final Inspection | 9/17/2010 | 9/20/2010 | 9/20/2010 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for a list of corrections required which include providing exit signs and emergency lighting, current inspection tags for the fire extinguishers, removing the deadbolt from the rear door and lowering the storage in the storage room.
|
BLD-Final | 9/17/2010 | 9/20/2010 | 9/20/2010 | A | FAIL |
Mike Jordan
|
|
|
Breanna Phone #: ###-####. Fire/life/safety failed.
|
Issue PAID IN FULL permit | | | 9/17/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/1/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/1/2010 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2010 | | DONE |
Barbara Stitt
|
|
|
Called Bon Potrus And told her that permit is ready//9-1-10 @ 11:00am
|
1st review completed | | | 8/31/2010 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/31/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 8/25/2010 | | 8/31/2010 | | PASS |
Tim L. Woodard
|
|
|
8/31/2010 17:38:56 TLW - activity updated through activity BLDA022 from case BLD10-02030.
|
Routing - PLAN CHECK | 8/25/2010 | | 8/31/2010 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | 8/25/2010 | 8/25/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2010 | | DONE |
Tisha Gallop
|
|
|
|
(F) Reprint permit | | | 8/25/2010 | | DONE |
|
|
|
|
First Notice | | 10/3/2010 | | | |
|
|
|
|