Second Notice | | 1/1/2011 | 12/27/2010 | | DONE |
|
|
|
|
First Notice | | 12/9/2010 | 12/22/2010 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 11/29/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 11/22/2010 | 11/23/2010 | 11/23/2010 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 11/22/2010 | 11/23/2010 | 11/23/2010 | A | PASS |
Mike Jordan
|
|
|
ok for perm occ.
|
FIRE-Final Inspection | 11/22/2010 | 11/23/2010 | 11/23/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | NR |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Needs life/safety inspection.
|
FIRE-Final Inspection | 11/18/2010 | 11/19/2010 | 11/19/2010 | P | FAIL |
Troy Cobbley
|
|
|
The smoke evac system failed to operate. Even when the smoke detector head was removed no trouble was reported at the main facp.
|
BLD-Other | 11/10/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Ceiling grid ok.
|
BLD-Framing/Rough-in | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | NR |
Mike Jordan
|
|
|
ceiling insp//Jason Phone #: ###-####. Needs rough in inspections.
|
BLD-Framing/Rough-in | 10/21/2010 | 10/22/2010 | 10/22/2010 | P | PASS |
Mike Jordan
|
|
|
jason Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/15/2010 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 8/30/2010 | 8/30/2010 | 10/8/2010 | | PASS |
Dan Stuart
|
|
|
Plan re-assigned to Dan Stuart from Tim woodard
|
Routing - PLAN CHECK | 10/8/2010 | | 10/8/2010 | | PASS |
Dan Stuart
|
|
|
Discussion with Jesslyn Quiram, Finn-Daniels Arch. concerning structural design and calcs for roll-up grill, structural support and connections. Request letter provided asking for status as Deferred Submittal per IBC Sec. 106.4.3.2 IBC. Red-lined on plans and attached a copy of draft request letter. To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2010 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 10/8/2010 | | DONE |
|
|
|
t/c w jesslyn at ###-#### x15 - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 10/8/2010 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/7/2010 | | DONE |
|
|
|
Copy of original plan review with item #1a not answered as part of plan resubmittals of 10/5/10. Copy with cover letter e-ailed to Katie Butler, CSHQA, local firm hired to address the structural plan review concerns and a copied forwarded to Jesslyn Fiedler. architect in follow-up to phone calls to both to discuss missing submittals.
|
Telephone call | | | 10/7/2010 | | DONE |
|
|
|
Jesslyn Fiedler, Finn-Daniels Arch. to discuss missing response to plan review item #1a for structural calcs and details for steel columns, base plates, connections, support for rolling security grill and lateral support for top of columns while maintining the deflection required for the structural load of roof / floors at mall. Jesslyn was not available so I left a voice message to call me.
|
Telephone call | | | 10/7/2010 | | DONE |
|
|
|
Called Katie Butler, CSHQA, local structural design firm hired to address structural plan review questions for Bare Escentuals T.I., to discuss missing response to plan review item #1a for structural calcs and details for steel columns, base plates, connections, support for rolling security grill and lateral support for top of columns while maintining the deflection required for the structural load of roof / floors at mall. Katie did not have copy of original plan review and ask that I send her a copy and she would discuss with Dana Hennis, Structural Engineer. I e-mailed her a copy of report with options of delaying issuing of permit while plans & engineering were prepared, submitted and reviewed for approval or if it would work providing a written request to handle the design data as a deferred submittal per section 106.3.4.2, 2006 IBC, then plans would be taken to permit desk to process for issuing building permit.
|
Routing - PLAN CHECK | 10/1/2010 | | 10/7/2010 | | FAIL |
Dan Stuart
|
|
|
Missing resubmittal details and calcs for P.R. # 1a on structural design of rolling security grill, support, connections and lateral while provide ability for structure deflection at columns.
|
Telephone call | | | 10/5/2010 | | DONE |
|
|
|
Call from Vince of Dunham Assoc. concerning air change design requirements of original mall system - 6 air changes per hour. Has shown design data and ducting for smoke control system on plans.
|
Plan resubmittals received | | | 10/5/2010 | | DONE |
Tisha Gallop
|
|
|
received transmittal, response letter from architect, resopnse letter from engineer, ES Report, two copies of structural calculations, two copes of plan sheets A0.1, A2.1, A3.0, A4.0, A6.1, A6.2, A6.3, SP-2, S1.0, M1.0, M2.0; taken to Dan Stuart
|
Telephone call | | | 10/4/2010 | | DONE |
|
|
|
Call from Jesslyn, Architectto discuss plan review item and to let me know resubmittals should be coming in this week.
|
Routing - PLUMBING | 9/30/2010 | | 10/1/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 9/28/2010 | | 9/30/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 9/14/2010 | | 9/29/2010 | | FAIL |
Dan Stuart
|
|
|
Routed to PW for fee evaluation then to be routed to plumbing plan review.
|
Routing PW Sewer Rating | 9/29/2010 | | 9/29/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Plan Reviewer's activity | | | 9/28/2010 | | DONE |
|
|
|
Received e-mail from Jesslyn, architect stating plan resubmittals will be turned in Oct 1st or 4th and asking how long to have resubmittals reviewed. Contractor scheduled to start work on the 11th of Oct. I e-mailed her that we had three working days in which to review resubmittals and if resubmittals were complete the permit should be ready to pick up before the 11th. She ask about a demo permit and I told her a demo plan and C.V. was needed and we could issue a demo permit for non-structural work.
|
1st review completed | | | 9/14/2010 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 9/8/2010 | | 9/14/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 8/30/2010 | | 9/8/2010 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. copy of plan review e-mailed to architect. Plans routed to fire code analyst for review.
|
Plan resubmittals requested | | | 9/8/2010 | | FAIL |
|
|
|
Copy of plan review to architect requiring resubmittals.
|
Plan assigned to (TLW) | 8/27/2010 | | 8/30/2010 | | DEFR |
Tim L. Woodard
|
|
|
Plan re-assigned to Dan Stuart 8/30/10
|
Routing - PLAN CHECK | 8/27/2010 | | 8/30/2010 | | PEND |
Tim L. Woodard
|
|
|
Plan re-assigned to Dan Stuart
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/2010 | | DONE |
|
|
|
|
Application received | | 8/26/2010 | | | |
|
|
|
|