Second Notice | | 10/25/2012 | 10/16/2012 | | DONE |
Christina Prado
|
|
|
complete 10-16-2012
|
First Notice | | 9/24/2012 | 10/15/2012 | | DONE |
|
|
|
faxed 10-15-12
|
BLD-Conference | 9/13/2012 | 9/14/2012 | 9/14/2012 | A | CANC |
Mike Jordan
|
|
|
Final Inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Final | 9/14/2012 | 9/14/2012 | 9/14/2012 | A | PASS |
Mike Jordan
|
|
|
Final Inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer. Ok for perm occ.
|
Permanent Occupancy | | | 9/14/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Conference | 9/12/2012 | 9/12/2012 | 9/12/2012 | P | PART |
Mike Jordan
|
|
|
Final Building Inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer. HAndrail has been repaired. Ok for temp occ. Waiting on letter from engineer of record to accomidate final letter from special inspection agency.
|
BLD-Conference | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | NR |
Mike Jordan
|
|
|
Final building inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer. Needs to repair handrail in shop.
|
Plan Reviewer's activity | | | 9/7/2012 | | DONE |
Jason Blais
|
|
|
Modification approval to Toilet Room #154 accepted. Copy attached to this case.
|
FIRE-Alarm Testing | 9/6/2012 | 9/6/2012 | 9/6/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/4/2012 | 9/5/2012 | 9/5/2012 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to sign off when the project related fire alarm permit is addressed.
|
Zoning Approval | 9/5/2012 | 9/5/2012 | 9/5/2012 | | DONE |
Cody Riddle
|
|
|
|
PubWorks Occupancy Approval | 9/5/2012 | 9/5/2012 | 9/5/2012 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Conference | 9/4/2012 | 9/4/2012 | 9/4/2012 | A | CANC |
Troy Cobbley
|
|
|
Life Safety inspection rescheduled for tomorrow when the fire alarm and fire sprinkler permits are addressed.
|
BLD-Conference | 8/24/2012 | 8/24/2012 | 8/24/2012 | A | DONE |
Mike Jordan
|
|
|
Final Building inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer. Walk through with contractor. Noted that not all glazing is in place or door hardware. Needs to repair handrails in shop, provide guard at chiller. ADA unisex restroom has been made compliant. A letter has been sent to building official regarding the non compliant restroom. Also need as built drawings for review.
|
FIRE-Conference | 8/21/2012 | 8/22/2012 | 8/23/2012 | P | DONE |
Troy Cobbley
|
|
|
Scott and I went over life safety requirements for the project.
|
BLD-Conference | 8/18/2012 | 8/21/2012 | 8/21/2012 | A | CANC |
Mike Jordan
|
|
|
Life Safety Preliminary inspection with Troy Cobbley Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Conference | 8/7/2012 | 8/8/2012 | 8/8/2012 | A | DONE |
Mike Jordan
|
|
|
8:30 AM walk through of handrails etc. Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Conference | 8/2/2012 | 8/2/2012 | 8/2/2012 | A | PASS |
Tom Arcoraci
|
|
|
Lower Level Ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Scott Greer ok 408
|
BLD-Conference | 7/26/2012 | 7/26/2012 | 7/26/2012 | A | PASS |
Mike Jordan
|
|
|
Suspended ceiling re inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer. grid ceiling, main level ok to cover. additional support has been added per cicsca0-2 standard.
|
BLD-Conference | 7/16/2012 | 7/17/2012 | 7/20/2012 | A | PART |
Mike Jordan
|
|
|
Ceiling inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer. Adminstrative office and changing rooms. Need letter from engineer for alternate on hanger wires for diffusers.
|
BLD-Framing/Rough-in | 7/13/2012 | 7/16/2012 | 7/16/2012 | A | DONE |
Mike Jordan
|
|
|
Ceiling inspections rooms 159, 177, 149, 136, 145, 142, 140, 141, 143. Phone #: ###-#### >> Inspection requested via web by Scott Greer. Went over CISCA requirements with contractor, no inspections.
|
BLD-Conference | 7/13/2012 | 7/13/2012 | 7/13/2012 | A | PART |
Mike Jordan
|
|
|
Ceiling inspections rooms 159, 177, 149, 136, 145, 142, 140, 141, 143. Phone #: ###-#### >> Inspection requested via web by Scott Greer. Grid inspection at locker rooms, Need wires on diffusers.
|
BLD-Conference | 5/4/2012 | 5/4/2012 | 5/4/2012 | P | PASS |
Mike Jordan
|
|
|
Framing inspection Maintenance shop Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Conference | 4/27/2012 | 4/30/2012 | 4/30/2012 | A | PASS |
Mike Jordan
|
|
|
Framing re inspection area E Phone #: ###-#### >> Inspection requested via web by Scott Greer. Vapor barrier material in area E has been removed and replaced with compliant vapor barrier.
|
BLD-Conference | 4/24/2012 | 4/24/2012 | 4/24/2012 | P | PART |
Mike Jordan
|
|
|
Framing inspection in area E Phone #: ###-#### >> Inspection requested via web by Scott Greer. Interior steel stud framed walls and hardlids At area E and basement, Pending other trades rough in inspections. Also received tech data for spray foam insulation that has been used in area E. Flame and smoke spread indexes o. Will also remove some non compliant visquin in concelled areas and provide the correct visquin.
|
BLD-Conference | 3/20/2012 | 3/20/2012 | 3/20/2012 | A | PASS |
Mike Jordan
|
|
|
Framing inspection in area D Inclusive grid lined 6 to 11. Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Conference | 2/16/2012 | 2/23/2012 | 2/24/2012 | A | CANC |
Jim Sly
|
|
|
Went to job site.....they didn't call this in.
|
BLD-Framing/Rough-in | 2/16/2012 | 2/16/2012 | 2/16/2012 | P | PASS |
Mike Jordan
|
|
|
roof framing and sheathing for overbuild at south enterance.
|
FIRE-Conference | 2/14/2012 | 2/14/2012 | 2/14/2012 | P | DONE |
Troy Cobbley
|
|
|
Carl Westfall and I performed a job site review of the exit signs in areas A and B. I let the superintendant Scott know that they need to be installed as per approved plans and the two that are blocked by the low soffits will need to be viewable from the far end of the corridor.
|
BLD-Conference | 2/14/2012 | 2/14/2012 | 2/14/2012 | A | CANC |
Mike Jordan
|
|
|
Site sewer inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Conference | 2/2/2012 | 2/9/2012 | 2/9/2012 | A | PASS |
Mike Jordan
|
|
|
Interior steel stud framed walls and hardlids for area C. Also walk through mech. room and reviewed special inspection reports.
|
BLD-Other | 2/3/2012 | 2/3/2012 | 2/3/2012 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Other | 2/3/2012 | 2/3/2012 | 2/3/2012 | A | PASS |
Mike Jordan
|
|
|
witness epxoy bolting for tw holddowns on shearwalls at gridline 2.
|
BLD-Conference | 1/25/2012 | 2/2/2012 | 2/2/2012 | A | DONE |
Mike Jordan
|
|
|
reviewed special inspection reports via email and spoke to scott about exit light issues and exiting issues.
|
BLD-Conference | 1/27/2012 | 1/27/2012 | 1/27/2012 | P | DEFR |
Mike Jordan
|
|
|
Footing rebar inspection for plan mod # 4 Phone #: ###-#### >> Inspection requested via web by Scott Greer. Special inspector on site.
|
BLD-Conference | 1/25/2012 | 1/25/2012 | 1/26/2012 | P | PASS |
Mike Jordan
|
|
|
Reviewed special inspection reports and walked jobsite.
|
CHANGE STATUS TO (ISS) | | | 1/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 1/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CJW) | 1/17/2012 | 1/17/2012 | 1/19/2012 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 1/17/2012 | | 1/19/2012 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2012 | | PASS |
|
|
|
Approved Plan Modification #4.
|
Case Summary (BLD) | | | 1/19/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 1/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/19/2012 | | DONE |
Barbara Stitt
|
|
|
Called and left a message for Brian Bennion that permit is ready & fees due on 1-19-12 @ 1:40pm//BAS
|
Plan Modification Accepted | | | 1/17/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification (4) accepted for the south corner of the Annex Entrance building to the west end of the facility has over the years received several additions and infill project remodels. The southern corner at grid line 3 needs to resolved with a previous exterior wall of an earlier addition. See sheet A102 and A111. The work involved with the plan modification involves removing the exterior marble tiles, building a new wall with footings and extending the slab to fill in floor at the corner as the walls are being aligned at this corner. Additionally these sheets indicate a change to the roof repairs and duct work weatherproofing. None of the work on the roof will be visible from the immediate or adjoining properties. Earlier design for exposed duct work on the roof would have been, thus this change. Submitted on plan sheets A102, A111, A113; routed to Carl Westfall.
|
BLD-Conference | 1/5/2012 | 1/5/2012 | 1/5/2012 | A | PASS |
Mike Jordan
|
|
|
Framing inspection between grid lines 13 - 17 and D - L Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Framing/Rough-in | 1/5/2012 | 1/5/2012 | 1/5/2012 | P | PASS |
Mike Jordan
|
|
|
Framing inspection between grid lines 13 - 17 and D - L Phone #: ###-#### >> Inspection requested via web by Scott Greer. Interior steel sted framed walls and hardlids ok. Pending fire sprinkler rough in inspection.
|
BLD-Other | 12/27/2011 | 12/27/2011 | 12/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
scott - shear nail Phone #: ###-#### hall 166 ok
|
BLD-Conference | 12/22/2011 | 12/22/2011 | 12/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
Framing inspection area A Rooms 181 - 205 Phone #: ###-#### >> Inspection requested via web by Scott Greer a area ok
|
BLD-Conference | 12/1/2011 | 12/22/2011 | 12/21/2011 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 12/14/2011 | 12/15/2011 | 12/15/2011 | P | DONE |
Mike Jordan
|
|
|
Gypsum nailing inspection. any time Concrete wall rebar inspection at chiller building. Special inspector at 1:00 PM. Concrete scheduled at 1:30 PM Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Foundation | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | PASS |
Mike Jordan
|
|
|
Gypsum nailing inspection. any time Concrete wall rebar inspection at chiller building. Special inspector at 1:00 PM. Concrete scheduled at 1:30 PM Phone #: ###-#### >> Inspection requested via web by Scott Greer. Vertical and horizontal reinforcement for W1 type walls at grids X12 and and grid Xc per RFI#282.1(These walls are to be architectual concrete. Previously they were to be masonry walls). Noted that vertical reinforcement at these walls was already placed at 12" o.c.
|
BLD-Conference | 12/1/2011 | 12/15/2011 | 12/15/2011 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 12/15/2011 | 12/15/2011 | 12/15/2011 | A | PASS |
Mike Jordan
|
|
|
Shear wall holdowns at rooms 164 and 175 (mens and womens restroom) per ASI #5. ok to place plywood after electrical rough in inspection passes.
|
BLD-Conference | 12/1/2011 | 12/8/2011 | 12/8/2011 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 12/8/2011 | 12/8/2011 | 12/8/2011 | A | PASS |
Mike Jordan
|
|
|
Interior Steel stud construction for walls, soffits and catwalks for rooms 192, 193, 194, 195 and 182. Also inspected guards for noted catwalks.
|
FIRE-Conference | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | DONE |
Troy Cobbley
|
|
|
I requested Tim Frost to accompany me to this project to verify possible issues with combustible concealed spaces that I had found on the previous days courtesy inspection. We found many areas which have not been provided upright sprinkler protection and when protection is provided will require many additional sprinkler heads. Per the city approved plans only pendant protection below the ceilings has been provided in these areas. I spoke to the sprinkler fitter and let him know that Plan Modifications will be required. I also spoke to Frank and Ricardo with Jacobsen Construction about a possible stop work order if any more piping is covered and the possibility of removing ceilings just to inspect what has already been installed and covered. No sprinkler rough-in inspections have been performed to this point. I notified Scott and Romeo of the situation.
|
BLD-Conference | 11/30/2011 | 12/1/2011 | 12/1/2011 | P | PASS |
Mike Jordan
|
|
|
Rebar inspection in the north west garden retaining wall. Concrete scheduled for 2:00PM. Special inspector scheduled for 1:00
Epoxy hold down inspections for interior shear walls. Any time in PM Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Foundation | 12/1/2011 | 12/1/2011 | 12/1/2011 | P | PASS |
Mike Jordan
|
|
|
Exterior northwest garden retaining wall. Will have special inspection.
|
BLD-Framing/Rough-in | 12/1/2011 | 12/1/2011 | 12/1/2011 | P | PASS |
Mike Jordan
|
|
|
Simpson htt14 tie downs at interior shearwall on grid 15.8. Also reviewed special inspection reports.
|
BLD-Conference | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | PASS |
Mike Jordan
|
|
|
Chiller shop footing and rebar inspection east end. Concrete scheduled for 1:00 ans special inspector at 12:00 Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
CHANGE STATUS TO (ISS) | | | 11/14/2011 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 11/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/10/2011 | | DONE |
Christina Prado
|
|
|
Left Brian a message giving fees due
|
Permit Ready to Issue | | | 11/10/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 11/7/2011 | 11/7/2011 | 11/9/2011 | | PASS |
Carl Westfall
|
|
|
LDS TEMPLE ADDITION AND REMODEL
|
Routing - PLAN CHECK | 11/7/2011 | | 11/9/2011 | | PASS |
Carl Westfall
|
|
|
Plan modification approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2011 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/7/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification (3) accepted for Bld10-02069 (LDS Temple remodel and addition) because the code sheets F101 and F102 were re-evealuated for code occupancy to show the total occupant load below 1000 occupants. An attached spread sheet has also been included in this application to clearly show the differences and totals. The architect's reveiw of each of the spaces generally followed the numbers calculated by the City with only a few minor differences. In waiting areas 133, 138, and 151 also serve as circulation corridors. The non circulation square footage of these rooms was recalculated to show the non circulation spaces in these rooms. An additional Plan Mod will be following to show room changes in the plans for the Chapel 135 and Office areas 42. As well as vestibule 100. The owner has made these changes to the plans since permitting; submitted on plan sheets F101 and F102; routed to Carl Westfall.
|
BLD-Conference | 10/10/2011 | 11/2/2011 | 11/2/2011 | A | PASS |
Mike Jordan
|
|
|
Reviewed special inspector reports. Aslo noted backfilling operations for water feature and at chiller room.
|
BLD-Foundation | 11/2/2011 | 11/2/2011 | 11/2/2011 | P | PART |
Mike Jordan
|
|
|
Stemwall for pump house and trash enclosure. Work in progress on installing vertical reinforcement. All per approved plans and RFI from engineer.
|
BLD-Conference | 10/26/2011 | 10/28/2011 | 10/28/2011 | A | PASS |
Mike Jordan
|
|
|
Chiller room walls. Formwork and rebar. Concrete scheduled for 1:00 Friday. Rebar is ready to inspect any time Thursday all doay or Friday morning. Special inspector scheduled for Thursday to look at rebar. Special inspector scheduled for Friday at 1:00 to cast 2 sets of cylinders during pour Phone #: ###-#### >> Inspection requested via web by Scott GreerW3 and W5 type walls ok. as per plans and RFI's.
|
BLD-Conference | 10/26/2011 | 10/26/2011 | 10/26/2011 | P | PASS |
Mike Jordan
|
|
|
Reviewed special inspection reports. Also noted RFI #219, from structural engineer, repairing the omition of #6 bar at wall type W3. Additional #5 will be placed at 32" o.c. at inside face of wall at areas not integral with drilled piers. Also noted work in progress on interior moment frames on south end of building. Noted that their will be an additional plan modification for west vestibule to be submitted by architect.
|
BLD-Conference | 10/10/2011 | 10/26/2011 | 10/26/2011 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 10/24/2011 | 10/25/2011 | 10/25/2011 | A | DEFR |
Mike Jordan
|
|
|
Partial footing inspection for the chiller building. Concrete cheduled for 10:00 AM Special inspector scheduled for 9:00 AM Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD-Footing | 10/20/2011 | 10/21/2011 | 10/21/2011 | A | PART |
Jim Storey
|
|
|
scott - rebar footing and wall Phone #: ###-#### west 1/2 of south wall wip mti to be on site at pm placment time. vert descrepincy for #6 bar to be addressed by engineer for next wall section.
|
BLD-Conference | 10/10/2011 | 10/19/2011 | 10/19/2011 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 10/15/2011 | 10/17/2011 | 10/17/2011 | A | PART |
Mike Jordan
|
|
|
Interior Stair rebar. Shop wall rebar. Special inspector scheduled at 12:00 noon. Concrete scheduled for 1:00 PM >> Inspection requested via web by Scott Greer
|
BLD-Conference | 10/13/2011 | 10/14/2011 | 10/14/2011 | P | PART |
Jim Sly
|
|
|
Rebar in foundation wall concrete scheduled for 3:00 PM Special inspection. >> Inspection requested via web by Scott Greer small section of 8' high wall at South side of bldg. MTI has inspected.
|
BLD-Conference | 10/10/2011 | 10/12/2011 | 10/12/2011 | A | PASS |
Mike Jordan
|
|
|
Reviewed special inspection reports, Work in progress on south retaining wall, and on catwalk on interior of building.
|
BLD-Conference | 10/8/2011 | 10/10/2011 | 10/10/2011 | P | CANC |
Mike Jordan
|
|
|
Rebar inspection fro Shop and chiller building walls. Special inspection scheduled for Monday afernoon. Pour on Tuesday >> Inspection requested via web by Scott Greer
|
BLD-Foundation | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PART |
Mike Jordan
|
|
|
South retaining aloong piers. Work is in progress. Will have special inspection prior to concrete placement.
|
BLD-Conference | 10/7/2011 | 10/7/2011 | 10/7/2011 | P | PART |
Mike Jordan
|
|
|
Inspection on rebar prior to form placement at new chiller, boiler area.
|
BLD-Conference | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | PASS |
Mike Jordan
|
|
|
Shear wall inspection Grid line 23 Phone #: ###-#### >> Inspection requested via web by Scott Greer. Shearwall at gridline 23 ok, as per ASI#23, will need to submit plan mod.
|
BLD-Conference | 9/20/2011 | 9/21/2011 | 9/21/2011 | P | PASS |
Mike Jordan
|
|
|
Foundation inspection Concrete scheduled for 2:30 Special inspection scheduled at 2:00 Phone #: ###-#### x801 >> Inspection requested via web by Scott Greer. Stemwall and column pad pedestals at annex addition. Special inspector on site. Also work in progress on interior piers at shear wall locations.
|
BLD-Footing | 9/19/2011 | 9/20/2011 | 9/20/2011 | A | PART |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Footings for annex addition. Special inspector also on site.
|
CHANGE STATUS TO (ISS) | | | 9/19/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Footing | 9/16/2011 | 9/16/2011 | 9/16/2011 | A | DEFR |
Mike Jordan
|
|
|
scott - ###-#### - pouring at 9:00 am
|
Plan assigned to (CJW) | 9/13/2011 | 9/13/2011 | 9/16/2011 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 9/13/2011 | | 9/16/2011 | | PASS |
Carl Westfall
|
|
|
Approved plan modification to relocate the Fire Department connection and the post indicator valve and to replace hanging catwalk with non-hanging catwalk.
|
Override - Parcel Holds | | | 9/16/2011 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2011 | | DONE |
|
|
|
Plan modification approved.
|
Print Occupancy Form | | | 9/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/16/2011 | | DONE |
|
|
|
t/c w brian - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 9/16/2011 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/13/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld10-02069 (LDS Temple remodel & addition) for the existing 6" water main running under the previous grounds maintenance shop on the south side of the property will be abandoned by United Water to a point East of the property fence along Cole Rd at the current tie in location. From there the fire protection devices a FDC and a PIV will connect to that water main to supply the fire riser and building sprinkler system. United water also requested that no fire hydrant be connected to this line. The existing hydrant at the SW corner of the building will be abandoned. Coverage for the site will remain with 3 existing hydrants. RE: sheets FP100 & FP101. Also with this application there is a revision to the mechanical access platform system as indicated on sheet S302; Submitted on plan sheets FP100, FP101, S302; routed to Carl Westfall.
|
BLD-Other | 8/26/2011 | 8/26/2011 | 8/26/2011 | P | PART |
Mike Jordan
|
|
|
Drill ---Richardo Phone #: ###-####. REmainder of drilled piers on south side of building, special inspectors were on site observing the drilling adn will inspect rebar and test concrete.
|
BLD-Footing | 8/26/2011 | 8/26/2011 | 8/26/2011 | A | PART |
Mike Jordan
|
|
|
Richardo Phone #: 801-577-971. RFeinforcement for concrete stairs, went over noising requirements with contractor. Willl have special inspection.
|
BLD-Concrete | 8/25/2011 | 8/25/2011 | 8/25/2011 | P | PART |
Mike Jordan
|
|
|
ricardo - ###-####. Work in progress on drilled piers south end, special inspector on site. Aslo inspected the nearly completed interior footings for existing columns that were moved to gridline 15.6 and remainder of column footing work on grid 25.5.
|
CHANGE STATUS TO (ISS) | | | 8/25/2011 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
Plan resubmittals received | | | 8/25/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of revised Project Manual #2; taken to Carl Westfall.
|
BLD-Concrete | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | PASS |
Mike Jordan
|
|
|
Drilling piers inspection please-Ricardo Phone #: ###-####. Noted special inspector on site during the drilliong of the drilled piers and rebar and concrete.
|
Plan assigned to (CJW) | 8/16/2011 | 8/16/2011 | 8/24/2011 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 8/16/2011 | | 8/24/2011 | | PASS |
Carl Westfall
|
|
|
Plan modification to Consultant Structural Engineer
Called Action Courier for pick up on 8-16-11 @9:40am
Consultant approved the plan modification but had a few issues he wanted clarified.
|
Routing Off Site - STRUCTURAL | 8/24/2011 | | 8/24/2011 | | PASS |
Carl Westfall
|
|
|
Called Action Courier for pick up 8-24-11 @ 8:50am
Drawings and calculations clarify issues the Consultant had.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/24/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/24/2011 | | DONE |
|
|
|
t/c w brian - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 8/24/2011 | | DONE |
|
|
|
|
BLD-Concrete | 8/23/2011 | 8/23/2011 | 8/23/2011 | P | PART |
Mike Jordan
|
|
|
Ricardo Donoso Phone #: ###-####. Drilled piers. south side of bldg. Noted special inspector on site. Noted to jacobsen construction that special inspection is required o n drilled concrete for drilled piers as per approved plans, specs and chapter 17 if the IBC, continous special inspection is also required while piers ore being drilled.
|
Plan resubmittals received | | | 8/23/2011 | | |
|
|
|
Received 1 cover transmittal, 3 copies of response letter from CTA dated 8-23-11 with claculations, 3 copies of sheet S305 and taken to Carl Westfall//BAS
|
BLD-Footing | 8/19/2011 | 8/22/2011 | 8/22/2011 | P | PASS |
Mike Jordan
|
|
|
Ricado this is for the out side footings only Phone #: ###-####. Drilled piers # 27.30,32.
|
BLD-Footing | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | PART |
Tom Arcoraci
|
|
|
scott - ###-#### - exterior footing spec insp on site
|
BLD-Footing | 8/18/2011 | 8/18/2011 | 8/18/2011 | A | PART |
Mike Jordan
|
|
|
Scott Greer ###-#### per Scott this inspection has nothing to do with the plan mod in review. Drilled piers south side, work in progress.
|
Override - Parcel Holds | | | 8/18/2011 | | |
|
|
|
|
Override - Parcel Holds | | | 8/18/2011 | | |
|
|
|
|
BLD-Footing | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | NR |
Mike Jordan
|
|
|
Soils issues with driiled piers, wating for geo-tech and engineering response.
|
BLD-Footing | 8/12/2011 | 8/15/2011 | 8/15/2011 | P | PART |
Mike Jordan
|
|
|
Rebar & epoxy by special inspector at 9:00 AM Rebar and footing inspection needed at 1:00 if possible Concrete scheduled at 2:00 PM Phone #: ###-#### >> Inspection requested via web by Ricardo Donosso. Grade beam footings on grid line 23, North portion of building (ordinance room). Noted that their has been a structural change to footings from city set of approved plans, a plan mod needs to be sumbitted to cty for approval.
|
Plan Modification Accepted | | | 8/15/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld10-02069 (LDS Temple Remodel and Addition) for the lateral system along grid 23(s305) has been strenghtened from the original (7/23/11) drawings so as to replace the existing lateral systems capacity, part of which is to be removed as originally proposed. A steel moment frame will replace the existing steel strap bracing. Actual as-built conditions that were not observed in the as-bilt drawings have prompted this modification. Submitted on plan sheet S305 and structural calcs; routed to Carl Westfall.
|
Issue PAID IN FULL permit | | | 8/12/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/11/2011 | | DONE |
|
|
|
left vm for josh for a call back regarding expiration of this permit
|
Telephone call | | | 8/11/2011 | | DONE |
|
|
|
received a call back from ricardo of jaconsen construction - he said he should be getting the check from the owner tomorrow and he would be down to pick up the plans
|
Permit Ready to Issue | | | 8/2/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/2/2011 | | DONE |
Tisha Gallop
|
|
|
called Brian Bennion and left vm permit is ready and fees.
|
Routing Off Site - STRUCTURAL | 7/14/2011 | | 8/2/2011 | | PASS |
Barbara Stitt
|
|
|
Per Consultant Structural Engineer "We have reviewed the engineers responses on the LDS Temple Renovation and we have no additional comments or questions."
|
Plan assigned to (CJW) | 9/1/2010 | 9/1/2010 | 8/1/2011 | | PASS |
Carl Westfall
|
|
|
1st review done
|
Routing - PLANNING | 8/1/2011 | | 8/1/2011 | | PASS |
David Moser
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/1/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/15/2011 | | 7/30/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Telephone call | | | 7/28/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up.
|
Plan resubmittals received | | | 7/27/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of structual review comments and three sets of new structural calcs. Routed to Carl Westfall for review
|
Plan resubmittals received | | | 7/25/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of transmittal, response, and three copies of plan sheets G102, F101, F102, L100, L105, A101, A102, A011, A111, A112, A304, A305, A901, FD101, FP101, PD100, PL100, MD100, MH100, E-005, EP100, EP401, EL104, EL401, EX103, EX104; taken to Carl Westfall.
|
Routing - FIRE | 7/13/2011 | | 7/15/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 7/1/2011 | | 7/13/2011 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Saturday July 2 and was finished on Wednesday July 13 (10 days). Revised drawings were required. See the 3rd IBC plan review report. Plan review report was E-mailed to the Architect.
|
Plan resubmittals received | | | 7/13/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of response and three copies of structural calcs and plan sheets S002, S302, S303, S304, S305, S306; taken to Carl Westfall.
|
Routing - PLANNING | 6/30/2011 | | 7/1/2011 | | FAIL |
David Moser
|
|
|
CUP11-00034, CUP10-00039 & CVA10-00020-David Moser; Failed, the appeal period for CUP11-00034 ends on 7-5-11.
|
Routing - PLUMBING | 6/28/2011 | | 6/30/2011 | | PASS |
Bill VanDegrift
|
|
|
Per plans and 2003 UPC
|
Routing Off Site - STRUCTURAL | 6/15/2011 | | 6/29/2011 | | FAIL |
Carl Westfall
|
|
|
The Consultant Structural Engineer's review was received on June 28. E-mail with attached plan review was sent to Brian Bennion on June 29.
|
Routing - Erosion and Sediment | 6/27/2011 | | 6/28/2011 | | PASS |
Steven Webb
|
|
|
Plan passed at 9/10/2010
|
Routing - PUBLIC WORKS | 6/15/2011 | | 6/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 6/17/2011 | | 6/24/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 6/17/2011 | | 6/17/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 6/14/2011 | 6/17/2011 | 6/16/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 3/1/2011 | | 6/15/2011 | | FAIL |
Carl Westfall
|
|
|
A complete new application, including plans, was submitted. This was required because of the extensive changes from the scope of work shown in the September 1, 2010 submission. This project will be reviewed as though it has never been reviewed before. The regulations in effect on September 1, 2010 still apply. Routing of new drawings started.
|
Plan resubmittals received | | | 6/13/2011 | | DONE |
|
|
|
NOTE TO ALL REVIEWING AGENCIES - IN SOME REGARDS, THIS PROJECT HAS CHANGED EXTENSIVELY FROM THE ORIGINAL SUBMITTAL THAT CAME IN ON SEPTEMBER 1, 2010. IT IS RECOMMENDED THAT EVERYONE REVIEW IT AS THOUGH THEY HAVE NEVER SEEN IT BEFORE. THE REGULATIONS IN FORCE ON SEPTEMBER 1, 2010 STILL APPLY. IF YOU WANT TO SEE THE OFFICE COPY OF THE ORIGINAL SUBMISSION, CARL WESTFALL HAS IT AT HIS DESK.
|
Extend Review Timeline | | | 4/27/2011 | | DONE |
Rita DeYoung
|
|
|
|
Routing - FIRE | 2/24/2011 | | 3/1/2011 | | FAIL |
Tim Frost
|
|
|
The resubmittal item has not been addressed by the architect. Emailed updated review comments to architect.
|
Plan Reviewer's activity | | | 2/25/2011 | | DONE |
|
|
|
Sent E-mail to the architect with attached 2nd structural review.
|
Routing - PLUMBING | 2/22/2011 | | 2/24/2011 | | FAIL |
Bill VanDegrift
|
|
|
resent original corrections. resubmitted plumbing plans were fixture relocations not addressing corrections.
|
Routing Off Site - STRUCTURAL | 2/17/2011 | | 2/23/2011 | | FAIL |
Carl Westfall
|
|
|
2nd structural review completed. Response required for items not resolved.
|
Routing - PLAN CHECK | 11/4/2010 | | 2/22/2011 | | FAIL |
Carl Westfall
|
|
|
The IBC 2nd review started on Feb. 17 and was finished on Feb. 22. Revisions to the drawings were required. E-mailed the Architect with a list.
|
Telephone call | | | 2/17/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 2/1/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of resubmittal cover letter, Carlisle's Sure Seal-Code Approval Guide, Kohler-Freewill-Barrier Free ADA Shower Module Cut Sheet, ICC-ES Eval reports, Specific Section 224723 Drinking Water Cooling System and Plan Review Structural Calcs. Also received three copies of plans G101, G102, L100, L300, L302, L303, L104, L105, A002, A101, A102, A111, A401, A501, A601, A701, A702, A803, A902, A903, S002, S101, S201, S203, S301, S302, S303, S304, PL101, PL401, M002, MH100, MH101, MH101A, MH102, E005, EL101, EL102, EL103 & EL104. Taken to Carl Westfall for review.
|
Routing - PUBLIC WORKS | 11/3/2010 | | 11/4/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 11/3/2010 | | 11/3/2010 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 11/3/2010 | | DONE |
Tisha Gallop
|
|
|
received transmittal, one O & M manual and three copies of plans sheet SD-1, SD-2, SD-4, five copies of SD-3; inserted by rep. and taken back to Brian Murphy
|
Routing - FIRE | 10/8/2010 | 10/6/2010 | 10/18/2010 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Routing - PLAN CHECK | 9/16/2010 | | 10/18/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on September 20, 2010 and was completed on October 18, 2010. Revised drawings were required. Not including the structural review by the Consultant Structural Engineer, almost 70 hours were spent on the 1st IBC plan review.
|
1st review completed | | | 10/18/2010 | | FAIL |
|
|
|
Failed Public Works, Plumbing, Fire, Plan Review.
|
Routing - PLAN CHECK | 10/18/2010 | | 10/18/2010 | | |
Carl Westfall
|
|
|
The site copy was routed to Fire on October 6, 2010 hoping that Fire could start their review while the IBC plan review continued. Office copy was kept in Plan Review and the IBC plan review continued. The site copy returned from Fire on October 18, 2010, the same day that the IBC plan review was completed.
|
Route to Impact Fee Review | 10/6/2010 | 10/11/2010 | 10/7/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals received | | | 9/16/2010 | | |
Carl Westfall
|
|
|
rec'd one copy of O & M and four copies of sheet SD-3
|
Routing - PLANNING | 9/16/2010 | | 9/16/2010 | | PASS |
David Moser
|
|
|
Approved as redlined, the trash enclosure shall be a min depth of 12 feet to comply with solid waste standards
|
Routing - PLUMBING | 9/10/2010 | | 9/16/2010 | | FAIL |
Bill VanDegrift
|
|
|
(1) shutoff valves are required upstream of all backflow preventers. (2) protect all traps with vents. (3) HX 6 will need to be a double wall with leak detection heat exchanger. (4) pipe drain and overflow from cooling towers to the floor sink in the chiller room. (5) protect all fixtures below the next upstream manhole with a back water valve, storm and sewer systems. Address items 3,4 and 5 and resubmit.
|
Routing Off Site - STRUCTURAL | 9/1/2010 | | 9/15/2010 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required.
|
Routing - Erosion and Sediment | 9/10/2010 | | 9/10/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00670
|
Routing - PUBLIC WORKS | 9/3/2010 | | 9/10/2010 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy contact at ###-####
|
Routing PW Solid Waste | 9/9/2010 | | 9/9/2010 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Rating | 9/9/2010 | | 9/9/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 9/3/2010 | | 9/8/2010 | | FAIL |
Brian Murphy
|
|
|
NEED TO ADDRESS SHORT CIRCUITING
|
Routing - Addressing | 9/3/2010 | | 9/3/2010 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 9/1/2010 | | 9/3/2010 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 9/1/2010 | 9/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 9/1/2010 | | PASS |
John Menard
|
|
|
|
Telephone call | | | 9/1/2010 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|