Case Summary (BLD) | | | 10/13/2011 | | DONE |
|
|
|
|
BLD-Final | 9/23/2010 | 9/23/2010 | 9/23/2010 | P | PASS |
Dave Hannah
|
|
|
vicki Phone #: ###-####
|
FIRE-Final Inspection | 9/21/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Forrest France
|
|
|
Corrections field verified, fire life safety passed.
|
Permanent Occupancy | | | 9/23/2010 | | DONE |
|
|
|
|
FIRE-Conference | 9/22/2010 | 9/22/2010 | 9/22/2010 | P | DONE |
Forrest France
|
|
|
Project related fire alarm work for the AES panel has been finaled.
|
Routing Walk-In (BLD) | 9/17/2010 | 9/17/2010 | 9/17/2010 | P | PASS |
Perry Paine
|
|
|
|
FIRE-Final Inspection | 9/14/2010 | 9/16/2010 | 9/16/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide passing final inspection for the building related fire alarm permit for the installation of th AES panel. Remove the thumbturn deadbolt from the main exit. Keyed is ok. Meet with Perry for the revised floor plan.
|
Issue PAID IN FULL permit | | | 9/14/2010 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 9/9/2010 | 9/9/2010 | 9/13/2010 | | PASS |
Perry Paine
|
|
|
9/13/2010 11:00:30 PEP - activity updated through activity BLDA022 from case BLD10-02147.
|
Routing - PLAN CHECK | 9/9/2010 | | 9/13/2010 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 9/13/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/13/2010 | | |
|
|
|
|
Print Occupancy Form | | | 9/13/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/13/2010 | | DONE |
|
|
|
|
Telephone call | | | 9/13/2010 | | DONE |
|
|
|
9-13-10 called Vicki Stevenson permit ready for pick up ///dld
|
Application received | | 9/9/2010 | | | |
|
|
|
|