Permit Information
Permit NumberBLD10-02149
StatusFinaled
Name RAYMES INC
Site Address 3110 N CRESCENT DR Unit: 100
Project NamePARKVIEW CONDOS
Customer Number 
ePlanReviewNo
Description
(PARKVIEW CONDOS - OFFICE/CLUBHOUSE) ***6/8/2011 PLAN MODIFICATION TO MODIFY STAIR CONSTRUCTION FOR OPEN RISERS PER IBC SECTION 1009.4.5. SRZ*** Significant remodel to an existing 1,193 sq. ft. office/clubhouse building in condominium development per approved plans. Demolition work to include: removal of non-load bearing partition walls, roof and roof framing, plumbing, exterior siding and interior finishes. New construction work to include: new exterior stairs, handrails, guards, landings; new roof and roof framing; new fully accessible restrooms; new non-load bearing interior wall partitions; new accessible ramp, handrail, landings; related interior finishes in compliance with chapter 8 of the 2006 IBC; electrical, mechanical, and plumbing work; and all other work per the approved plans, attached plan review report, and all other reviewing agencies approvals. This building is NOT fire sprinklered. Planning approval done under DRH10-00182. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/1/20127/18/2012 DONE
e-mailed to Pat from Raymes inc per his request.
Third Notice 10/14/201111/7/2011 DONE
faxed
Third Notice 9/14/20119/29/2011 DONE
faxed to GC
Third Notice 8/16/20118/30/2011 DONE
faxed to Raymes Inc
Second Notice 8/4/20118/11/2011 DONE
First Notice 7/11/20117/25/2011 DONE
FIRE-Final Inspection7/1/20117/1/20117/1/2011PPASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  7/1/2011 DONE
DetailsBarbara Stitt
BLD-Final6/29/20116/30/20116/30/2011APASS
DetailsTom Arcoraci
Call before arrival please--Cathy Phone #: ###-####
CHANGE STATUS TO (ISS)  6/13/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  6/13/2011 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)5/27/20115/27/20116/9/2011 PASS
DetailsSam Zahorka
Plan modification
Routing - PLAN CHECK6/8/2011 6/9/2011 PASS
DetailsSam Zahorka
Case Summary (BLD)  6/9/2011 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/9/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  6/9/2011 DONE
Override - Parcel Holds  6/9/2011  
Permit Ready to Issue  6/9/2011 DONE
DetailsTisha Gallop
Telephone call  6/9/2011 DONE
DetailsTisha Gallop
called Cathy Sewell and left vm plan mod is ready and fees.
Routing - PLAN CHECK5/27/2011 6/8/2011 PEND
DetailsSam Zahorka
Pending Statement of Special Inspection.
Telephone call  6/8/2011 DONE
DetailsSam Zahorka
Left message w/ Cathy Sewell the Architect to call me back concerning the Statement of Special Inspections needed prior to Plan Modification issuance. Also sent an email.
Plan Modification Accepted  5/27/2011 DONE
DetailsChristina Prado
received Plan Modification for BLD10-02149. Modification to stair construction to provide open risers. Shown on plan sheet S201. Plans routed to Sam Zahorka for review.
Plan Reviewer's activity  5/23/2011 DONE
DetailsSam Zahorka
Spoke with the structural inspector and the architect of record. Stair risers were built as open risers rather than closed risers per the approved plans. Plan modification required to show code compliant open risers. Called and left message with the architect.
BLD-Final5/12/20115/13/20115/13/2011PPART
DetailsTom Arcoraci
Renee Phone #: ###-#### cn issued stairs and signs
FIRE-Final Inspection5/12/20115/13/20115/13/2011APART
DetailsTroy Cobbley
A temporary occupancy was given until the work is complete as per the city approved documents. A fire extinguisher is to be mounted at the lower level.
Zoning Approval5/12/20115/12/20115/12/2011 PASS
DetailsAndrea Tuning
FIRE-Final Inspection5/10/20115/10/20115/11/2011ANR
DetailsForrest France
FIRE-Final Inspection5/5/20115/9/20115/9/2011PNR
DetailsForrest France
Incompleted correction items. Per contractor, hardware issues and a revision to the scope of work are all that remain.
FIRE-Conference5/6/20115/6/20115/6/2011PDONE
DetailsForrest France
Items discussed with contractor include certification tag for the fire extinguisher, repair directional exit sign on alternate power source, provide approved door hardware at the restrooms and the security gate from the pool enclosure, missing stamped plans on site.
BLD-Footing3/10/20113/10/20113/10/2011PPASS
DetailsTom Arcoraci
footing, stemwall,column and landing inspection for exterior stairs Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Wall cover2/17/20112/17/20112/17/2011APASS
DetailsTom Arcoraci
Inspection for second layer of drywall at lower entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Wall cover2/16/20112/16/20112/16/2011APASS
DetailsTom Arcoraci
Inspection for first layer of drywall on ceiling in lower entry which will take three layers of drywall.
will be ready around 11:00 Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Framing/Rough-in1/28/20111/28/20111/28/2011PPASS
DetailsTom Arcoraci
interior framing for wall cover and drywall installation Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Framing/Rough-in1/20/20111/20/20111/20/2011PPART
DetailsJim Sly
nailing inspection for wall sheeting added for the 2'' extension on the existing walls. Phone #: ###-#### >> Inspection requested via web by John McCarthy
Talked to John about 2hr rated breezeway......OK to install weather barrier on West wall facing parking lot.
FIRE-Conference1/7/20111/7/20111/10/2011PDONE
DetailsForrest France
On site conference with contractor regarding fire code review notes and requirements for exit signage/EM lighting.
BLD-Framing/Rough-in1/6/20111/6/20111/6/2011PPART
DetailsTom Arcoraci
Roof sheeting inspection Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Conference12/23/201012/23/201012/23/2010APASS
DetailsTom Arcoraci
inspect nailing pattern for LVL four ply beam Phone #: ###-#### >> Inspection requested via web by John McCarthy
Issue PAID IN FULL permit  11/2/2010  
Permit Ready to Issue  10/5/2010  
Telephone call  10/5/2010 DONE
10-5-10 called Cathy Sewell permit ready and fee given Also need ACHD ///DLD
Plan assigned to (SRZ)9/10/2010 10/4/2010 PASS
DetailsSam Zahorka
Routing - PLAN CHECK10/4/2010 10/4/2010 PASS
DetailsSam Zahorka
Received Engineering verifying the existing floor joists can carry increased live load due to the change of occupancy.
Plan resubmittals received  10/4/2010 DONE
DetailsSam Zahorka
Received supplemental Engineering calculations for the existing floor joists.
PLANS/APPL TAKEN TO FRONT DESK  10/4/2010 DONE
DetailsSam Zahorka
Print Occupancy Form  10/4/2010 DONE
Routing - PLAN CHECK9/30/2010 10/1/2010 PEND
DetailsSam Zahorka
Pending letter from the Engineer verifying the existing floor is adequate to carry the increased floor load due to the change of occupancy from a Residential to a Office/assembly.
1st review completed  9/30/2010 PASS
Routing - FIRE9/27/2010 9/30/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK9/16/2010 9/24/2010 FAIL
DetailsSam Zahorka
Plan review pending a call back from the architect Cathy Sewell.
9-27-10 IBC plan review pending the alternate request for building separation approval, new detail on plans for the separation, and an engineer letter stating the addition of the gyp board dead load will not cause the existing horizontal joists to fail.
Plan resubmittals received  9/24/2010 DONE
DetailsTisha Gallop
received transmittal and two copies of plan sheets G101, A201, A501, A601; taken to Sam Zahorka
Telephone call  9/20/2010 DONE
DetailsSam Zahorka
Discussed this project in detail with the Architect Cathy Sewell. We have recognized a type of construction issue and that this Tenant Improvment change of occupancy permit is connected to an existing building that is over area and height due to type of construction. Because this is a change of occupancy the applicant is required to address the issues identified. We spoke about possible solutions and I requested her to provide a letter identifying the non-compliant issue and the proposed solutions. I let her know I could then discuss the proposed solution with the Building Official and possibly approve an alternate for her project. I'm currently waiting for her response.
Routing - Erosion and Sediment9/15/2010 9/16/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC Permit conditions. ESC10-00689
Routing - Design Review9/16/2010 9/16/2010 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH10-00182
Routing - PUBLIC WORKS9/10/2010 9/15/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating9/15/2010 9/15/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing9/14/2010 9/14/2010 PASS
DetailsApril Wing
Application received 9/9/20109/10/2010 DONE
DetailsTisha Gallop
Pending Assignment by JCB9/10/2010 9/10/2010 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  9/9/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/9/2010 DONE
DetailsTisha Gallop