Permit Information
Permit NumberBLD10-02168
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 5771 N DISCOVERY WAY
Project NameM2M Communications
Customer Number 
ePlanReviewNo
Description
(M2M Communications) Permit for tenant improvements to an existing 16,720 sq. ft. building. M2M communications currently occupies 7,627 sq. ft. and expanding into the adjacent 4,475 sq. ft. space making their total occupied space 12,102 sq. ft.. The new area will be used for additional office space and will include two accessible restrooms, a break room and a small conference room. Three new offices will also be constructed in the existing tenant space. Work will include the construction of new interior non-bearing partition walls suspended ceilings, new HVAC on existing curbs with associated ducting, plumbing and electrical work. An existing overhead door will be removed at the west end of the new tenant area and will be infilled with a new store front per CZC10-00205. The exterior walls will also be furred out with steel studs on the interior surface for envelope compliance. This is a fully sprinklered building; any alterations to the existing sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by the City of Boise Fire Department. All work to be done per the approved plans. 2-1-11 FINAL CERT OF VALUE PER GC $ 151,714.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/6/20112/1/2011 DONE
Second Notice 1/30/20112/1/2011 DONE
First Notice 1/16/20111/20/2011 DONE
Permanent Occupancy  1/6/2011 DONE
DetailsChristina Prado
BLD-Final1/5/20111/5/20111/5/2011PPASS
DetailsJim Sly
Please call 1/2 hour prior upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett
OK for Perm Occ.
BLD-Final12/28/201012/28/201012/28/2010PCANC
DetailsMike Jordan
Please call 1/2 prior upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett Inspection cancelled from web by: Darren Gossett
FIRE-Final Inspection12/27/201012/28/201012/28/2010APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in12/10/201012/10/201012/10/2010PPASS
DetailsJim Sly
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### >> Inspection requested via web by Darren Gossett
FIRE-Final Inspection12/2/201012/3/201012/3/2010APART
DetailsTroy Cobbley
The new south end is ok to occupy. The new door magnets are to remain inoperative until the fire alarm contractor submits on this work and the devices are tested.
FIRE-Conference11/30/201012/1/201012/1/2010ADONE
DetailsTroy Cobbley
I let Darren know that when the new (south) area was complete with all sprinkler/life safety items taken care of I would pass life safety so that the remodeling could be started in the existing area.
BLD-Other11/2/201011/3/201011/3/2010ACANC
DetailsJim Sly
Please call 1/2 hour upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett
Ceiling grid OK
BLD-Energy code compliance10/12/201010/12/201010/12/2010PPASS
DetailsJim Sly
darrin Phone #: ###-####
BLD-Framing/Rough-in10/11/201010/12/201010/12/2010APASS
DetailsJim Sly
darren Phone #: ###-####
Print Occupancy Form  10/4/2010  
Permit Ready to Issue  10/4/2010 DONE
Telephone call  10/4/2010 DONE
10-4-10 called Connie St George left message permit ready and fee given ///dld
Issue PAID IN FULL permit  10/4/2010 DONE
DetailsTisha Gallop
Plan assigned to (CDM)9/15/20109/15/201010/2/2010 PASS
DetailsCarl D Madsen
Case Summary (BLD)  10/2/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/2/2010  
Intake Approval  10/2/2010 PASS
Routing - PLANNING10/1/2010 10/1/2010 PASS
DetailsJosh Wilson
OK per CZC10-00205
Meeting  9/30/2010  
Sent an E-Mail to Jerrod indicating the plan sheets needed to be stamped by the engineer. CDM 9-30-10
Routing - FIRE  9/27/2010 PASS
Verify in field CDM
Routing - PLANNING9/27/2010 9/27/2010 FAIL
DetailsCarl D Madsen
Requires a zoning certificate for exterior alterations. Removing a roll up door and replacing it with store front. CDM
1st review completed  9/27/2010 FAIL
See planning note
Routing - PLAN CHECK9/15/2010 9/27/2010 PASS
DetailsCarl D Madsen
Routing - PUBLIC WORKS9/14/2010 9/15/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating9/15/2010 9/15/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing9/13/2010 9/14/2010 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  9/13/2010 DONE
Application received 9/10/2010