Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02180
StatusFinaled
Name EAGLE MATERIAL HANDLING LLC
Site Address 865 W AMITY RD
Project NameMBT
Customer Number 
ePlanReviewNo
Description
(MBT - RACKING) To install steel storage racks for high-piled storage in accordance with structural engineering design and the RMI standard in an existing warehouse tenant space per approved plans and Engineering. Tenant permit done under BLD09-02238. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. A Letter of Completion is to be issued when done. NOTE: This building is fully fire sprinklered, any alterations or modifications to the sprinkler system shall be per NFPA 13 as regulated by the fire department. EACH RACKING SYSTEM SHALL HAVE A PLAQUE LOCATED AT EACH RACKING SYSTEM STATING THE MAXIMUM WEIGHT TO BE STORED ON THAT PERTICULAR RACKING SYSTEM PER THE ENGINEERS CRITERIA STATED ON THE PLANS FOR EACH RACKING SYSTEM. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/20/20111/20/2011 DONE
First Notice12/30/201012/30/20101/10/2011 DONE
DetailsJim Storey
BLD-Final12/29/201012/30/201012/30/2010PPASS
DetailsJim Storey
Cole Phone #: ###-#### isued l/c
DOC - Permit Finaled12/30/201012/30/201012/30/2010PPASS
DetailsJim Storey
FIRE-Final Inspection12/29/201012/30/201012/30/2010APASS
DetailsForrest France
Fire life safety inspection passed. Tenant to post signage at the racks regarding engineered load capacity per design and review note comments prior to structural final inspection.
Issue PAID IN FULL permit  11/23/2010 DONE
DetailsTisha Gallop
Additional plans submitted  11/22/2010 DONE
DetailsScott Arellano
Recieved, via Email, required Smoke and Heat Vent & HPS floor plan with S/H product information from Randy Jordan or BMI Properties.
Routing - FIRE11/22/2010 11/22/2010 PASS
DetailsScott Arellano
Attached Updated IFC comments to plans.
Routing - PLAN CHECK11/22/2010 11/22/2010 PASS
DetailsSam Zahorka
Case Summary (BLD)  11/22/2010 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  11/22/2010 DONE
DetailsSam Zahorka
Inspection Record Card- Bld  11/22/2010 DONE
Permit Ready to Issue  11/22/2010 DONE
DetailsTisha Gallop
Telephone call  11/22/2010 DONE
DetailsTisha Gallop
called and told Curt/Eagle Material Handling that permit is ready and fees.
Plan assigned to (SRZ)9/14/2010 11/22/2010 PASS
DetailsSam Zahorka
Failed Fire Review on 9-20-20, waiting for Fire to pass prior to issuance.
Telephone call  11/8/2010 DONE
DetailsSam Zahorka
Recieved telephone call from Cole Seely the applicant. emailed the Fire plan review report to him and gave him Scott Arellano's telephone number. Requested a floor plan showing the smoke and heat vent locations. Let him know they need to be operational prior to permit issuance per the fire department. SRZ
Telephone call  11/5/2010 DONE
DetailsSam Zahorka
Spoke with Brent Dearmond on 11-5-10 and requested floor plan with the smoke and heat vent locations. Plan review is waiting for this information. SRZ
Routing - FIRE10/20/2010 10/22/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to design professional, applicant and owner. Telephoned applicant and registered design professional (RDP) regarding remaining item to be addressed with racking plan.
Telephone call  10/22/2010 DONE
DetailsScott Arellano
Left message with Ben Riehl (RDP) regarding verification of required building smoke and heat vents in the proposed high piled storage area. This specific plan resbumittal item has not been addressed; and the submitted plan cannot be approved until smoke and heat vents in this building are verified.
Telephone call  10/22/2010 DONE
DetailsScott Arellano
Spoke with applicant Brent DeArmond (EMH) regarding verification of required building smoke and heat vents in the proposed high piled storage area. Informed Brent of the required building smoke and heat venting; and that the resubmitted plan cannot be approved until smoke and heat vents in this building are verified.
Telephone call  10/22/2010 DONE
DetailsScott Arellano
Contacted Captain Ray Criner with Boise Fire Department, Fire Prevention Division and requested a site visit to 865 West Amity to field verify existing building smoke and heat ventiliation in the proposed high piled storage area. Ray said he could perform this task on Monday 10/25/10.
Plan resubmittals received  10/20/2010 DONE
DetailsTisha Gallop
received Fire Sprinkler Analysis (1 pg.); taken to Sam Zahorka.
Routing - PLAN CHECK9/20/2010 9/21/2010 FAIL
DetailsSam Zahorka
Permit issuance pending Fire review to pass.
11-5-10 High piled storage identified by Fire. Existing smoke and heat vents have been identified in the existing building. Floor plan showing existing smoke and heat vent locations requested from applicant by plan review. Once this information is submitted to plan review the fire inspector will verify smoke and heat vents are operational and the permit for racking will be issued. Spoke with Brent Dearmond on 11-5-10 and requested floor plan with the smoke and heat vent locations. Plan review is waiting for this information. SRZ
Routing - FIRE9/16/2010 9/20/2010 FAIL
DetailsScott Arellano
Faxed resubmittal items to registered design professional.
1st review completed  9/20/2010 FAIL
Failed Fire
Case Summary (BLD)  9/16/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK9/14/2010 9/16/2010 PEND
DetailsSam Zahorka
Pending Anchor information and Fire to Review.
Application received 9/13/20109/14/2010 DONE
DetailsTisha Gallop
Pending Assignment by JCB9/14/2010 9/14/2010 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  9/13/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/13/2010 DONE
DetailsTisha Gallop