Third Follow up | | | 1/5/2012 | | DONE |
Tisha Gallop
|
|
|
put hold on Idaho Lifestyle Builders until receive final cert of value for Bld10-02263 & Bld10-02661.
|
Third Notice | | 11/27/2011 | 12/7/2011 | | DONE |
|
|
|
mailed to Ryan Colson
|
Third Notice | | 10/14/2011 | 11/7/2011 | | DONE |
|
|
|
mailed to GC
|
Third Notice | | 8/30/2011 | 9/29/2011 | | DONE |
|
|
|
mailed to GC
|
Second Notice | | 8/12/2011 | 8/25/2011 | | DONE |
|
|
|
|
First Notice | | 7/25/2011 | 8/2/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/15/2011 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 7/12/2011 | 7/13/2011 | 7/13/2011 | P | NR |
Mike Jordan
|
|
|
Ryan Phone #: ###-####
|
FIRE-Final Inspection | 7/12/2011 | 7/13/2011 | 7/13/2011 | A | FAIL |
Troy Cobbley
|
|
|
Plans do not indicate the mechanical/storage basement. Provide verification from the plan reviewer. Remove the dead bolts form the main exit door as required per IFC 1008.1.8.4. Provide indicator at the keyed hardware at the main exit as required per IFC 1008.1.8.3 (2.1). Provide sticker at the main exit as required per IFC 1008.1.8.3 (2.2).
|
Zoning Approval | 7/11/2011 | 7/11/2011 | 7/11/2011 | | DONE |
Andrea Tuning
|
|
|
|
Print Occupancy Form | | | 7/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Aging Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 | | PASS |
Mike Jordan
|
|
|
Work is in progress and almost completed.
|
BLD-Framing/Rough-in | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Mike Jordan
|
|
|
call when on way//Ryan Phone #: ###-####
|
BLD-Energy code compliance | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Mike Jordan
|
|
|
call when on way//Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/14/2011 | 2/14/2011 | 2/14/2011 | P | PART |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. ok to insulate. Work almost completed on install of remaining straps.
|
BLD-Framing/Rough-in | 2/11/2011 | 2/14/2011 | 2/14/2011 | A | PART |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Needs to provide truss engineering and straps for beams. All pother issues have been resolved. Will recall another framing inspection when ready.
|
BLD-Framing/Rough-in | 2/11/2011 | 2/11/2011 | 2/14/2011 | P | FAIL |
Mike Jordan
|
|
|
late pm please//Ryan Phone #: ###-####. Electrical rough in failed. Needs to complete airseal pack, add additional fasterners at shear walls, noted single top, needs to add galvanized connectors at intersections and wall corners as well as provide additional studs.
|
BLD-Aging Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | | PASS |
Mike Jordan
|
|
|
Notexd that work is in progress, framing stage.
|
BLD-Foundation | 11/30/2010 | 12/3/2010 | 12/3/2010 | A | PASS |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|
BLD-Footing | 11/29/2010 | 11/30/2010 | 11/30/2010 | A | PASS |
Mike Jordan
|
|
|
nate - first thing in the morning if possible please Phone #: ###-####
|
Plan assigned to (SRZ) | 10/11/2010 | | 11/19/2010 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 11/19/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2010 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 11/19/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2010 | | DONE |
|
|
|
|
Telephone call | | | 11/19/2010 | | DONE |
Tisha Gallop
|
|
|
called Ryan Colson ###-#### and told him permit is ready and fees, and need ACHD
|
Issue PAID IN FULL permit | | | 11/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 11/16/2010 | | 11/18/2010 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - PLUMBING | 11/16/2010 | | 11/16/2010 | | PASS |
Bill VanDegrift
|
|
|
install a floor sink at the R.P. location.
|
Routing - Erosion and Sediment | 11/15/2010 | | 11/15/2010 | | PASS |
Clint A Smith
|
|
|
Use the same ESC permit for both T.I.'s
|
Case Summary (BLD) | | | 11/12/2010 | | |
|
|
|
|
Routing - PLAN CHECK | 11/3/2010 | | 11/10/2010 | | PEND |
Sam Zahorka
|
|
|
Plan corrections recieved. Corrections effect all departments. Started routing process again.
|
Routing - PUBLIC WORKS | 11/10/2010 | | 11/10/2010 | | PASS |
Beverly Mountain
|
|
|
**RESUBMITTALS SPLIT BUILDING INTO TWO T.I.'S WITH ADDITIONAL FIXTURES - RE-ROUTE TO ALL DEPARTMENTS.**
|
Routing - Addressing | 11/10/2010 | | 11/10/2010 | | PASS |
Terry Records
|
|
|
Correct Address is 1122 S. Five Mile, not 1120
|
Routing PW Sewer Rating | 11/10/2010 | | 11/10/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 11/9/2010 | | DONE |
Tisha Gallop
|
|
|
received application for Bld10-02661, revised application and cert of value for this project, two copies of response, envelope compliance, and plan sheets 6.0, 8.0, 9.0, 11.0, 12.0, 14.0; taken to Sam Zahorka.
|
1st review completed | | | 11/3/2010 | | DONE |
|
|
|
Failed - Plan Check and Plumbing
|
Routing - FIRE | 10/28/2010 | | 11/3/2010 | | PASS |
Tim Frost
|
|
|
Per comments in review and red lined drawings
|
Route to Impact Fee Review | 10/26/2010 | 10/29/2010 | 11/1/2010 | | PASS |
Cindy M. Gould
|
|
|
No walls on addition of covered entry, therefore no impact fees applied.
|
Telephone call | | | 10/28/2010 | | DONE |
Sam Zahorka
|
|
|
Spoke with Ryan Colson about contacting ACHD about his partial occupancy change. Gave him ACHD telephone number and requested he bring in a leeter from them.
|
Meeting | | | 10/27/2010 | | DONE |
Sam Zahorka
|
|
|
Meeting scheduled with the applicant and the Design proffessional Shawn Reeder to discuss the needed corrections per the plan review report.
10-28-10 Meeting with the applicant Ryan Colson and Shawn Reeder. Went over plan review corrections item by item and discussed possible solutions. Waiting for correction re-submittals.
|
Case Summary (BLD) | | | 10/26/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/15/2010 | | 10/26/2010 | | FAIL |
Sam Zahorka
|
|
|
|
Telephone call | | | 10/20/2010 | | DONE |
Sam Zahorka
|
|
|
Ryan Colson the contractor called and requested a time frame. I let Ryan know that I just recieved his plans and have not started a review yet. I let him know it could take up to 20 working days for all departments to complete their 1st review. I informed him about the routing process and let him know the plans did fail in Plumbing Review. SRZ
|
Routing - PLUMBING | 10/13/2010 | | 10/15/2010 | | FAIL |
Bill VanDegrift
|
|
|
Contact Troy James to review nail salon mechanical system after Plumbing review pedicure stations are a high hazard fixture and require a R.P. on the hot and cold supply installed over an approved drain. dcva will be required on the main water service, verify thermol expansion protection. show location and drainage for the R.P.s.
|
Routing - PLANNING | 10/15/2010 | | 10/15/2010 | | PASS |
David Moser
|
|
|
David Moser - OK for CUP10-00047 - Routed to Andra Tuning for DR (DRH10-00149)
|
Routing - Design Review | | | 10/15/2010 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH10-00149
|
Routing - MECHANICAL | | | 10/14/2010 | | PASS |
Troy James
|
|
|
Troy James - Nail Salon
|
Routing - Erosion and Sediment | 10/12/2010 | | 10/13/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC Permit Conditions. ESC10-00788
|
Routing PW Sewer Rating | 10/12/2010 | | 10/12/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/11/2010 | | 10/12/2010 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 10/11/2010 | | 10/11/2010 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 10/11/2010 | | DONE |
Jason Blais
|
|
|
Sent applicant email regarding ACHD written verification needed to be provided to our Permit Counter prior to the building permit being issued.
|
Intake Approval | | | 10/8/2010 | | PASS |
John Menard
|
|
|
|
Intake Approval | | | 9/21/2010 | | FAIL |
John Menard
|
|
|
|
Application received | | 9/21/2010 | | | |
|
|
|
|