Telephone call | | | 4/26/2018 | | DONE |
|
|
|
emailed Jennifer the c of o
|
Third Notice | | 9/29/2011 | 9/20/2011 | | DONE |
|
|
|
|
Third Notice | | 8/30/2011 | 9/15/2011 | | DONE |
|
|
|
mailed and faxed to owner
|
Second Notice | | 8/12/2011 | 8/25/2011 | | DONE |
Christina Prado
|
|
|
Mailed 8-25-11
|
First Notice | | 7/18/2011 | 8/2/2011 | | DONE |
|
|
|
Please send final value requests to owner John Kalange at the parcel owner address per his request.
|
BLD-Final | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | PASS |
Jim Storey
|
|
|
JOHN Phone #: ###-####
|
BLD-Conference | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | CANC |
Tony Young
|
|
|
As late as possible Phone #: 8676942 >> Inspection requested via mobile web by John Kalange Inspection cancelled via moblie web on Friday, July 08, 2011.
|
Permanent Occupancy | | | 7/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Aging Inspection | 6/27/2011 | 6/27/2011 | 6/30/2011 | | PEND |
Tony Young
|
|
|
|
Temporary Occupancy | 6/17/2011 | 9/15/2011 | 6/17/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/27/2011 | 4/27/2011 | 4/27/2011 | A | PART |
Jim Storey
|
|
|
final ok for bld pending achd sign off card on site signed for temp occ.
|
BLD-Conference | 4/26/2011 | 4/27/2011 | 4/27/2011 | A | PASS |
Jim Storey
|
|
|
JOHN Phone #: ###-#### PLEASE CALL 30 MIN BEFORE GOING OUT
|
FIRE-Final Inspection | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | PASS |
Forrest France
|
|
|
Field verified correction items are done. Inspection passed.
|
FIRE-Conference | 4/22/2011 | 4/22/2011 | 4/22/2011 | A | DONE |
Forrest France
|
|
|
Regarding C/N items.
|
Zoning Approval | 4/22/2011 | 4/22/2011 | 4/22/2011 | | PASS |
Andrea Tuning
|
|
|
The hand rails still need to be attached to the ADA ramp but this will be inspected by the Building Division.
|
FIRE-Final Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | FAIL |
Forrest France
|
|
|
Items for final include relocate fire extinguisher along a normal path of travel in compliance with fire code review notes, provide approved hardware at the south exit/remove deadbolt, handrails are not yet installed.
|
BLD-Other | 3/29/2011 | 3/29/2011 | 3/29/2011 | P | PART |
Tony Young
|
|
|
Rebar on Handicap ramp-- Butch Phone #: ###-####
|
BLD-Framing/Rough-in | 2/7/2011 | 2/7/2011 | 2/8/2011 | P | PART |
Tony Young
|
|
|
John please call before going out Phone #: ###-####
|
BLD-Energy code compliance | 2/7/2011 | 2/8/2011 | 2/8/2011 | A | PASS |
Tony Young
|
|
|
John please call before going out Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2011 | 2/3/2011 | 2/3/2011 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####,,,inspection of the interior of house frame only,, need some fireblocks,,, support stairs,,, NOTE,, doorway to basement will be closed later,, but but prior to final,, will make it a closet... ok to insulate,, ramp will be later
|
BLD-Framing/Rough-in | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####,, on site conf. only,, need trades 1st
|
Issue PAID IN FULL permit | | | 12/16/2010 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 12/15/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/15/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 12/15/2010 | | DONE |
Tisha Gallop
|
|
|
called Richard George and left vm permit is ready and fees.
|
Routing - PLAN CHECK | 12/10/2010 | | 12/14/2010 | | PASS |
Carl Westfall
|
|
|
Approved the drawings, with "red lines", after the Architect came in and modified the drawings.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/12/2010 | | 12/14/2010 | | PASS |
Carl Westfall
|
|
|
1st review done
|
Routing - PLAN CHECK | 12/1/2010 | | 12/10/2010 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd plan review. One item not resolved. An E-mail was sent to the Architect and to the Tenant.
|
Plan resubmittals received | | | 12/8/2010 | | DONE |
Christina Prado
|
|
|
Recieved 2 copies of sheet 1, 1a, 2 and 3 and taken to Carl W
|
Routing - PLAN CHECK | 11/17/2010 | | 12/1/2010 | | |
|
|
|
Inserted plumbing drawings and routed drawings back to Plumbing.
|
Routing - PLUMBING | 12/1/2010 | | 12/1/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Plan resubmittals received | | | 11/30/2010 | | |
Barbara Stitt
|
|
|
Received 2 copies of sheet 5 and taken to Carl Westfall on 11-30-10 @ 1:10 pm
|
Routing - FIRE | 11/10/2010 | 11/10/2010 | 11/17/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 11/17/2010 | | FAIL |
|
|
|
Failed Plumbing, Plan Check
|
Route to Impact Fee Review | 11/10/2010 | 11/16/2010 | 11/10/2010 | | PASS |
Cindy M. Gould
|
|
|
Fire and Police charges for square footage of new commerical area is less than residential. I am not charging additional.
|
Routing - PLAN CHECK | 10/19/2001 | | 11/10/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on November 5, 2010 and finished on November 10, 2010. Revised drawings were required. See the plan review report.
|
Routing - Design Review | 10/18/2010 | | 10/19/2010 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC10-00210
|
Routing - PLUMBING | 10/14/2010 | | 10/18/2010 | | FAIL |
Bill VanDegrift
|
|
|
Plumbing Plan needed? provide a plumbing plan. if a level 3 gas and vacuum system is going to be installed, a plan will be required.
|
Routing - PUBLIC WORKS | 10/12/2010 | | 10/14/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 10/14/2010 | | 10/14/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC Permit conditions. ESC10-00791
|
Routing - Addressing | 10/13/2010 | | 10/13/2010 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 10/13/2010 | | 10/13/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Plan Reviewer's activity | | | 10/12/2010 | | DONE |
Jason Blais
|
|
|
Emailed architect letting him know to contact ACHD for needed submittal documents and if evaluation of impact fees is needed. Written verification from ACHD will need to be provided to our Permit Counter prior to permit issuance.
|
Application received | | | 10/12/2010 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 10/12/2010 | | PASS |
|
|
|
OK to submit
|
Plans ACCEPTED BY PLAN TECH | | | 10/12/2010 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/12/2010 | | DONE |
Barbara Stitt
|
|
|
|
Pending Assignment by JCB | 10/12/2010 | | 10/12/2010 | | DONE |
Jason Blais
|
|
|
|
Routing PW Flood Plain | | | | | PASS |
Jim Wyllie
|
|
|
Jim Wyllie - Exterior site construction in floodplain
|