Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD10-02352
StatusFinaled
Name CRYSTAL BEALE
Site Address 118 N LATAH ST
Project NamePlush Hair Lounge LLC
Customer Number 
ePlanReviewNo
Description
(PLUSH HAIR LOUNGE LLC) Permit for tenant improvememts to an existin 650 sq. ft. tenant space with work to include the installation or two hair wash sinks and the placement of temporary partitions less than 5' 7" tall. This is a hair aolon only no nails will be done in the tenant space without additional permits. The back door shall have the dead bolt removed. The front door is allowed to have keyed locking hardware with signage "This door to remain unlocked while occupied" All work to be done per the approved plans and notations. CDM 1-5-11 PER Jim Storey & Tom Arcoraci no structural work done///dld
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 11/28/201012/8/2010 DONE
Permanent Occupancy UNPAID FEE  11/18/2010 DONE
DetailsBarbara Stitt
BLD-Final11/15/201011/16/201011/16/2010PPASS
DetailsTom Arcoraci
CRYSTAL Phone #: ###-####
FIRE-Final Inspection10/13/201010/15/201010/15/2010APASS
DetailsForrest France
Fire life safety is acceptable pending door hardware per review notes. Structural inspector to verify compliance as discussed.
BLD-Final10/13/201010/15/201010/15/2010PPART
DetailsJim Storey
crystal Phone #: ###-#### temp ok/ need plm final/ sign above door
Temporary Occupancy UNPAID FEE  10/15/2010 DONE
DetailsBarbara Stitt
Print Occupancy Form  10/4/2010 DONE
Telephone call  10/4/2010 DONE
called crystal permit ready fees given
Permit Ready to Issue  10/4/2010 DONE
Issue PAID IN FULL permit  10/4/2010 DONE
DetailsTisha Gallop
Plan assigned to (CDM)9/29/20109/29/201010/2/2010 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK9/30/2010 10/2/2010 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK9/30/2010 10/2/2010 PASS
DetailsCarl D Madsen
Routing - FIRE  10/2/2010 PASS
Verify in field CDM
1st review completed  10/2/2010 DONE
Case Summary (BLD)  10/2/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/2/2010  
Intake Approval  10/2/2010 PASS
Routing - PUBLIC WORKS9/29/2010 9/30/2010 PASS
DetailsBeverly Mountain
Routing - Addressing9/30/2010 9/30/2010 PASS
DetailsTerry Records
Routing - PLUMBING9/30/2010 9/30/2010 PASS
DetailsBill VanDegrift
new waste may connect to existing at a side inlet or wye fitting on a waste branch but not on a closet arm. DCVA will be required on the service. verify thermol expansion protection.
Application received 9/29/20109/29/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  9/29/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/29/2010 DONE
DetailsTisha Gallop