Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD10-02365
StatusFinaled
Name ASIN HOMES
Site Address 3050 N LAKEHARBOR LN Unit: 126
Project NameFederal Highway Administration
Customer Number 
ePlanReviewNo
Description
(FEDERAL HIGHWAY ADMINISTRATION – The Waterfront Building – Ste # 126) Do not issue C of O until ugrade agreement is recieved and attached to permit.. Permit is to remodel an existing 4,526 square foot office space. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create a larger conference room and to remove one office to create a larger office, installation of new accessible hardware on all doors, installation of new mill work, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered for area increase, any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  9/19/2011 DONE
DetailsTim L. Woodard
Called and sent email to Jeffrey Lowden to give one month notice for when upgrade agreement was to begin or have bond posted. TLW
Second Notice 1/2/20111/6/2011 DONE
First Notice 12/13/201012/23/2010 DONE
Permanent Occupancy UNPAID FEE  12/3/2010 DONE
DetailsChristina Prado
BLD-Final11/30/201012/1/201012/1/2010PPASS
DetailsTony Young
We got all of the fire corrections complete and I have an inspection in the am. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
FIRE-Final Inspection11/30/201012/1/201012/1/2010APASS
DetailsTroy Cobbley
Life safety passed. The fire alarm system is showing multiple trouble conditions. The owner has Allied General performing repair work. I asked Mike with Allied General to call me with an update with the panel.
BLD-Final11/24/201011/26/201011/29/2010PNR
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Scott Asin
Need fire final......
FIRE-Final Inspection11/24/201011/26/201011/26/2010AFAIL
DetailsForrest France
Fire sprinkler system will require modification due to remodel work, existing system is overdue required annual certification.
Plan Reviewer's activity  11/17/2010 DONE
DetailsJason Blais
Upgrade Agreement received, approved, and recorded at Ada County Assessor's office on the parcel. Copy of Upgrade Agreement is attached to this case under documents.
Print Occupancy Form  11/5/2010 DONE
DetailsBarbara Stitt
BLD-Framing/Rough-in11/4/201011/4/201011/4/2010PPASS
DetailsMike Jordan
Our HVAC contractor doesn''t think that he needs a permit because he only added a few new grills and a new thermostat. I hope he is right. I didn''t schedule a mech. inspection. Phone #: ###-#### >> Inspection requested via web by Scott Asin
Print Occupancy Form  11/3/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  11/3/2010 DONE
Telephone call  11/3/2010  
11-3-10 called Gary Asin permit ready and fee given ///dld
Issue PAID IN FULL permit  11/3/2010 DONE
Plan assigned to (TLW)10/14/2010 11/2/2010 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK11/2/2010 11/2/2010 PASS
DetailsTim L. Woodard
Approved with upgrade agreement
PLANS/APPL TAKEN TO FRONT DESK  11/2/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  11/2/2010 DONE
DetailsTim L. Woodard
1st review completed  10/18/2010 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK10/14/2010 10/18/2010 FAIL
DetailsTim L. Woodard
Refer to Plan Review Report. Tim Woodard
Application received 9/30/201010/14/2010 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  10/14/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  10/14/2010 DONE
DetailsBarbara Stitt
Intake Approval  10/14/2010 PASS
DetailsTim L. Woodard
Agreement of Future work11/17/201010/25/2011   
DetailsTim L. Woodard
Upgrade existing restrooms by 10/25/11 or post bond and date can be extended to 10/25/13. TLW
4/5/12 A building permit to provide accessible upgrades to the restrooms is ready at the permit counter for issuance under case BLD11-02957 at the address of 3098 N. Lake Harbor Lane.