BLD-Final | 10/28/2010 | 10/28/2010 | 10/28/2010 | P | PASS |
Tony Young
|
|
|
Paul Phone #: ###-####
|
DOC - Permit Finaled | 10/28/2010 | 10/28/2010 | 10/28/2010 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 10/15/2010 | 10/18/2010 | 10/18/2010 | A | PASS |
Tony Young
|
|
|
Paul Phone #: ###-####
|
BLD-Footing | 10/7/2010 | 10/7/2010 | 10/7/2010 | P | PASS |
Tony Young
|
|
|
paul Phone #: ###-####,, post holes ok
|
PubWorks Subgrade Approval | 10/4/2010 | 10/4/2010 | 10/4/2010 | | DONE |
Terry Records
|
|
|
Grades are less than 15% and this is therefore NOT a hillside. No subgrade approval required.
|
Routing Walk-In (PW Hillside) | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PASS |
Brian Murphy
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Routing Walk-In (Zoning) | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 9/30/2010 | 9/30/2010 | 9/30/2010 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 9/30/2010 | 9/30/2010 | 9/30/2010 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 9/30/2010 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/30/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/30/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/30/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2010 | | |
|
|
|
|
Application received | | 9/30/2010 | | | |
|
|
|
|