(WELCH MUSIC - EAST END OF BUILDING) Parcel owner is GC see scanned docuemnts. This building is NOT fire sprinklered. This permit is being done in conjunction with permit BLD10-02386 utilizing the same set of plans. The shell of this building was constructed under BLD05-01395. To construct a 4,879 square foot assembly and retail sales tenant space within an existing building shell. Work is to include wall insulation, attic insulation, interior nonbearing walls, 2 restrooms accessible to the disabled, interior doors, interior windows, an exterior window to replace a set of double doors, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/17/20113/17/2011 DONE
faxed and called
Telephone call  3/17/2011 DONE
DetailsTisha Gallop
left vm at Schuerman Homes still need FV.
Third Notice 2/18/20113/3/2011 DONE
faxed
Third Notice 1/25/20112/4/2011 DONE
faxed and mailed
Telephone call  2/4/2011 DONE
DetailsTisha Gallop
Second Notice 1/20/20111/20/2011 DONE
First Notice 12/26/20101/10/2011 DONE
Permanent Occupancy  12/16/2010 DONE
DetailsBarbara Stitt
BLD-Final12/15/201012/15/201012/15/2010PPASS
DetailsJim Sly
OK for Perm Occ.
BLD-Final12/14/201012/15/201012/15/2010ACANC
DetailsJim Sly
Dave Phone #: ###-####
FIRE-Final Inspection12/14/201012/15/201012/15/2010APASS
DetailsTroy Cobbley
life safety passed
Zoning Approval12/15/201012/15/201012/15/2010 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in11/12/201011/15/201011/15/2010APASS
DetailsJim Sly
Dave Phone #: ###-####
Permit Ready to Issue  11/10/2010 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  11/10/2010 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  11/10/2010 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK11/8/2010 11/9/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  11/9/2010 DONE
Print Occupancy Form  11/9/2010 DONE
DetailsBarbara Stitt
Plan assigned to (CJW)10/5/2010 11/9/2010 PASS
DetailsCarl Westfall
1st review done
Routing - PUBLIC WORKS11/8/2010 11/8/2010  
Talked to Terry Records about the addressing. PW routing sheet confirms address.
Routing - PLAN CHECK11/5/2010 11/8/2010  
Routing - FIRE10/29/201010/29/201011/5/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  11/5/2010 FAIL
Failed Plan Check, Design Review
Plan resubmittals received  11/4/2010 DONE
DetailsTisha Gallop
received transmittal and two coipes of Architect's Supplemental Instruction and plan sheets G1, A2, A2.1, A6; taken to Carl Westfall
Route to Impact Fee Review10/29/201011/3/201011/1/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK10/12/2010 10/29/2010 FAIL
DetailsCarl Westfall
Started the IBC plan review on October 28, 2010 and completed it the next day. Revised drawings were required. See the plan review report.
Routing - Design Review10/28/2010 10/28/2010 PASS
DetailsJosh Wilson
OK per CZC10-00222
Routing - Design Review10/12/2010 10/12/2010 FAIL
DetailsSarah Schafer
Sarah Schafer - Double exterior doors being replaced with new window - adequate parking for assembly recital use
Zoning Certificate has not been submitted for the exterior changes or the change in use of the space. I have sent an e-mail to Bill Matter requesting an estimated date for submittal.
Routing - Erosion and Sediment10/11/2010 10/12/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00769.
Routing - PUBLIC WORKS10/5/2010 10/11/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating10/8/2010 10/8/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing10/7/2010 10/7/2010 PASS
DetailsTerry Records
Plan Reviewer's activity  10/5/2010 DONE
DetailsJason Blais
Emailed architect Bill Matter. Because of the minor exterior change to the building, a Zoning Certificate is required to be obtained from Planning & Zoning.

Also because of the assembly recital use shown, ACHD needs to be contacted for evaluation if any additional impact fees are due. Our Permit Counter will need written verification from ACHD prior to the permit being issued.
Pending Assignment by JCB10/4/2010 10/5/2010 DONE
DetailsJason Blais
Application received 10/4/201010/4/2010 DONE
DetailsTisha Gallop
Intake Approval  10/4/2010 PASS
DetailsSam Zahorka
Plans ACCEPTED BY PLAN TECH  10/4/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/4/2010 DONE
DetailsTisha Gallop