BLD-Final | 5/1/2012 | 5/2/2012 | 5/2/2012 | A | CANC |
Tony Young
|
|
|
Chad Phone #: ###-####
|
BLD-Final | 5/1/2012 | 5/1/2012 | 5/1/2012 | P | PASS |
Tony Young
|
|
|
Chad Phone #: ###-####,, all ok now
|
Permanent Occupancy | | | 5/1/2012 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 2/9/2012 | | DONE |
|
|
|
|
BLD-Final | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PART |
Tony Young
|
|
|
Chad Phone #: ###-####,, temp occ ok,, need to verify stair rises,, address by entry doors,, trades..
|
FIRE-Final Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed. Noted unit address numbers to be posted adjacent to respective front entry doors.
|
BLD-Conference | 8/2/2011 | 8/3/2011 | 8/3/2011 | A | PASS |
Tony Young
|
|
|
call 30 min prior//Chad Phone #: ###-####,, ?s on front steps
|
BLD-Energy code compliance | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Tony Young
|
|
|
chad Phone #: ###-####,, ok to cover
|
BLD-Energy code compliance | 7/5/2011 | 7/5/2011 | 7/5/2011 | P | PART |
Tony Young
|
|
|
chad Phone #: ###-####,, lower floor ok
|
BLD-Framing/Rough-in | 7/1/2011 | 7/5/2011 | 7/5/2011 | A | PART |
Tony Young
|
|
|
chad Phone #: ###-####,, ok to insulate,,, ok to cover exterior,, ok to sheet rock stairways,, one lower unit on east not looked at,, (occupied)
|
OVERRIDE | | | 7/1/2011 | | |
|
|
|
|
OVERRIDE | | | 7/1/2011 | | |
|
|
|
|
Plan assigned to (SRZ) | 6/23/2011 | 6/23/2011 | 7/1/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 6/30/2011 | | 7/1/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2011 | | DONE |
Sam Zahorka
|
|
|
|
Permit Ready to Issue | | | 7/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 7/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | | | 6/30/2011 | | FAIL |
Sam Zahorka
|
|
|
Corrections needed.
|
Plan Reviewer's activity | | | 6/29/2011 | | DONE |
Sam Zahorka
|
|
|
Visited site with the building inspector Tony Young. Identified work exceeding the scope of the repair permit. Required plan modification drawings for all new alterations. Exit stairs are fully enclosed and require extensive corrections, ect..
|
Plan Modification Accepted | | | 6/23/2011 | | |
|
|
|
Plan modification accepted for bld10-02409 to enclose porches and strengthen floor joists in some areas.pages- 5,6,7
|
Routing Walk-In (BLD) | 6/21/2011 | 6/21/2011 | 6/21/2011 | P | PASS |
Perry Paine
|
|
|
need separate permit for the retaining walls
|
BLD-Conference | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PART |
Tony Young
|
|
|
dewayne Phone #: ###-####,, conf on frame and stairs
|
BLD-Conference | 5/23/2011 | 5/23/2011 | 5/26/2011 | P | PART |
Tony Young
|
|
|
will add to scope of premit
|
BLD-Conference | 3/31/2011 | 3/31/2011 | 4/4/2011 | P | PART |
Tony Young
|
|
|
chad Phone #: ###-#### patio ?s
|
BLD-Aging Inspection | 3/16/2011 | 3/16/2011 | 3/24/2011 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/14/2011 | 1/14/2011 | 1/21/2011 | | PEND |
Tony Young
|
|
|
|
Case Summary (BLD) | | | 11/5/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/12/2010 | | DONE |
|
|
|
|
Telephone call | | | 10/12/2010 | | DONE |
Tisha Gallop
|
|
|
called Reese and told him permit is ready, fees, and need cert of value with plm & ele values.
|
Permit Ready to Issue | | | 10/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 10/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (SRZ) | 10/6/2010 | 10/6/2010 | 10/11/2010 | | PASS |
Sam Zahorka
|
|
|
|
Routing - FIRE | 10/8/2010 | | 10/11/2010 | | PASS |
Scott Arellano
|
|
|
Previous permit BLD09-01896 expired. This is a new permit for the same work as previously approved.
Attached IFC comments to plans from BLD09-01896.
|
Routing - Erosion and Sediment | | | 10/11/2010 | | PASS |
Steven Webb
|
|
|
Previous permit BLD09-01896 expired. This is a new permit for the same work as previously approved. Use ESC09-00676 per Steve Webb.
|
Case Summary (BLD) | | | 10/11/2010 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 10/11/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2010 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 10/8/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/8/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/6/2010 | | 10/8/2010 | | PASS |
Sam Zahorka
|
|
|
|
Application received | | 10/6/2010 | 10/6/2010 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 5/11/2012 | | | |
|
|
|
|