Permit Information
Permit NumberBLD10-02415
StatusFinaled
Name DURANGO BUILDING CO LLC
Site Address 199 N 8TH ST
Project NameBOISE CITY NATL BANK BLDG
Customer Number 
ePlanReviewNo
Description
(FORK - LUMSDEN RESTAURANTS - 1ST STORY - EAST END) The fire sprinkler system substitutes for the 1-hr fire-resistance-rating of the building structure. To remodel an existing 3,756 square foot bar for a new bar/restaurant tenant. Work is to include interior nonbearing walls, a suspended ceiling within the kitchen, a new bar counter, a new grease hood over a new rotisserie oven, millwork (including wood covers for existing floor mounted HVAC units), and finishes. A new exterior ramp accessible to the disabled will be constructed under a separate permit and is required to be completed before occupancy by this tenant. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/15/20115/20/2011 DONE
Second Notice 5/7/20115/10/2011 DONE
First Notice 4/7/20114/27/2011 DONE
Permanent Occupancy  3/28/2011 DONE
DetailsChristina Prado
Permanent Occupancy  3/28/2011 DONE
DetailsChristina Prado
BLD-Final3/24/20113/25/20113/25/2011APASS
DetailsDave Hannah
Cameron Phone #: ###-#### ok for perm occ
FIRE-Final Inspection2/14/20112/17/20112/17/2011PPASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Final2/14/20112/18/20112/17/2011APART
DetailsDave Hannah
JIM Phone #: ###-#### ok for temp occ ok for perm occ after ada ramp is finished
Temporary Occupancy2/17/20115/18/20112/17/2011 DONE
DetailsBarbara Stitt
FIRE-Conference2/7/20112/7/20112/7/2011PDONE
DetailsForrest France
Discussion with contractor regarding fire extinguisher locations, project related trade permits, finish schedule, review notes, etc.
BLD-Aging Inspection2/2/20112/2/20112/4/2011 PASS
DetailsDave Hannah
BLD-Framing/Rough-in12/2/201012/3/201012/3/2010APASS
DetailsDave Hannah
Asks for later in the morning if possible ***JIM Phone #: ###-#### ok to cover after other trades ok
Issue PAID IN FULL permit  11/22/2010 DONE
DetailsTisha Gallop
Routing - FIRE11/17/2010 11/19/2010 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK11/19/2010 11/19/2010 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  11/19/2010 DONE
Print Occupancy Form  11/19/2010 DONE
Permit Ready to Issue  11/19/2010 DONE
DetailsTisha Gallop
Telephone call  11/19/2010 DONE
DetailsTisha Gallop
called and left vm for Joe Thompson/BRS Arch. that permit is ready and fees
Plan assigned to (CJW)10/8/2010 11/19/2010 PASS
DetailsCarl Westfall
1st review done
Routing - PLAN CHECK11/9/2010 11/17/2010 PASS
DetailsCarl Westfall
Completed the IBC resubmittal review. Drawings approved. Routed back to Fire and Plumbing.
Routing - PLUMBING11/17/2010 11/17/2010 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals received  11/15/2010  
DetailsBarbara Stitt
Received 1 cover transmittal, 1 plan review response letter dated 11-10-10 from Joe Thompson, 1 plumbing response comment letter from Signature Engineering dated 11-12-10, 1 fire response letter dated 11-10-10 from Joe Thomspon, 2 copie so f sheets G1.1, A1.1, A1.2, A4.3, A4.4, A8.1, P1.0, P1.1 and taken to Carl Westfall on 11-15-10 @ 4:40pm BAS
Route to Impact Fee Review11/4/201011/9/201011/10/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE11/4/201011/4/201011/9/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  11/9/2010 FAIL
Failed Plumbing, Plan Check, Fire
Routing - PLAN CHECK10/14/2010 11/4/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on November 1, 2010 and was finished on November 4, 2010. Revised drawings were required. See the plan review report.
Routing - PLUMBING10/11/2007 10/14/2010 FAIL
DetailsBill VanDegrift
the maximum length of indirect waste piping is 15 feet. Ice bins at the bar must be piped separately to a receptor. indirect waste piping over 15 feet must be trapped and vented, the vent may not connect to any sewer connected vent. relocate floor sink at the bar. vent FS-1 in the office.
Routing - PUBLIC WORKS10/8/2010 10/11/2010 PASS
DetailsBeverly Mountain
Routing - Addressing10/11/2010 10/11/2010 PASS
DetailsTerry Records
Routing PW Sewer Rating10/11/2010 10/11/2010 PASS
DetailsConnie Baumgartner
Routing PW Environmental10/11/2010 10/11/2010 PASS
DetailsWalt Baumgartner
existing GI in place. Former Doughty's restaurant
Pending Assignment by JCB10/7/2010 10/8/2010 DONE
DetailsJason Blais
Application received 10/7/201010/7/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  10/7/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/7/2010 DONE
DetailsTisha Gallop
Intake Approval  10/7/2010 PASS
DetailsSam Zahorka