Second Notice | | 1/9/2014 | 1/23/2014 | | DONE |
|
|
|
|
First Notice | | 12/14/2013 | 12/30/2013 | | DONE |
|
|
|
mailed to Joe Genovese at Craig James Ln., Eagle address.
|
BLD-Final | 12/3/2013 | 12/4/2013 | 12/4/2013 | P | PASS |
Mike Jordan
|
|
|
joe Phone #: ###-####. Ok for perm occ.
|
Permanent Occupancy | | | 12/4/2013 | | DONE |
|
|
|
|
Zoning Approval | 12/3/2013 | 12/3/2013 | 12/3/2013 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | PART |
Jim Storey
|
|
|
joe Phone #: ###-#### temp ok pending p&z sign off// mike needs si close out letter.
|
Temporary Occupancy | 9/11/2013 | 12/10/2013 | 9/11/2013 | | DONE |
Darla L Downs
|
|
|
|
FIRE-Final Inspection | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Craig D. Hanson
|
|
|
|
Zoning Approval Temp | 9/10/2013 | 9/10/2013 | 9/10/2013 | | PASS |
Josh Wilson
|
|
|
90-day temp occ for completion of improvements
|
Plan assigned to (JCM) | 9/9/2013 | 9/9/2013 | 9/10/2013 | | PASS |
John Menard
|
|
|
|
Print Occupancy Form | | | 9/10/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/10/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/10/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/10/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/10/2013 | | 9/10/2013 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2013 | | DONE |
John Menard
|
|
|
|
PubWorks Occupancy Approval | 9/9/2013 | 9/9/2013 | 9/9/2013 | | DONE |
Tiffany Lowery
|
|
|
|
Routing - Design Review | 9/9/2013 | | 9/9/2013 | | PASS |
Josh Wilson
|
|
|
OK per DRH13-00279
|
Routing - FIRE | 9/9/2013 | | 9/9/2013 | | PASS |
Scott Arellano
|
|
|
Plan modification approved.
|
Plan Modification Accepted | | | 9/9/2013 | | DONE |
|
|
|
Plan mod to change layoff off play ground, outside modifications only - Sheets SD1.0l SD1.2; SD1.4; L1.1; C1.0; C2.0 - taken to John M
|
FIRE-Final Inspection | 9/5/2013 | 9/6/2013 | 9/6/2013 | P | FAIL |
Troy Cobbley
|
|
|
Relocate the fire extinguisher to the Storage Room as per the approved plans and provide documentation or resubmittals that show the revised fire dept access on the east side of the building.
|
PubWorks Occupancy Approval | 9/6/2013 | 9/6/2013 | 9/6/2013 | | DONE |
Jason C. Taylor
|
|
|
PW did not perform any inspections on this project. All inspection were done by and approved by the Civil Engineer. Approval letter recieved. Occuppancy is approved by PW. Jason Taylor ###-####
|
BLD-Energy code compliance | 6/10/2013 | 6/11/2013 | 6/11/2013 | A | PASS |
Mike Jordan
|
|
|
joe Phone #: ###-####
|
BLD-Energy code compliance | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PART |
Mike Jordan
|
|
|
joe Phone #: ###-####. airseal only ok.
|
BLD-Framing/Rough-in | 5/16/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Tom Arcoraci
|
|
|
call 1/2 hr prior//Paul Smith Phone #: ###-####
|
BLD-Framing/Rough-in | 4/3/2013 | 4/3/2013 | 4/3/2013 | P | PART |
Mike Jordan
|
|
|
Shear inspection please-- Phone #: ###-####. Exterior shear nailing ok. Need RFI from engineer of record deleting one MSTC strap from CMU wall to wood wall construction. Approved plan shows 2 mstc straps at each location.
|
BLD-Final | 3/29/2013 | 4/1/2013 | 4/1/2013 | A | CANC |
Mike Jordan
|
|
|
paul Phone #: ###-####
|
BLD-Conference | 4/1/2013 | 4/1/2013 | 4/1/2013 | A | PASS |
Mike Jordan
|
|
|
paul Phone #: ###-####. Received RFI paperwork from engineer of record noting the deletionof the 2nd. tension device and tghat the 21" all thread lenght being acceptable.
|
BLD-Other | 3/28/2013 | 3/28/2013 | 3/28/2013 | P | PART |
Mike Jordan
|
|
|
Roof fastening - Paul Phone #: ###-####. Lower roof nailing and diaphragm ok. Need RFI from engineer on HHDQ-S2.5 holdowns. Noted 21 inches of all thread rod before holdown device connection. Simson specs allow for 8" above surface with no reduction as long as bolt elongation has been accounted for. Enginner to review and also review the in place work for only one tension device in each location. Approved plan shows 2 devices in each location.
|
BLD-Other | 3/4/2013 | 3/5/2013 | 3/5/2013 | P | PASS |
Mike Jordan
|
|
|
roof sheathing//Joe Phone #: ###-####. Roof sheathing over gym ok. 1 1/8 ply has been substituted in lieu of 3/4 inch ply. Ledger blocking size also increased for proper bearing of roof joist. All lateral bracing on roof joist over gym ok and installed per truss engineering. MPAI130 straps used on roof sheating as well, strap size was aslo increased. Engineer of record to supply RFI for above noted changes.
|
BLD-Framing/Rough-in | 2/26/2013 | 2/27/2013 | 2/27/2013 | A | PASS |
Jim Storey
|
|
|
joe - roof framing Phone #: ###-#### 450 insp. ok
|
BLD-Conference | 2/12/2013 | 2/12/2013 | 2/12/2013 | P | DONE |
Mike Jordan
|
|
|
Stopped at jobsite to review special inspection reports and to talk with contractor about any issues or concerns he may have.
|
BLD-Final | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | DEFR |
Tom Arcoraci
|
|
|
joe late morning if possible Phone #: ###-####
|
BLD-Other | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | DEFR |
Mike Jordan
|
|
|
joe - grout Phone #: ###-####. Special inspector on site.
|
BLD-Other | 12/14/2012 | 12/17/2012 | 12/17/2012 | A | PASS |
Mike Jordan
|
|
|
block wall grouting - joe Phone #: ###-####.
|
BLD-Other | 12/11/2012 | 12/12/2012 | 12/12/2012 | A | PART |
Mike Jordan
|
|
|
joe - block wall grout Phone #: ###-####. south masonry wall, 8ft. to 12ft. elevation pending special inspetions. Contractor also working on detail for approved firestop system at expansion joints on south wall, will either be from metecaulk or hilti.
|
BLD-Other | 12/7/2012 | 12/11/2012 | 12/11/2012 | A | PART |
Mike Jordan
|
|
|
joe - grout Phone #: ###-####. 4ft. to 8ft. elevation, south wall, pending special inspection. Also noted to contractor to provide UL listing for expansion joint as the south wall is a fire rated wall. Will need access to back side. Also verified all special inspectors certifications.
|
BLD-Other | 12/4/2012 | 12/5/2012 | 12/5/2012 | A | PART |
Mike Jordan
|
|
|
masonry grout ins//Joe Phone #: ###-####. South wall, 0 to 4ft. elevation. Work in progress went over plans with masonry foreman and job super. Ok for grout placement after special inspector has passed in place work.
|
BLD-Footing | 11/6/2012 | 11/8/2012 | 11/8/2012 | P | PASS |
Jim Storey
|
|
|
footing and rebar///Joe Genovese Phone #: ###-#### interior ft rebar ok
|
BLD-Foundation | 9/14/2012 | 9/17/2012 | 9/17/2012 | A | CANC |
Mike Jordan
|
|
|
joe Phone #: ###-####
|
BLD-Energy code compliance | 9/17/2012 | 9/17/2012 | 9/17/2012 | A | PASS |
Mike Jordan
|
|
|
joe Phone #: ###-####. Rigid foam insulation, interior side of stemwall under slab on grade.
|
BLD-Foundation | 9/10/2012 | 9/13/2012 | 9/13/2012 | A | DEFR |
Mike Jordan
|
|
|
late am -- Joe Phone #: ###-####
|
BLD-Foundation | 9/10/2012 | 9/12/2012 | 9/12/2012 | A | PART |
Mike Jordan
|
|
|
late am -- Joe Phone #: ###-####. West stemwall, remainder of east footing. Work is in progress. Will be ok for concrete after special inspection has passed.
|
BLD-Foundation | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PART |
Mike Jordan
|
|
|
late am -- Joe Phone #: ###-####. Stem wall, south wall for 2hr. masonry wall. Work is in progress on placing forms. Needs to provide additional verts at masonry corners. Will be ok to place concrete after special inspection has passed.
|
BLD-Footing | 9/6/2012 | 9/10/2012 | 9/10/2012 | P | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####. East footing line, work in progress. Will be ok for concrete after special inspection has passed.
|
BLD-Footing | 9/6/2012 | 9/7/2012 | 9/7/2012 | P | CANC |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Stemwall, north footing line.
|
BLD-Footing | 9/4/2012 | 9/6/2012 | 9/6/2012 | P | PART |
Mike Jordan
|
|
|
joe Phone #: ###-####. East footing line, work in progress. Will have special inspection. Ok for concreter after special inspector has passed area of work.
|
BLD-Footing | 9/5/2012 | 9/5/2012 | 9/5/2012 | P | PASS |
Mike Jordan
|
|
|
Reinforcemen ast south footing line for 2hr. masonry wall. ok. Will have special inspection.
|
BLD-Footing | 9/4/2012 | 9/5/2012 | 9/5/2012 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Footing | 8/30/2012 | 9/4/2012 | 9/4/2012 | P | PART |
Mike Jordan
|
|
|
Late as possible - Joe Phone #: ###-####. North footing line.
|
BLD-Footing | 9/4/2012 | 9/5/2012 | 9/4/2012 | P | PART |
Mike Jordan
|
|
|
joe Phone #: ###-####. North footing. Will have special inspection.
|
Print Occupancy Form | | | 8/30/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 4/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
Route to Impact Fee Review | 3/19/2012 | 3/22/2012 | 4/5/2012 | | PASS |
Cindy M. Gould
|
|
|
there is an impact fee refund due because of a reduction in square footage.I will
|
Plan assigned to (JCM) | 2/29/2012 | 2/29/2012 | 4/5/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/23/2012 | | 4/5/2012 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2012 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 4/5/2012 | | |
|
|
|
|
Override - Parcel Holds | | | 4/5/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 4/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/5/2012 | | DONE |
Tisha Gallop
|
|
|
called Wayne Thowless and left vm plan mod is ready and fees.
|
Routing Off Site - STRUCTURAL | 3/30/2012 | | 4/3/2012 | | PASS |
John Menard
|
|
|
Received letter from consulting structural engineer approving final requested revisions. JCM
|
Telephone call | | | 3/30/2012 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up.
|
Plan resubmittals received | | | 3/30/2012 | | DONE |
Tisha Gallop
|
|
|
received three copies of response, supplemental structural calcs, and plan sheets S0.1, S1.1, S2.2, S3.2, S3.5; inserted by arch. rep. and taken back to John Menard.
|
Plan resubmittals requested | | | 3/27/2012 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural comment list requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 3/23/2012 | | 3/26/2012 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - FIRE | 3/19/2012 | 3/19/2012 | 3/23/2012 | | PASS |
Scott Arellano
|
|
|
Attached modified IFC comments to plans.
|
Telephone call | | | 3/23/2012 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 3/22/2012 | | DONE |
Tisha Gallop
|
|
|
received response and three copies of supplemental structural calcs and plan sheets S-01, S01.1, S-2.2, S-3.1, S-3.4, S-3.5; inserted by arch. rep. and taken back to Fire Review.
|
Routing - PLANNING | 3/19/2012 | | 3/19/2012 | | PASS |
Cody Riddle
|
|
|
CUP10-00034 Cody Riddle/No changes to the use/layout regulated by the CUP.
|
Routing - PLUMBING | 3/14/2012 | | 3/16/2012 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Routing Off Site - STRUCTURAL | 2/29/2012 | | 3/15/2012 | | FAIL |
John Menard
|
|
|
Called Action Couriers for pick up @ 8:41am//BAS - Received comment list from consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 3/15/2012 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review for the project plan modification. JCM
|
Routing - Design Review | 3/13/2012 | | 3/14/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 3/5/2012 | | 3/13/2012 | | PASS |
John Menard
|
|
|
John Menard
|
Routing PW Drainage | 3/1/2012 | | 3/5/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 3/5/2012 | | 3/5/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 2/29/2012 | | 3/5/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 2/29/2012 | | 2/29/2012 | | PASS |
Todd Tucker
|
|
|
|
Plan Modification Accepted | | | 2/29/2012 | | |
|
|
|
Plan modification accepted to change from building a two story building to now building a one story building. Footprint remains unchanged, all site work and site improvements remain unchanged. Site civil changes are limited to one chnge roof drain connection location & trench in lieu of box type area drain. Impervious area & disturbed area remain unchanged. 3 copies of the following sheets were submitted- Cover, C-1.0, C-2.0, SD-1.0, SD-1.2, SD-1.3, L-1.1, A-1.1, A-1.2, A-2.1. A-3.1, A-3.2, A-3.3, A-3.4, A-3.5, A-4.1, A-4.2, A-5.1, A-5.2, A-6.1, A-7.1, A-7.2, A-7.3, A-7.4, A-8.1, A-8.2, A-8.3, A-8.4, A-8.5, A-8.6, A-8.7, A-8.8, A-8.9, A-9.1, A-10.1, A-10.2, A-11.1, A-11.2, S-.01, S-0.2, S-1.1, S-2.1, S-2.2, S-2.3, S-3.1, S-3.2, S-3.3, S-3.4, S-3.5, S-7.1, S-7.2, S-7.3, S-7.4, FS-1.1, MC-1.1, MC-1.2, M-1.1, M-1.2, M-1.3, M-2.1, M-2.2, M-3.1, M-3.2, P-1.1, P-1.2, P-1.3, P-2.1, P-2.1, P-2.2, P-2.3, P-3.1, P- 3.2, P-4.1, E-1.0, E-2.0, F-2.0L, F-2.0MP, F-2.0P, F-2.0S, F-2.1F, F-2.1L, F-2.1MP, F-2.1P, F-2.1S, F-2.1R, F-3.0, F-3.1, F-3.4, F-3.5. 3 copies of structural calcs, 3 copies of project manual. The new project value went down to $1,517,000.
|
Plan Reviewer's activity | | | 2/7/2012 | | DONE |
Jason Blais
|
|
|
Applicant sent an extension letter in but permit is still valid until 7/25/12. Let applicant know.
|
Issue PAID IN FULL permit | | | 7/26/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/6/2011 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Steve Carlson that permit is ready, fees, need GC, RP, ACHD. Said volunteer cannot sign for GC, but if wants he can sign for owner GC. Also need to hire certified RP or he can sign up for IRP and receive books for $10.60.
|
Permit Ready to Issue | | | 6/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2011 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JCM) | 10/8/2010 | | 6/3/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 11/24/2010 | | 6/3/2011 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 5/31/2011 | | 6/2/2011 | | PASS |
John Menard
|
|
|
E-mailed consulting engineer electronic copies of structural revisions. JCM Received E-mail from consulting engineer with approval of final structural revisions with one redlined detail required. JCM
|
Plan resubmittals received | | | 6/1/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of response, three copies of structural calcs and plan sheets S-2.1, S-2.3, S-3.4; inserted into plans by arch. rep. and taken back to John Menard.
|
Plan resubmittals requested | | | 5/27/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the fifth structural review requesting additional revisions. JCM
|
Routing Off Site - STRUCTURAL | 5/17/2011 | | 5/26/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting additional revisions. JCM
|
Plan resubmittals received | | | 5/17/2011 | | DONE |
Tisha Gallop
|
|
|
received response, three copies of calculations, two copies of revised plan cover sheet and three copies of plan sheets S0.1, S0.2, S1.1, S2.1, S2.2, S2.3, S3.1, S3.2, S3.3, S3.4, S3.5, S7.1, S7.2, S7.3, S7.4; inserted by arch. rep. and taken back to John Menard.
|
Telephone call | | | 5/17/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Extend Review Timeline | | | 4/29/2011 | | DONE |
Jason Blais
|
|
|
A 180 day extension is granted from 4/6/11 for an application under review. Approval document attached to this case.
|
Plan Reviewer's activity | | | 4/22/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect indicating that an extention letter was required to be submitted to extend the permit application for 90 days. JCM
|
Routing Off Site - STRUCTURAL | 4/5/2011 | | 4/15/2011 | | FAIL |
John Menard
|
|
|
Received comment list for the fourth structural review requesting additional corrections. JCM
|
Plan resubmittals requested | | | 4/15/2011 | | DONE |
John Menard
|
|
|
E-mailed a copy of the fourth structural review to the project architect and structural engineer requesting additional revisions. JCM
|
Plan resubmittals received | | | 4/5/2011 | | |
Barbara Stitt
|
|
|
Recieved 3 copies of sheets S-0.1, S-0.2, S-1.1, S-2.1, S-2.2, S-3.1, S-3.2, S-3.3, S-3.4, S-3.5, S-7.1, S-7.2, S-7.3, S-7.4, 2 copies of plan review response letter from Brian Sielaff dated 4-4-11, 2 copies of suplemental structural engineering calcs taken to John Menard
|
Telephone call | | | 4/5/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up of resubs
|
Routing Off Site - STRUCTURAL | 3/3/2011 | | 3/11/2011 | | FAIL |
John Menard
|
|
|
Picked up by Action Couriers 3-3-11 - Received third structural comment list from our consulting structural engineer. there continues to be problems resolving the structural items. JCM
|
Plan resubmittals received | | | 3/3/2011 | | DONE |
Christina Prado
|
|
|
received transmittal; two copies of reponse letter, three copies of new structual calcs;and three set of plans A-3.1, A-3.2, A-3.3, A-4.1, A-7.3, S-0.1, S-1.1, S-2.1, S-2.2, S-3.2, S-3.3, S-3.4, S-3.5, S-7.1, S-7.3. two sets of plans inserted by rep. Routed back to John Menard for review.
|
Telephone call | | | 3/3/2011 | | DONE |
Christina Prado
|
|
|
Called Action Couriers for pick up of third set of re-submittals.
|
Plan resubmittals requested | | | 1/3/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting additional revisions. JCM
|
Routing Off Site - STRUCTURAL | 12/20/2010 | | 12/30/2010 | | FAIL |
John Menard
|
|
|
12-20-10 called Action Couriers for pick up - Received comment list from consulting structural engineer requesting additional revisions. JCM
|
Plan Reviewer's activity | | | 12/20/2010 | | PASS |
John Menard
|
|
|
Reviewed and approved nonstructural revisions.JCM
|
Plan resubmittals received | | | 12/17/2010 | | DONE |
Tisha Gallop
|
|
|
received two copies of resonse letters from architect and engineers, plan sheets Cover, C1.0, C.2.0, C4.0, SD-1.0, SD1.1, SD1.3, SD1.3, SD1.4, L1.1, A1.1, A1.2, A2.1, A3.1, A3.2, A3.3, A3.4, A4.1, A4.2, A5.1, A5.2, A6.1, A7.1, A7.2, A7.3, A7.4, A8.1, A8.2, A8.4, A8.6, A9.1, A10.1, A10.2, A11.1, A11.2, MC1.2, MC1.1, MC1.2, MC1.3, MC2.2, MC3.1, MC3.2, P1.1, P1.2, E1.0, E2.0F, E2.0L, E2.0MP, E2.0P, E2.0S, E2.1F, E2.1L, E2.1MP, E2.1P, E2.1S, E2.3R, E3.0, E3.5, three copies of structural calcs and plan sheets S0.1, S1.1, S2.1, 2.2, S3.1, S3.2, S3.3, S3.4, S3.5, S7.1, S7.2, S7.3; insterted by arch. rep. and taken back to John Menard.
|
Routing - FIRE | 11/18/2010 | 11/18/2010 | 11/24/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 11/24/2010 | | FAIL |
|
|
|
Failed Structural & Plan Check
|
Route to Impact Fee Review | 11/18/2010 | 11/23/2010 | 11/18/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 11/18/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PLAN CHECK | 10/25/2010 | | 11/18/2010 | | FAIL |
John Menard
|
|
|
John Menard
|
Plan resubmittals requested | | | 11/8/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 10/8/2010 | | 11/5/2010 | | FAIL |
John Menard
|
|
|
Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 10/25/2010 | | 10/25/2010 | | PASS |
Cody Riddle
|
|
|
CUP10-00034 Cody Riddle
|
Routing - Design Review | 10/22/2010 | | 10/25/2010 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH10-00120. Routing over to current planning for sign off.
|
Routing - PLUMBING | 10/21/2010 | | 10/22/2010 | | PASS |
Bill VanDegrift
|
|
|
oil interceptor venting may not be tied to the sanitary sewer venting system. per plans and 2003 upc
|
Routing - Erosion and Sediment | 10/20/2010 | | 10/21/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00787
|
Plan resubmittals received | | | 10/21/2010 | | DONE |
|
|
|
received 1 transmittal , and 4 copies of sheet C1.0 sent to John M
|
Routing PW Drainage | 10/13/2010 | | 10/20/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | | | 10/20/2010 | | PASS |
Peter J. McCullough
|
|
|
Gates to enclosures must open 120 degrees minimum
|
Routing - PUBLIC WORKS | 10/11/2010 | | 10/20/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 10/13/2010 | | 10/13/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 10/12/2010 | | 10/12/2010 | | PASS |
Terry Records
|
|
|
Assigned new address of 113 S. Auto Dr.
|
Routing - PLANNING Land Div | 10/8/2010 | | 10/11/2010 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 10/8/2010 | 10/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 10/8/2010 | | 10/8/2010 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 10/8/2010 | | PASS |
Sam Zahorka
|
|
|
|
Telephone call | | | 10/8/2010 | | DONE |
Tisha Gallop
|
|
|
Called Action Couriers for pick up several times and line busy. Action Courier was in office dropping of package for other project and when I told him all I get is a busy signal he said he would take it and let his dispatch know.
|