Permit Information
Permit NumberBLD10-02432
StatusFinaled
Name JOSEPH GENOVESE
Site Address 113 S AUTO DR
Project NameCalvary Chapel
Customer Number 
ePlanReviewNo
Description
Calvary Chapel New Education Building - To construct a new 15,025 square foot, one story, wood framed and masonry education building and related site improvements. This building is being separated from the existing one story education building, on the south, by a two-hour fire-resistive masonry fire wall. This building is fully fire sprinkled. The sprinklers are used for area increase. This permit also covers the demo and reconstruction of gable roof areas at the east and west sides of the existing preschool building and sanctuary building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/9/20141/23/2014 DONE
First Notice 12/14/201312/30/2013 DONE
mailed to Joe Genovese at Craig James Ln., Eagle address.
BLD-Final12/3/201312/4/201312/4/2013PPASS
DetailsMike Jordan
joe Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  12/4/2013 DONE
Zoning Approval12/3/201312/3/201312/3/2013 PASS
DetailsJosh Wilson
BLD-Final9/10/20139/11/20139/11/2013APART
DetailsJim Storey
joe Phone #: ###-#### temp ok pending p&z sign off// mike needs si close out letter.
Temporary Occupancy9/11/201312/10/20139/11/2013 DONE
DetailsDarla L Downs
FIRE-Final Inspection9/9/20139/10/20139/10/2013APASS
DetailsCraig D. Hanson
Zoning Approval Temp9/10/20139/10/20139/10/2013 PASS
DetailsJosh Wilson
90-day temp occ for completion of improvements
Plan assigned to (JCM)9/9/20139/9/20139/10/2013 PASS
DetailsJohn Menard
Print Occupancy Form  9/10/2013 DONE
Permit Ready to Issue  9/10/2013 DONE
CHANGE STATUS TO (ISS)  9/10/2013 DONE
(F) Reprint permit  9/10/2013 DONE
Routing - PLAN CHECK9/10/2013 9/10/2013 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  9/10/2013 DONE
DetailsJohn Menard
PubWorks Occupancy Approval9/9/20139/9/20139/9/2013 DONE
DetailsTiffany Lowery
Routing - Design Review9/9/2013 9/9/2013 PASS
DetailsJosh Wilson
OK per DRH13-00279
Routing - FIRE9/9/2013 9/9/2013 PASS
DetailsScott Arellano
Plan modification approved.
Plan Modification Accepted  9/9/2013 DONE
Plan mod to change layoff off play ground, outside modifications only - Sheets SD1.0l SD1.2; SD1.4; L1.1; C1.0; C2.0 - taken to John M
FIRE-Final Inspection9/5/20139/6/20139/6/2013PFAIL
DetailsTroy Cobbley
Relocate the fire extinguisher to the Storage Room as per the approved plans and provide documentation or resubmittals that show the revised fire dept access on the east side of the building.
PubWorks Occupancy Approval9/6/20139/6/20139/6/2013 DONE
DetailsJason C. Taylor
PW did not perform any inspections on this project. All inspection were done by and approved by the Civil Engineer. Approval letter recieved. Occuppancy is approved by PW. Jason Taylor ###-####
BLD-Energy code compliance6/10/20136/11/20136/11/2013APASS
DetailsMike Jordan
joe Phone #: ###-####
BLD-Energy code compliance6/6/20136/7/20136/7/2013APART
DetailsMike Jordan
joe Phone #: ###-####. airseal only ok.
BLD-Framing/Rough-in5/16/20135/17/20135/17/2013PPASS
DetailsTom Arcoraci
call 1/2 hr prior//Paul Smith Phone #: ###-####
BLD-Framing/Rough-in4/3/20134/3/20134/3/2013PPART
DetailsMike Jordan
Shear inspection please-- Phone #: ###-####. Exterior shear nailing ok. Need RFI from engineer of record deleting one MSTC strap from CMU wall to wood wall construction. Approved plan shows 2 mstc straps at each location.
BLD-Final3/29/20134/1/20134/1/2013ACANC
DetailsMike Jordan
paul Phone #: ###-####
BLD-Conference4/1/20134/1/20134/1/2013APASS
DetailsMike Jordan
paul Phone #: ###-####. Received RFI paperwork from engineer of record noting the deletionof the 2nd. tension device and tghat the 21" all thread lenght being acceptable.
BLD-Other3/28/20133/28/20133/28/2013PPART
DetailsMike Jordan
Roof fastening - Paul Phone #: ###-####. Lower roof nailing and diaphragm ok. Need RFI from engineer on HHDQ-S2.5 holdowns. Noted 21 inches of all thread rod before holdown device connection. Simson specs allow for 8" above surface with no reduction as long as bolt elongation has been accounted for. Enginner to review and also review the in place work for only one tension device in each location. Approved plan shows 2 devices in each location.
BLD-Other3/4/20133/5/20133/5/2013PPASS
DetailsMike Jordan
roof sheathing//Joe Phone #: ###-####. Roof sheathing over gym ok. 1 1/8 ply has been substituted in lieu of 3/4 inch ply. Ledger blocking size also increased for proper bearing of roof joist. All lateral bracing on roof joist over gym ok and installed per truss engineering. MPAI130 straps used on roof sheating as well, strap size was aslo increased. Engineer of record to supply RFI for above noted changes.
BLD-Framing/Rough-in2/26/20132/27/20132/27/2013APASS
DetailsJim Storey
joe - roof framing Phone #: ###-#### 450 insp. ok
BLD-Conference2/12/20132/12/20132/12/2013PDONE
DetailsMike Jordan
Stopped at jobsite to review special inspection reports and to talk with contractor about any issues or concerns he may have.
BLD-Final12/27/201212/28/201212/28/2012ADEFR
DetailsTom Arcoraci
joe late morning if possible Phone #: ###-####
BLD-Other12/17/201212/18/201212/18/2012ADEFR
DetailsMike Jordan
joe - grout Phone #: ###-####. Special inspector on site.
BLD-Other12/14/201212/17/201212/17/2012APASS
DetailsMike Jordan
block wall grouting - joe Phone #: ###-####.
BLD-Other12/11/201212/12/201212/12/2012APART
DetailsMike Jordan
joe - block wall grout Phone #: ###-####. south masonry wall, 8ft. to 12ft. elevation pending special inspetions. Contractor also working on detail for approved firestop system at expansion joints on south wall, will either be from metecaulk or hilti.
BLD-Other12/7/201212/11/201212/11/2012APART
DetailsMike Jordan
joe - grout Phone #: ###-####. 4ft. to 8ft. elevation, south wall, pending special inspection. Also noted to contractor to provide UL listing for expansion joint as the south wall is a fire rated wall. Will need access to back side. Also verified all special inspectors certifications.
BLD-Other12/4/201212/5/201212/5/2012APART
DetailsMike Jordan
masonry grout ins//Joe Phone #: ###-####. South wall, 0 to 4ft. elevation. Work in progress went over plans with masonry foreman and job super. Ok for grout placement after special inspector has passed in place work.
BLD-Footing11/6/201211/8/201211/8/2012PPASS
DetailsJim Storey
footing and rebar///Joe Genovese Phone #: ###-#### interior ft rebar ok
BLD-Foundation9/14/20129/17/20129/17/2012ACANC
DetailsMike Jordan
joe Phone #: ###-####
BLD-Energy code compliance9/17/20129/17/20129/17/2012APASS
DetailsMike Jordan
joe Phone #: ###-####. Rigid foam insulation, interior side of stemwall under slab on grade.
BLD-Foundation9/10/20129/13/20129/13/2012ADEFR
DetailsMike Jordan
late am -- Joe Phone #: ###-####
BLD-Foundation9/10/20129/12/20129/12/2012APART
DetailsMike Jordan
late am -- Joe Phone #: ###-####. West stemwall, remainder of east footing. Work is in progress. Will be ok for concrete after special inspection has passed.
BLD-Foundation9/10/20129/11/20129/11/2012APART
DetailsMike Jordan
late am -- Joe Phone #: ###-####. Stem wall, south wall for 2hr. masonry wall. Work is in progress on placing forms. Needs to provide additional verts at masonry corners. Will be ok to place concrete after special inspection has passed.
BLD-Footing9/6/20129/10/20129/10/2012PPART
DetailsMike Jordan
Joe Phone #: ###-####. East footing line, work in progress. Will be ok for concrete after special inspection has passed.
BLD-Footing9/6/20129/7/20129/7/2012PCANC
DetailsMike Jordan
Joe Phone #: ###-####. Stemwall, north footing line.
BLD-Footing9/4/20129/6/20129/6/2012PPART
DetailsMike Jordan
joe Phone #: ###-####. East footing line, work in progress. Will have special inspection. Ok for concreter after special inspector has passed area of work.
BLD-Footing9/5/20129/5/20129/5/2012PPASS
DetailsMike Jordan
Reinforcemen ast south footing line for 2hr. masonry wall. ok. Will have special inspection.
BLD-Footing9/4/20129/5/20129/5/2012ACANC
DetailsMike Jordan
BLD-Footing8/30/20129/4/20129/4/2012PPART
DetailsMike Jordan
Late as possible - Joe Phone #: ###-####. North footing line.
BLD-Footing9/4/20129/5/20129/4/2012PPART
DetailsMike Jordan
joe Phone #: ###-####. North footing. Will have special inspection.
Print Occupancy Form  8/30/2012 DONE
CHANGE STATUS TO (ISS)  4/6/2012 DONE
DetailsBarbara Stitt
(F) Reprint permit  4/6/2012 DONE
DetailsBarbara Stitt
Route to Impact Fee Review3/19/20123/22/20124/5/2012 PASS
DetailsCindy M. Gould
there is an impact fee refund due because of a reduction in square footage.I will
Plan assigned to (JCM)2/29/20122/29/20124/5/2012 PASS
DetailsJohn Menard
Routing - PLAN CHECK3/23/2012 4/5/2012 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  4/5/2012 DONE
DetailsJohn Menard
Print Occupancy Form  4/5/2012  
Override - Parcel Holds  4/5/2012  
Permit Ready to Issue  4/5/2012 DONE
DetailsTisha Gallop
Telephone call  4/5/2012 DONE
DetailsTisha Gallop
called Wayne Thowless and left vm plan mod is ready and fees.
Routing Off Site - STRUCTURAL3/30/2012 4/3/2012 PASS
DetailsJohn Menard
Received letter from consulting structural engineer approving final requested revisions. JCM
Telephone call  3/30/2012 DONE
DetailsTisha Gallop
called Action Couriers for pick up.
Plan resubmittals received  3/30/2012 DONE
DetailsTisha Gallop
received three copies of response, supplemental structural calcs, and plan sheets S0.1, S1.1, S2.2, S3.2, S3.5; inserted by arch. rep. and taken back to John Menard.
Plan resubmittals requested  3/27/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural comment list requesting revisions. JCM
Routing Off Site - STRUCTURAL3/23/2012 3/26/2012 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - FIRE3/19/20123/19/20123/23/2012 PASS
DetailsScott Arellano
Attached modified IFC comments to plans.
Telephone call  3/23/2012 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan resubmittals received  3/22/2012 DONE
DetailsTisha Gallop
received response and three copies of supplemental structural calcs and plan sheets S-01, S01.1, S-2.2, S-3.1, S-3.4, S-3.5; inserted by arch. rep. and taken back to Fire Review.
Routing - PLANNING3/19/2012 3/19/2012 PASS
DetailsCody Riddle
CUP10-00034 Cody Riddle/No changes to the use/layout regulated by the CUP.
Routing - PLUMBING3/14/2012 3/16/2012 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC.
Routing Off Site - STRUCTURAL2/29/2012 3/15/2012 FAIL
DetailsJohn Menard
Called Action Couriers for pick up @ 8:41am//BAS - Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  3/15/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review for the project plan modification. JCM
Routing - Design Review3/13/2012 3/14/2012 PASS
DetailsJosh Wilson
Routing - PLAN CHECK3/5/2012 3/13/2012 PASS
DetailsJohn Menard
John Menard
Routing PW Drainage3/1/2012 3/5/2012 PASS
DetailsBrian Murphy
Routing PW Sewer Rating3/5/2012 3/5/2012 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS2/29/2012 3/5/2012 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div2/29/2012 2/29/2012 PASS
DetailsTodd Tucker
Plan Modification Accepted  2/29/2012  
Plan modification accepted to change from building a two story building to now building a one story building. Footprint remains unchanged, all site work and site improvements remain unchanged. Site civil changes are limited to one chnge roof drain connection location & trench in lieu of box type area drain. Impervious area & disturbed area remain unchanged. 3 copies of the following sheets were submitted- Cover, C-1.0, C-2.0, SD-1.0, SD-1.2, SD-1.3, L-1.1, A-1.1, A-1.2, A-2.1. A-3.1, A-3.2, A-3.3, A-3.4, A-3.5, A-4.1, A-4.2, A-5.1, A-5.2, A-6.1, A-7.1, A-7.2, A-7.3, A-7.4, A-8.1, A-8.2, A-8.3, A-8.4, A-8.5, A-8.6, A-8.7, A-8.8, A-8.9, A-9.1, A-10.1, A-10.2, A-11.1, A-11.2, S-.01, S-0.2, S-1.1, S-2.1, S-2.2, S-2.3, S-3.1, S-3.2, S-3.3, S-3.4, S-3.5, S-7.1, S-7.2, S-7.3, S-7.4, FS-1.1, MC-1.1, MC-1.2, M-1.1, M-1.2, M-1.3, M-2.1, M-2.2, M-3.1, M-3.2, P-1.1, P-1.2, P-1.3, P-2.1, P-2.1, P-2.2, P-2.3, P-3.1, P- 3.2, P-4.1, E-1.0, E-2.0, F-2.0L, F-2.0MP, F-2.0P, F-2.0S, F-2.1F, F-2.1L, F-2.1MP, F-2.1P, F-2.1S, F-2.1R, F-3.0, F-3.1, F-3.4, F-3.5. 3 copies of structural calcs, 3 copies of project manual. The new project value went down to $1,517,000.
Plan Reviewer's activity  2/7/2012 DONE
DetailsJason Blais
Applicant sent an extension letter in but permit is still valid until 7/25/12. Let applicant know.
Issue PAID IN FULL permit  7/26/2011 DONE
DetailsTisha Gallop
Telephone call  6/6/2011 DONE
DetailsTisha Gallop
called and left vm for Steve Carlson that permit is ready, fees, need GC, RP, ACHD. Said volunteer cannot sign for GC, but if wants he can sign for owner GC. Also need to hire certified RP or he can sign up for IRP and receive books for $10.60.
Permit Ready to Issue  6/6/2011 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  6/3/2011 DONE
DetailsJohn Menard
Print Occupancy Form  6/3/2011 DONE
DetailsTisha Gallop
Plan assigned to (JCM)10/8/2010 6/3/2011 PASS
DetailsJohn Menard
Routing - PLAN CHECK11/24/2010 6/3/2011 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL5/31/2011 6/2/2011 PASS
DetailsJohn Menard
E-mailed consulting engineer electronic copies of structural revisions. JCM Received E-mail from consulting engineer with approval of final structural revisions with one redlined detail required. JCM
Plan resubmittals received  6/1/2011 DONE
DetailsTisha Gallop
received two copies of response, three copies of structural calcs and plan sheets S-2.1, S-2.3, S-3.4; inserted into plans by arch. rep. and taken back to John Menard.
Plan resubmittals requested  5/27/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the fifth structural review requesting additional revisions. JCM
Routing Off Site - STRUCTURAL5/17/2011 5/26/2011 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting additional revisions. JCM
Plan resubmittals received  5/17/2011 DONE
DetailsTisha Gallop
received response, three copies of calculations, two copies of revised plan cover sheet and three copies of plan sheets S0.1, S0.2, S1.1, S2.1, S2.2, S2.3, S3.1, S3.2, S3.3, S3.4, S3.5, S7.1, S7.2, S7.3, S7.4; inserted by arch. rep. and taken back to John Menard.
Telephone call  5/17/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Extend Review Timeline  4/29/2011 DONE
DetailsJason Blais
A 180 day extension is granted from 4/6/11 for an application under review. Approval document attached to this case.
Plan Reviewer's activity  4/22/2011 DONE
DetailsJohn Menard
E-mailed the architect indicating that an extention letter was required to be submitted to extend the permit application for 90 days. JCM
Routing Off Site - STRUCTURAL4/5/2011 4/15/2011 FAIL
DetailsJohn Menard
Received comment list for the fourth structural review requesting additional corrections. JCM
Plan resubmittals requested  4/15/2011 DONE
DetailsJohn Menard
E-mailed a copy of the fourth structural review to the project architect and structural engineer requesting additional revisions. JCM
Plan resubmittals received  4/5/2011  
DetailsBarbara Stitt
Recieved 3 copies of sheets S-0.1, S-0.2, S-1.1, S-2.1, S-2.2, S-3.1, S-3.2, S-3.3, S-3.4, S-3.5, S-7.1, S-7.2, S-7.3, S-7.4, 2 copies of plan review response letter from Brian Sielaff dated 4-4-11, 2 copies of suplemental structural engineering calcs taken to John Menard
Telephone call  4/5/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up of resubs
Routing Off Site - STRUCTURAL3/3/2011 3/11/2011 FAIL
DetailsJohn Menard
Picked up by Action Couriers 3-3-11 - Received third structural comment list from our consulting structural engineer. there continues to be problems resolving the structural items. JCM
Plan resubmittals received  3/3/2011 DONE
DetailsChristina Prado
received transmittal; two copies of reponse letter, three copies of new structual calcs;and three set of plans A-3.1, A-3.2, A-3.3, A-4.1, A-7.3, S-0.1, S-1.1, S-2.1, S-2.2, S-3.2, S-3.3, S-3.4, S-3.5, S-7.1, S-7.3. two sets of plans inserted by rep. Routed back to John Menard for review.
Telephone call  3/3/2011 DONE
DetailsChristina Prado
Called Action Couriers for pick up of third set of re-submittals.
Plan resubmittals requested  1/3/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting additional revisions. JCM
Routing Off Site - STRUCTURAL12/20/2010 12/30/2010 FAIL
DetailsJohn Menard
12-20-10 called Action Couriers for pick up - Received comment list from consulting structural engineer requesting additional revisions. JCM
Plan Reviewer's activity  12/20/2010 PASS
DetailsJohn Menard
Reviewed and approved nonstructural revisions.JCM
Plan resubmittals received  12/17/2010 DONE
DetailsTisha Gallop
received two copies of resonse letters from architect and engineers, plan sheets Cover, C1.0, C.2.0, C4.0, SD-1.0, SD1.1, SD1.3, SD1.3, SD1.4, L1.1, A1.1, A1.2, A2.1, A3.1, A3.2, A3.3, A3.4, A4.1, A4.2, A5.1, A5.2, A6.1, A7.1, A7.2, A7.3, A7.4, A8.1, A8.2, A8.4, A8.6, A9.1, A10.1, A10.2, A11.1, A11.2, MC1.2, MC1.1, MC1.2, MC1.3, MC2.2, MC3.1, MC3.2, P1.1, P1.2, E1.0, E2.0F, E2.0L, E2.0MP, E2.0P, E2.0S, E2.1F, E2.1L, E2.1MP, E2.1P, E2.1S, E2.3R, E3.0, E3.5, three copies of structural calcs and plan sheets S0.1, S1.1, S2.1, 2.2, S3.1, S3.2, S3.3, S3.4, S3.5, S7.1, S7.2, S7.3; insterted by arch. rep. and taken back to John Menard.
Routing - FIRE11/18/201011/18/201011/24/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  11/24/2010 FAIL
Failed Structural & Plan Check
Route to Impact Fee Review11/18/201011/23/201011/18/2010 PASS
DetailsCindy M. Gould
Plan resubmittals requested  11/18/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLAN CHECK10/25/2010 11/18/2010 FAIL
DetailsJohn Menard
John Menard
Plan resubmittals requested  11/8/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL10/8/2010 11/5/2010 FAIL
DetailsJohn Menard
Received comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING10/25/2010 10/25/2010 PASS
DetailsCody Riddle
CUP10-00034 Cody Riddle
Routing - Design Review10/22/2010 10/25/2010 PASS
DetailsSarah Schafer
Approved per DRH10-00120. Routing over to current planning for sign off.
Routing - PLUMBING10/21/2010 10/22/2010 PASS
DetailsBill VanDegrift
oil interceptor venting may not be tied to the sanitary sewer venting system. per plans and 2003 upc
Routing - Erosion and Sediment10/20/2010 10/21/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00787
Plan resubmittals received  10/21/2010 DONE
received 1 transmittal , and 4 copies of sheet C1.0 sent to John M
Routing PW Drainage10/13/2010 10/20/2010 PASS
DetailsBrian Murphy
Routing PW Solid Waste  10/20/2010 PASS
DetailsPeter J. McCullough
Gates to enclosures must open 120 degrees minimum
Routing - PUBLIC WORKS10/11/2010 10/20/2010 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating10/13/2010 10/13/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing10/12/2010 10/12/2010 PASS
DetailsTerry Records
Assigned new address of 113 S. Auto Dr.
Routing - PLANNING Land Div10/8/2010 10/11/2010 PASS
DetailsTodd Tucker
Application received 10/8/201010/8/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  10/8/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/8/2010 DONE
DetailsTisha Gallop
Pending Assignment by JCM10/8/2010 10/8/2010 DONE
DetailsJohn Menard
Intake Approval  10/8/2010 PASS
DetailsSam Zahorka
Telephone call  10/8/2010 DONE
DetailsTisha Gallop
Called Action Couriers for pick up several times and line busy. Action Courier was in office dropping of package for other project and when I told him all I get is a busy signal he said he would take it and let his dispatch know.