Letter of compliance/Occupancy | | | 6/3/2011 | | DONE |
|
|
|
|
BLD-Final | 5/10/2011 | 5/11/2011 | 5/11/2011 | A | PASS |
Jim Sly
|
|
|
Please call ###-####(Cinnamon)before you come so I can meet you at jobsite. Phone #: ###-#### >> Inspection requested via web by Jed Dilworth C/C issued
|
DOC - Permit Finaled | 5/11/2011 | 5/11/2011 | 5/11/2011 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 3/9/2011 | 3/9/2011 | 3/10/2011 | P | PASS |
Jim Sly
|
|
|
Please call when you are headed over to do inspection so I can meet you there. I am about 5 minutes from site. Thanks Phone #: ###-#### >> Inspection requested via web by Jed Dilworth
|
BLD-Framing/Rough-in | 3/7/2011 | 3/7/2011 | 3/8/2011 | P | PASS |
Jim Sly
|
|
|
Jed phone
|
BLD-Framing/Rough-in | 3/6/2011 | 3/7/2011 | 3/7/2011 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jed Dilworth All OK except Lat brace top chords select trusses.
|
BLD-Foundation | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | PASS |
Jim Sly
|
|
|
ben Phone #: ###-####
|
BLD-Footing | 1/14/2011 | 1/14/2011 | 1/14/2011 | P | PASS |
Tom Arcoraci
|
|
|
ben Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/29/2010 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 11/10/2010 | | |
|
|
|
|
Telephone call | | | 11/10/2010 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Cinnamon that permit is ready & fees due on 11-10-10 @ 9:00am
|
Permit Ready to Issue | | | 11/10/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CDM) | 10/12/2010 | 10/12/2010 | 11/9/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - Addressing | 10/12/2010 | | 11/9/2010 | | PASS |
Carl D Madsen
|
|
|
Signed off per public works sheet by Terry Records
|
Routing - PLAN CHECK | 11/9/2010 | | 11/9/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 11/9/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/9/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/3/2010 | | DONE |
|
|
|
Basement Beam information provided. Uplift on the left end of the beam need to be addressed 11-3-10 CDM
|
Routing - PLAN CHECK | 11/3/2010 | | 11/3/2010 | | FAIL |
Carl D Madsen
|
|
|
Basement Beam information provided. Uplift on the left end of the beam need to be addressed 11-3-10 CDM. Contacted Cinnamon at Dilworth construction and asked for engineering on the beam and footing and required connections for uplift.
|
Routing - PLAN CHECK | 10/14/2010 | | 10/27/2010 | | FAIL |
Carl D Madsen
|
|
|
Additional information is required. CDM
Called and talked to Jed Dilworth about the rebar requirements for the basement as wll as the lateral joist blocking and the window wells. 10-27-10
|
1st review completed | | | 10/27/2010 | | FAIL |
|
|
|
Additional information is required. CDM
Called and talked to Jed Dilworth about the rebar requirements for the basement as wll as the lateral joist blocking and the window wells. 10-27-10
|
Route to Impact Fee Review | 10/12/2010 | 10/15/2010 | 10/19/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 10/13/2010 | | 10/14/2010 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | | | 10/13/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 10/12/2010 | | PASS |
|
|
|
|
Application received | | 10/12/2010 | | | |
|
|
|
|