Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD10-02500
StatusFinaled
Name ASIN HOMES
Site Address 3050 N LAKEHARBOR LN Unit: 100
Project NameState Appellate Public Defende
Customer Number 
ePlanReviewNo
Description
(STATE APPELLATE PUBLIC DEFENDER – The Waterfront Building – Ste #’s 100, 101, and 200) Do not issue C of O until ugrade agreement is recieved and attached to permit..Permit is to remodel an existing 5,568 square foot office space. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create for new offices and to combine two offices to create a larger office, installation of new accessible hardware on all doors, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered for area increase, any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/1/20111/6/2011 DONE
First Notice 12/11/201012/22/2010 DONE
Permanent Occupancy UNPAID FEE  12/3/2010 DONE
DetailsChristina Prado
BLD-Conference11/30/201012/1/201012/1/2010PPASS
DetailsTony Young
We got all of the fire corrections and I have them inspecting in the am. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
FIRE-Final Inspection11/30/201012/1/201012/1/2010APASS
DetailsTroy Cobbley
Life safety passed. The fire alarm system is showing multiple trouble conditions. The owner has Allied General performing repair work. I asked Mike with Allied General to call me with an update with the panel.
BLD-Final11/24/201011/26/201011/29/2010PNR
DetailsJim Sly
Please call me and I will meet you there. Thanks. Phone #: ###-#### >> Inspection requested via web by Scott Asin
Need fire final.......
FIRE-Final Inspection11/24/201011/26/201011/26/2010AFAIL
DetailsForrest France
Correction items include; spin one exit sign 180 deg., provide directional chevrons per plan at exit sign in the middle corridor, noted modifications to the exisitng sprinkler coverage will be required due to the remodel work- one overspaced head and two heads which exceed min. separation distance, post PFE with current tag at the 2nd floor, provide approved hardware at the main entry/exit 2nd floor suite, exit sign at the 2nd floor is shown on plans- however is not installed or required, missing escutcheons at some locations. Existing building fire sprinkler system is overdue annual inspection/certification.
Print Occupancy Form  11/5/2010 DONE
DetailsBarbara Stitt
BLD-Framing/Rough-in11/4/201011/4/201011/4/2010PPASS
DetailsMike Jordan
Our HVAC contractor doesn''t think that he needs a permit or inspection since he only replaced a thermostat and ghanged some return grills. I hope he is correct. Phone #: ###-#### >> Inspection requested via web by Scott Asin
Print Occupancy Form  11/3/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  11/3/2010 DONE
Telephone call  11/3/2010  
11-3-10 called Gary Asin permit ready and fee given ///dld
Issue PAID IN FULL permit  11/3/2010 DONE
Plan assigned to (TLW)10/18/2010 11/2/2010 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK11/2/2010 11/2/2010 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  11/2/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  11/2/2010 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK10/18/2010 10/22/2010 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
1st review completed  10/22/2010 FAIL
DetailsTim L. Woodard
Application received 10/18/201010/18/2010 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  10/18/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  10/18/2010 DONE
DetailsBarbara Stitt
Intake Approval  10/18/2010 PASS
DetailsTim L. Woodard