Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02528
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 10790 W FRANKLIN RD
Project NameIdaho Power
Customer Number 
ePlanReviewNo
Description
(IDAHO POWER - BOISE OPERATIONS CENTER SPILL CONTAINMENT PROJECT) Grading permit to excavate, grade and compact site earth materials for installation of a 5,000-gallon oil and water separator and butterfly valve to provide additional capacity and separation for oils and water in the event of an accidental spill of petroleum products. Must follow grading and drainage plans as approved by the Public Works Department. No site utilities are included in this scope of work. No buildings are to be constructed or installed under this permit.//10/20/10 leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/7/201012/7/201012/8/2010 DONE
DetailsMike Jordan
This permit finaled on the web by Brandon Byington
BLD-Final12/6/201012/7/201012/7/2010PPASS
DetailsMike Jordan
Call for better directions--Mike Phone #: ###-####. Public works has finaled.
DOC - Permit Finaled12/7/201012/7/201012/7/2010PPASS
DetailsMike Jordan
PubWorks Occupancy Approval12/7/201012/7/201012/7/2010 DONE
DetailsTerry Records
(F) Reprint permit  11/3/2010  
CHANGE STATUS TO (ISS)  11/3/2010  
Plan assigned to (LEG) Tisha10/20/2010 10/29/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK10/29/2010 10/29/2010 PASS
DetailsTisha Gallop
Tisha Gallop
Routing - PLANNING10/29/2010 10/29/2010 PASS
DetailsCody Riddle
Routing - Erosion and Sediment10/28/2010 10/29/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC Permit Conditions. ESC10-00802
Inspection Record Card- Bld  10/29/2010 DONE
DetailsTisha Gallop
Case Summary (BLD)  10/29/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  10/29/2010 DONE
DetailsTisha Gallop
Telephone call  10/29/2010 DONE
DetailsTisha Gallop
Tim Mokwa from T-O Engineering called. I told him permit is ready and fee.
Routing - PUBLIC WORKS10/21/2010 10/28/2010 PASS
DetailsConnie Baumgartner
Routing PW Drainage10/25/2010 10/28/2010 PASS
DetailsBrian Murphy
Plan resubmittals received  10/27/2010 DONE
DetailsTisha Gallop
received two copies of Addendum #1 to the Storm Drainage Report and two copies of O & M Manual; put with plans at Brian Murphys desk.
Routing - Addressing10/22/2010 10/22/2010 PASS
DetailsTerry Records
Application received 10/20/201010/21/2010 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div10/21/2010 10/21/2010 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Plans ACCEPTED BY PLAN TECH  10/20/2010 DONE
DetailsTisha Gallop
Per Scott Arellano no Fire Review required for this project
Recd Pcfee & Taken To Pln CK  10/20/2010 DONE
DetailsTisha Gallop
Intake Approval  10/20/2010 PASS
DetailsTisha Gallop