BLD-Final | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 4/12/2013 | 4/12/2013 | 4/12/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/14/2013 | 1/15/2013 | 1/15/2013 | A | FAIL |
Jim Sly
|
|
|
Eric ###-#### Called Eric...He said Zoning came out and failed it. some one (un-related to this job) put some stripes on the lot in the wrong place or something.
|
BLD-Final | 1/14/2013 | 1/14/2013 | 1/15/2013 | P | NR |
Jim Sly
|
|
|
Eric Phone #: ###-#### pending Zoning final.
|
FIRE-Final Inspection | 1/11/2013 | 1/14/2013 | 1/14/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 1/2/2013 | 1/3/2013 | 1/3/2013 | A | CANC |
Troy Cobbley
|
|
|
Canceled per Erik Bird until the approved plans can be replaced. Phone #: ###-####
|
PubWorks Occupancy Approval | 1/3/2013 | 1/3/2013 | 1/3/2013 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 12/13/2012 | 12/14/2012 | 12/14/2012 | A | PEND |
Jim Sly
|
|
|
Talked to Eric.........need to call for Fire/life, Public works, Zoning and Structural final.
|
Issue PAID IN FULL permit | | | 11/30/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/29/2010 | | 11/1/2010 | | PASS |
Tisha Gallop
|
|
|
passed all applicable departments
|
Case Summary (BLD) | | | 11/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/1/2010 | | DONE |
Tisha Gallop
|
|
|
called John Carpenter and told him permit is ready and fees, need RP.
|
Plan assigned to (LEG) Tisha | 10/21/2010 | | 11/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 10/28/2010 | | 10/29/2010 | | PASS |
Scott Arellano
|
|
|
No seperate comments attached.
|
1st review completed | | | 10/29/2010 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 10/27/2010 | | 10/28/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver request is approved according to the ESC Permit conditions. ESC10-00815
|
Routing - PLANNING | 10/28/2010 | | 10/28/2010 | | PASS |
Andrea Tuning
|
|
|
The striping plans have not been included in the submitted building permit package. The applicant will be required to comply with CZC10-00214 which states, " The only parking spaces that shall be striped are the existing nine 90 degree parking spaces that are located on the south side of the building. The eight parallel parkign spaces that are located throughout the remainder of the site shall not be striped or utilized as parking." Andrea Tuning
|
Routing - PUBLIC WORKS | 10/22/2010 | | 10/27/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 10/25/2010 | | 10/27/2010 | | PASS |
Brian Murphy
|
|
|
|
Application received | | 10/21/2010 | 10/22/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING Land Div | 10/22/2010 | | 10/22/2010 | | PASS |
Dave Abo
|
|
|
Lot 3, Block 1 of Cheyenne Estates Subdivision.
|
Routing - Addressing | 10/22/2010 | | 10/22/2010 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/21/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/21/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 10/21/2010 | | PASS |
Tisha Gallop
|
|
|
|