Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-02552
StatusFinaled
Name RCH CONSTRUCTION
Site Address 1412 N 23RD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"1-12-2011 THIS PROJECT IS MODIFIED TO REFLECT THE PLACEMENT OF 2- FULLY ENGINEERED PARALELL ROOKERY TYPE RETAINING WALLS TO ALLOW FOR THE RETAINAGE OF AN EXISTING CANAL THROUGH THE PROPERTY. ADDED VALUE TO THIS PROJECT IS $5,000.00. "1-12-2011" pep .This project is to be for an exiensive remodel to and 805s.f. addition to an existing 1017s.f. 1-story single family dwelling. the project will also include new siding for the existing to match the new and the razing of an existing garage and constructing a new 2-story accessary structure to be used as a 600s.f. 2-car garage on the main level and 400s.f. of storag above accessed by a code complying stair. R-1CH ok per DRH10-00211 (siding) & CRH10-00262 (addition) by Mathew Halitsky. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked energy option (componant) engineering details; Engineer's calculations and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/8/20116/9/20116/8/2011APASS
DetailsDave Hannah
Noah Phone #: ###-####
DOC - Permit Finaled6/8/20116/8/20116/8/2011PPASS
DetailsDave Hannah
Zoning Approval6/7/20116/7/20116/7/2011 DONE
DetailsMatthew A Halitsky
BLD-Final6/6/20116/6/20116/6/2011PPART
DetailsDave Hannah
Noah Phone #: ###-#### ok to final after zoning finals
BLD-Aging Inspection3/23/20113/23/20113/23/2011 PASS
DetailsDave Hannah
Routing Walk-In (BLD)2/2/20112/2/20112/2/2011APASS
DetailsPerry Paine
BLD-Energy code compliance1/18/20111/18/20111/18/2011PPASS
DetailsDave Hannah
noah Phone #: ###-####
BLD-Framing/Rough-in1/12/20111/12/20111/12/2011PPART
DetailsDave Hannah
Noah Phone #: ###-#### framing ok but needs seal package installed
Routing Walk-In (BLD)1/12/20111/12/20111/12/2011ADONE
DetailsPerry Paine
Case Summary (BLD)  1/12/2011  
Inspection Record Card- Bld  1/12/2011  
PLANS/APPL TAKEN TO FRONT DESK  1/12/2011 DONE
Permit Ready to Issue  1/12/2011 DONE
Issue PAID IN FULL permit  1/12/2011 DONE
BLD-Conference1/3/20111/4/20111/4/2011APASS
DetailsDave Hannah
noah Phone #: ###-####
Routing Walk-In (BLD)1/4/20111/4/20111/4/2011PPASS
DetailsPerry Paine
Override - Parcel Holds1/3/20111/1/19001/3/2011  
conference
BLD-Foundation11/18/201011/18/201011/18/2010PPASS
DetailsDave Hannah
foundation wall insp//Tim Phone #: ###-####
BLD-Footing11/17/201011/17/201011/17/2010PPASS
DetailsDave Hannah
late pm//Tim ###-####
BLD-Conference11/9/201011/10/201011/10/2010APASS
DetailsDave Hannah
noah Phone #: ###-#### ftgs needs to clean them out and get a geo tec to sign off
BLD-Energy code compliance11/8/201011/9/201011/9/2010PPART
DetailsDave Hannah
Noah Phone #: ###-#### old side of house ok to cover
BLD-Framing/Rough-in11/4/201011/4/201011/5/2010PPART
DetailsDave Hannah
Noah Phone #: ###-#### ok to insulate older part of house
BLD-Conference11/3/201011/4/201011/4/2010APASS
DetailsDave Hannah
Noah Phone #: ###-####
Routing Walk-In (BLD)11/2/201011/2/201011/2/2010PDONE
DetailsPerry Paine
Plan assigned to (PEP)11/2/201011/2/201011/2/2010 PASS
DetailsPerry Paine
Plan assigned to (CDM)10/28/201010/28/201011/2/2010 FAIL
DetailsPerry Paine
Case Summary (BLD)  11/2/2010  
Inspection Record Card- Bld  11/2/2010  
1st review completed  11/2/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/2/2010 DONE
Permit Ready to Issue  11/2/2010 DONE
Issue PAID IN FULL permit  11/2/2010  
Routing Walk-In (BLD)10/28/201010/28/201010/28/2010AFAIL
DetailsCarl D Madsen
1st review completed  10/28/2010 FAIL
Routing Walk-In (Zoning)10/25/201010/25/201010/25/2010APASS
DetailsMatthew A Halitsky
Routing Walk-In (BLD)10/25/201010/25/201010/25/2010ACANC
DetailsPerry Paine
no contact
Application received 10/25/2010