Permit Information
Permit NumberBLD10-02570
StatusFinaled
Name BOISE CITY PUBLIC WORKS
Site Address 150 N CAPITOL BLVD
Project NameCity Hall third floor
Customer Number 
ePlanReviewNo
Description
(CITY OF BOISE – 3rd Floor – Lactation Room) Permit is to remodel office / lobby area into a lactation room. Approval per approved plans on file. Work to include: construction of interior non-bearing walls to convert a corner of an office and a small area of the lobby into a lactation room, replace overhead fluorescent light with a vanity style light, installation of a new sink in counter, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/14/20114/26/2011 DONE
DetailsTisha Gallop
sent by interoffice mail to Jackie Huffman (PW)
Third Notice 3/31/20113/31/2011 DONE
interoffice mail to PW (Jackie Huffman)
Third Notice 3/8/20113/17/2011 DONE
faxed
Second Notice 2/27/20113/3/2011 DONE
First Notice 2/5/20112/17/2011 DONE
Plan Reviewer's activity  1/27/2011 DONE
DetailsTim L. Woodard
Wall needed to be moved over a couple feet. Minor Plan Mod. submitted and approved. TLW
Permanent Occupancy UNPAID FEE  1/26/2011 DONE
DetailsTisha Gallop
BLD-Final1/25/20111/25/20111/25/2011PPASS
DetailsDave Hannah
Corrections made ok.
DOC - Permit Finaled  1/25/2011 DONE
BLD-Final1/21/20111/21/20111/21/2011PFAIL
DetailsBob Archibald
CN issued for counter height, 34" maximum. 5' turn radiius and 18" door pull ok.
BLD-Final1/13/20111/14/20111/17/2011AFAIL
DetailsDave Hannah
Rich Phone #: ###-#### ada needs 18 inchs on pull side of door


FIRE-Final Inspection1/13/20111/14/20111/14/2011APASS
DetailsTroy Cobbley
Fire life safety finaled per inspector 410.
BLD-Framing/Rough-in11/15/201011/16/201011/16/2010APASS
DetailsDave Hannah
Rich ###-####
Plan assigned to (TLW)10/27/2010 11/8/2010 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK10/27/2010 11/8/2010 PASS
DetailsTim L. Woodard
approved with redlines. TLW
1st review completed  11/8/2010 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  11/8/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  11/8/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  11/8/2010 DONE
DetailsTisha Gallop
Issue & PRINT to be Invoiced  11/8/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  11/8/2010 DONE
DetailsTisha Gallop
Routing - PUBLIC WORKS10/27/2010 10/28/2010 PASS
DetailsBeverly Mountain
Routing - Addressing10/28/2010 10/28/2010 PASS
DetailsTerry Records
Application received 10/27/201010/27/2010 DONE
DetailsTisha Gallop
Intake Approval  10/27/2010 PASS
DetailsCarl D Madsen
Plans ACCEPTED BY PLAN TECH  10/27/2010 DONE
DetailsTisha Gallop