First Notice | | 2/18/2011 | 2/18/2011 | | DONE |
|
|
|
|
BLD-Final | 2/7/2011 | 2/8/2011 | 2/9/2011 | P | PASS |
Jim Sly
|
|
|
junior Phone #: ###-#### OK for perm occ.
|
FIRE-Final Inspection | 2/7/2011 | 2/8/2011 | 2/8/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to provide single action hardware on the womens restroom door.
|
Permanent Occupancy UNPAID FEE | | | 2/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Other | 1/23/2011 | 1/24/2011 | 1/24/2011 | A | PASS |
Jim Sly
|
|
|
Ceiling grid inspection Phone #: ###-#### >> Inspection requested via web by Les Seal
|
BLD-Wall cover | 1/3/2011 | 1/3/2011 | 1/3/2011 | A | PASS |
Jim Sly
|
|
|
Late Morning Requested---Please call jr 30min before ###-#### Phone #: ###-#### >> Inspection requested via web by Les Seal Note.....Talked to Jr about wall South of hood.... does not match approved plan. Will need Architect to submit change to PDS for approval. Provide New "approved" changes at final insp.
|
BLD-Framing/Rough-in | 12/17/2010 | 12/17/2010 | 12/17/2010 | A | PART |
Jim Sly
|
|
|
Junior phone ###-#### 1hr wall ok
|
BLD-Framing/Rough-in | 12/16/2010 | 12/16/2010 | 12/17/2010 | P | CANC |
Jim Sly
|
|
|
Jr Phone #: ###-#### Re-sched......
|
Issue PAID IN FULL permit | | | 12/13/2010 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 12/9/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/9/2010 | | DONE |
|
|
|
|
Telephone call | | | 12/9/2010 | | DONE |
|
|
|
12-9-10 called left message for Pat permit ready and fee given Also need GC ///DLD
|
Telephone call | | | 12/8/2010 | | DONE |
|
|
|
Called Nick Rico, Lochsa Engineers concerning the required engineering analysis and design for new hoods supported by existing trusses and where the process for submittals was going. Nick said the analysis indicated the trusses would be overstressed by more than 5% and some support modifications will be required. He needs to talk with Pat McKeegan on how to proceed. I told him I had expected to receive submittals last week after our discussion of 11/30/10 and that I was going to be gone for the next three plus weeks and would like to issue the permit if possible before I leave. he said he would call Pat today.
|
Telephone call | | | 12/8/2010 | | DONE |
|
|
|
Called Pat McKeegan to discuss the delay in providing required submittals and my discussion with Nick Rico, engineer. Pat was not available so I left him a voice message. I also sent him an e-mail concerning the issue.
|
Plan Reviewer's activity | | | 12/8/2010 | | DONE |
|
|
|
Sent e-mail to Pat McKeegan concerning the delay in receiving engineering resubmittals not provided to date and my discussion with Nick Rico, Lachsa Engineering, on existing truss being overstressed with new hood additions and tha I would be gone for next three plus weeks and would like to approve the plans before I leave today if possible. Ask him to please contact Nick and provide engineering data.
|
Plan resubmittals received | | | 12/8/2010 | | |
Barbara Stitt
|
|
|
Received 2 copies of Structural calculations for hood unit addition only and taken to Dan Stuart 12-8-10 @ 4:00pm
|
Routing - PLAN CHECK | 12/8/2010 | | 12/8/2010 | | PASS |
Dan Stuart
|
|
|
Engineering analysi for added load of new hoods to existing truss' indicate no modifications required. Analysis attached to plans. Plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2010 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 10/28/2010 | | 12/8/2010 | | PASS |
Dan Stuart
|
|
|
|
Telephone call | | | 11/30/2010 | | DONE |
|
|
|
Talked with Nick Rico, Lochsa concerning engineering needs for new hood supported to existing trusses. Will review and provide required analysis and design details. He has talked with Pat McKeegan, architect.
|
Routing - PLAN CHECK | 11/26/2010 | | 11/29/2010 | | FAIL |
Dan Stuart
|
|
|
Plan resubmittals of 11/26/10 did not address engineering analysis and design data for support of new Type I Grease hood/duct system and noted in plan review item #1(f) of 11/22/10 plan review. Called and let Pat Mckeegan know the deficiency and e-mailed copy to him for response.
|
Plan resubmittals requested | | | 11/29/2010 | | DONE |
|
|
|
Plan resubmittals of 11/26/10 did not address engineering & design analysis / details for support of new hood/duct system by existing trusses. Copy of missing data requirements e-mailed to Pat McKeen and also discussed with him on phone.
|
Telephone call | | | 11/29/2010 | | DONE |
|
|
|
Called Pat McKeegan to discuss missing plan review response from him for item #1(f) of 11/22/10 plan resubmittals. He said he would contact his structural engineer and get the matter addressed and documents submitted. He is out of town.
|
Plan resubmittals received | | | 11/26/2010 | | DONE |
|
|
|
received 1 comment, 2 structural calcs,2 thermal ceramics,and 2 copies of sheets H1.0,A1.1,A1.2 taken to Dan S
|
Plan resubmittals requested | | | 11/23/2010 | | DONE |
|
|
|
Copy of re-review report for items remaining to be addressed by architect were e-mailed to pat@mckeeganarch.com.
|
Routing - PLAN CHECK | 11/17/2010 | | 11/23/2010 | | FAIL |
Dan Stuart
|
|
|
Plan resubmittals of 11/22/10 did not address item #1 of original 11/10/10 plan review. No engineering analysis data was provided.
|
Plan resubmittals received | | | 11/22/2010 | | DONE |
Tisha Gallop
|
|
|
received response letter and two copies of plan sheets A1.2, A1.1; taken to Dan Stuart
|
Route to Impact Fee Review | 11/10/2010 | 11/16/2010 | 11/18/2010 | | PASS |
Cindy M. Gould
|
|
|
Tenant impovement no impact fees
|
Routing - FIRE | 11/10/2010 | 11/10/2010 | 11/17/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 11/17/2010 | | FAIL |
|
|
|
Failed Plan Check
|
Plan resubmittals requested | | | 11/10/2010 | | DONE |
|
|
|
Copy of plan review e-mailed to architect.
|
Routing - PLAN CHECK | 11/4/2010 | | 11/10/2010 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. copy of plan review e-mailed to architect. Plans routed to fire code analyst for review.
|
Routing - PLUMBING | 11/2/2010 | | 11/4/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Plan resubmittals received | | | 11/4/2010 | | DONE |
|
|
|
received 1 letter of transmittal, 1 letter to Scott Arellano and 2 copies of sheets A-3.0,A-3.1,A-3.2,A-4.0 taken to Dan S
|
Routing - PUBLIC WORKS | 10/28/2010 | | 11/2/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 11/1/2010 | | 11/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 11/1/2010 | | 11/1/2010 | | PASS |
Walt Baumgartner
|
|
|
existing 1500 gal GI in place serves several tenants in shell&core.
|
Routing - Addressing | 10/29/2010 | | 10/29/2010 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 10/27/2010 | | 10/28/2010 | | DONE |
Jason Blais
|
|
|
|
Application received | | 10/27/2010 | 10/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 10/27/2010 | | PASS |
John Menard
|
|
|
|