Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02577
StatusFinaled
Name SYRINGA CONSTRUCTION LLC
Site Address 1708 N 7TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This structure is in WUI zone B a class A roof is required. Permit for the construction of a 2,372 sq. ft., three story (Basement 884 sq. ft., grade level 604 sq. ft., second story above grade 884 sq. ft.) single family dwelling with 3 bedrooms, 2 1/2 bathrooms, approximately 130 sq. ft. of covered patio/porch and a 440 sq. ft. detached garage per the approved plans, plan review report and any notations. R-1CD zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/10/201110/11/201110/11/2011PPASS
DetailsTony Young
Steve--Please call for access information Phone #: ###-####
DOC - Permit Finaled10/11/201110/11/201110/11/2011PPASS
DetailsTony Young
c of co issued
Zoning Approval10/10/201110/10/201110/10/2011 DONE
DetailsSarah Schafer
BLD-Final6/16/20116/16/20116/17/2011PNR
DetailsTony Young
Call for access--Steve Phone #: ###-####,, need window well ladder,, landing,, zoning
Zoning Approval6/16/20116/16/20116/16/2011 FAIL
DetailsMatthew A Halitsky
Landscaping not installed. Design changes require DR modification.
BLD-Framing/Rough-in4/7/20114/8/20114/8/2011APASS
DetailsTony Young
Steve Hanson Phone #: ###-####,, garage
BLD-Framing/Rough-in4/6/20114/6/20114/8/2011PPEND
DetailsTony Young
Steve Hanson Phone #: ###-####,, pending elec pass for garage
BLD-Framing/Rough-in4/6/20114/7/20114/7/2011PPART
DetailsTony Young
Steve Hanson Phone #: ###-####,, garage ok,, just needs electrical pass
BLD-Energy code compliance4/7/20114/7/20114/7/2011PPASS
DetailsTony Young
Steve Hanson Phone #: ###-####
BLD-Framing/Rough-in4/4/20114/5/20114/6/2011PPART
DetailsTony Young
steve Phone #: ###-####,, ok pending letter from engineer concerning exterior upper deck,, ok to insulate
BLD-Framing/Rough-in3/28/20113/29/20113/29/2011PFAIL
DetailsTony Young
Steve Hanson Phone #: ###-####,, house only.., correction notice posted,,
BLD-Footing3/15/20113/16/20113/16/2011PPART
DetailsTony Young
kevin - as early as possible please Phone #: ###-####
BLD-Footing3/16/20113/16/20113/16/2011APART
DetailsTony Young
kevin - as early as possible please Phone #: ###-####,, or late morning,, garage ftgs ok
BLD-Foundation2/3/20112/4/20112/4/2011APART
DetailsTony Young
Kevin Phone #: ###-####,, basement wall ok
BLD-Footing1/31/20112/1/20112/2/2011PPART
DetailsTony Young
kevin Phone #: ###-####,, work in progress on basement footings,, will have garage and other footings later
Issue PAID IN FULL permit  1/24/2011 DONE
DetailsTisha Gallop
Permit Ready to Issue  12/17/2010 DONE
Telephone call  12/17/2010 DONE
12-17-10 called Steve left message permit ready and fee given ///dld
Plan assigned to (CDM)10/27/201010/27/201012/16/2010 PASS
DetailsCarl D Madsen
Case Summary (BLD)  12/16/2010 DONE
Routing - PLAN CHECK12/16/2010 12/16/2010 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  12/16/2010  
Inspection Record Card- Bld  12/16/2010 DONE
Plan resubmittals received  12/14/2010  
received 2 structural calcs,and 2 copies of sheets A2-3,A4.2 sent to Carl M
Route to Impact Fee Review10/27/201011/1/201011/24/2010 PASS
DetailsCindy M. Gould
credit for SFD demolished under Bld10-02289
Plan resubmittals received  11/22/2010  
DetailsBarbara Stitt
Received 3 copies of sheets A2-3, A4-2 and taken to Carl Madesn
Routing - PLAN CHECK11/18/2010 11/19/2010 FAIL
DetailsCarl D Madsen
1st review completed  11/19/2010 FAIL
More information is required on the rear Balcony Called and left a mesrage with the Architect and talked to Glenda with Isley development requesting the balcony design. 11-19-10 CDM
Routing - PLAN CHECK11/4/2010 11/19/2010 FAIL
DetailsCarl D Madsen
Routing - PLANNING11/15/2010 11/18/2010 PASS
DetailsMatthew A Halitsky
Plan resubmittals received  11/10/2010  
DetailsBarbara Stitt
Received 3 copies of sheet A3-1 and taken to Carl Madsen on 11-10-10 @ 4:40pm
Routing - PLANNING10/28/2010 11/4/2010 FAIL
DetailsMatthew A Halitsky
A consistent window muntin pattern was required by the HPC.
Application received 10/27/201010/28/2010 DONE
DetailsTisha Gallop
Routing - Addressing10/28/2010 10/28/2010 PASS
DetailsTerry Records
Routing - PUBLIC WORKS  10/28/2010 PASS
Intake Approval  10/27/2010 PASS
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  10/27/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/27/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK11/23/2010   FAIL
Engineering is required on the second story balcony. Called and left a message with Tom Whitworth requesting the additional information. 11-21-10 CDM