Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD10-02597
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 11311 W CHINDEN BLVD
Project NameHewlett-Packard(Smoking Shelte
Customer Number 
ePlanReviewNo
Description
Hewlett - Packard (Pedesrtrian Walkway Extension Smoking Shelter) - To construct approximately an 18' x 18' x 9', noncombustible, structural steel extension to the east side of the existing pedestrian walkway to act as a covered smokers shelter per reviewed plans and structural engineered design & details. Work includes a new 5 ' x 5' x 1' reinforced concrete pad; new 6' x 6' x 1/4" steel column W/ 12" x 12" x 1" base plate and (4) 3/4" x minimum 9" embed anchor bolts; (5) 6" x 6" x 1/4" perimeter beams plus center beam running E / W with (4) 4' x 4' x 1/4" HSS cross beams running N / S; structural steel decking with special inspection of welding, bolting & concrete per attached Project Start Up for Special Inspection form and structural sheets. As an extension of the existing noncombustible pedestrian walkway between Buildings #4 & #8, with sides open more than 50%, the walkway is not required to be sprinklered or have elements of fire-resitive construction. CZC10-00215 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/28/20113/31/2011 DONE
DetailsBarbara Stitt
First Notice3/14/20113/14/20113/18/2011 DONE
DetailsJim Sly
BLD-Final3/10/20113/14/20113/14/2011PPASS
DetailsJim Sly
wes Phone #: ###-####
DOC - Permit Finaled3/14/20113/14/20113/14/2011PPASS
DetailsJim Sly
Issue PAID IN FULL permit  1/28/2011 DONE
Plan assigned to (DRS)11/1/2010 12/8/2010 PASS
DetailsDan Stuart
Routing - PLAN CHECK12/7/2010 12/8/2010 PEND
DetailsDan Stuart
Received required copies of ESC Application to accompancy waiver request letter of 12/6/10. routing plans back to ESC for re-review.
Routing - Erosion and Sediment12/8/2010 12/8/2010 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC permit conditions. ESC10-00887
Routing - PLAN CHECK12/8/2010 12/8/2010 PASS
DetailsDan Stuart
ESC Waiver request approved by Steve Webb. Person on ESCapplication as RP is not certified. Sent e-mail notification to Sam Burrows.Plans to permit desk for issue.
Plan Reviewer's activity  12/8/2010 DONE
Sent e-mail to Sam Burrows telling him a certified RP was required.
PLANS/APPL TAKEN TO FRONT DESK  12/8/2010 PASS
Inspection Record Card- Bld  12/8/2010 DONE
Permit Ready to Issue  12/8/2010 DONE
Telephone call  12/8/2010 DONE
12-8-10 called Sam Burrows permit ready and fee given ///dld
Plan resubmittals received  12/7/2010 DONE
DetailsTisha Gallop
received two coipes of ESC application; taken to Dan Stuart
Telephone call  12/6/2010 DONE
ESC waiver request letter was dropped off but an application was not. Left Sam Burrows a voice message indicating need for application for ESC.
Plan resubmittals received  12/6/2010 DONE
DetailsTisha Gallop
received one copy Waiver Request Letter for ESC; taken to Dan Stuart.
Telephone call  12/3/2010 DONE
Plan failed ESC 11/3/10. Have not been notified of submittal of application and waiver request letter submittal. Left message for Sam Burrows to please provide.
Routing - PLAN CHECK11/26/2010 12/3/2010 PASS
DetailsDan Stuart
Received completed Special Inspection form minus the designated Special Inspection Agency. Contractor, tenant, owner, architect to provide data for selected special inspector to Structural Building Inspector for approval at job site.
Plan resubmittals received  12/3/2010  
DetailsDan Stuart
Received a cover transmittal, 2 copies of plan review comments and 2 copies of Project Start up for Special Inspections and taken to Dan Stuart
Routing - FIRE11/24/2010 11/26/2010 PASS
DetailsScott Arellano
*Change to type of construction and deletion of sprinkler system requirement from plans. No Sprinkler or Alarm requirements.
Routing - PLAN CHECK11/18/2010 11/24/2010 FAIL
DetailsDan Stuart
Resubmittals incompleted. Project Start Up For Special Inspection Form was not provided.Called and left message for Sam and e-mailed him 2nd copy of plan review with item PR #2 still needing to be addressed. routing back to fire code analyst to address sprinkler system and construction type changes made to plans.
Plan resubmittals received  11/24/2010 DONE
received 1 transmittal, and 2 copies of sheets 0.0,S0.01,S1.01,S4.01,S5.02,S5.03 sent to Dan S.
Plan resubmittals received  11/24/2010 DONE
Received two new complete sets of plans from Sam Burrows. The required Project Start Up For Special Inspection form was not submitted with new plan sheets. Called Sam and left phone message this document is still required.
Telephone call  11/24/2010 DONE
Called for Sam Burrows to discuss missing Project Start Up For Special Inspection form not provided with plan sheet resubs as required in 11/15/10 plan review. Sam was out of the office. I left voice message on phone.
Meeting  11/22/2010 DONE
Met with Sam Burrows to discuss re-classifying the smoke shelter as an expansion to the existing pedestrian walkway. This would change construction type to IIB and not require fire-resistive construction or sprinkler system. I had reviewed this approach with Scott Arellano before setting up meeting with Sam Burrows. Scott thought that would be the correct way to review this project. Sam to provide changes on plan resubmittals and show compliance with pedestrian walkway width of maximum 30' per code for pedestrian walkways. None of the sides are enclosed.
Route to Impact Fee Review11/16/201011/19/201011/18/2010 PASS
DetailsCindy M. Gould
Not enclosed no impact fees
Routing - FIRE11/16/201011/16/201011/18/2010 PASS
DetailsScott Arellano
No seperate Fire Comments attached.
1st review completed  11/18/2010 FAIL
Failed Erosion & Soil Control, Plan Check
Routing - PLAN CHECK11/15/2010 11/16/2010 FAIL
DetailsDan Stuart
Routing to fire code analyst for review.
Telephone call  11/15/2010 DONE
Called to talk with Sam Burrows. He is out of office so I left a voice message to call me.
Plan resubmittals requested  11/15/2010 DONE
Copy of plan review e-mailed to architect, Sam Burrows for response.
Routing - PLAN CHECK11/8/2010 11/15/2010 FAIL
DetailsDan Stuart
Resubmittals required. copy of plan review e-mailed to architect for response. Plans routed to Planning and then to fire code analyst.
Routing - PLANNING11/15/2003 11/15/2010 PASS
DetailsAndrea Tuning
CZC10-00215 Andrea Tuning
Routing - PLUMBING11/3/2010 11/8/2010 PASS
DetailsBill VanDegrift
no plumbing
Routing - PUBLIC WORKS11/2/2010 11/3/2010 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment11/3/2010 11/3/2010 FAIL
DetailsSteven Webb
No ESC plan or waiver request was included in the documents. This scope of work is not currently exempt from needing an ESC Permit. ESC application and plan waiver request letter along with a certified Responsible Person is needed.
Routing PW Sewer Rating11/2/2010 11/2/2010 PASS
DetailsConnie Baumgartner
Routing PW Drainage11/2/2010 11/2/2010 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div11/1/2010 11/2/2010 PASS
DetailsTodd Tucker
Routing - Addressing  11/2/2010 PASS
DetailsTerry Records
Application received 11/1/201011/1/2010 DONE
DetailsBarbara Stitt
Pending Assignment by JCM11/1/2010 11/1/2010 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  11/1/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  11/1/2010 DONE
DetailsBarbara Stitt