BLD-Final | 8/2/2012 | 8/3/2012 | 8/3/2012 | A | PASS |
Jim Sly
|
|
|
Jamie Phone #: ###-####
|
DOC - Permit Finaled | 8/3/2012 | 8/3/2012 | 8/3/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 4/19/2011 | 4/19/2011 | 4/20/2011 | P | PASS |
Tony Young
|
|
|
Jamie Phone #: ###-####
|
BLD-Framing/Rough-in | 2/3/2011 | 2/4/2011 | 2/4/2011 | A | NR |
Tony Young
|
|
|
jamie Phone #: ###-####,, frame conf only,,, need plumbing and mech permits,,, ok to insulate exterior wall
|
Routing Walk-In (BLD) | 12/15/2010 | 12/15/2010 | 12/15/2010 | P | DONE |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/15/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/15/2010 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/15/2010 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 12/15/2010 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/14/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/13/2010 | | DONE |
Tisha Gallop
|
|
|
tt Greg w/Edenbrook he mistakenly walked out with plans after Perry approved. He said will be in asap to pay for permit so can be issued.
|
Routing Walk-In (Zoning) | 11/1/2010 | 11/1/2010 | 11/1/2010 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 11/1/2010 | 11/1/2010 | 11/1/2010 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 11/1/2010 | 11/1/2010 | 11/1/2010 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 11/1/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2010 | | |
|
|
|
|
1st review completed | | | 11/1/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2010 | | DONE |
|
|
|
|
Application received | | 11/1/2010 | | | |
|
|
|
|