Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD10-02635
StatusFinaled
Name VERTICAL CORP
Site Address 416 S 8TH ST
Project NameDRAKE COOPER BLDG
Customer Number 
ePlanReviewNo
Description
(DRAKE COOPER BUILDING - CORE REMODEL) This building is fire sprinklered for code trade-offs. To remodel the building core at the 8th Street entrance and in the basement. Work is to include a new stairway to the basement, a 3 stop wheelchair lift with 90 degree side exit/entrance, and a 1-hr fire-resistance-rated separation between the basement and the non-rated lobby on the 1st story. The non-rated lobby on the 1st story, in part, functions as the continuation of an existing stairway enclosure (enclosed like a 1-hr corridor) that serves the 2nd story. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Fire sprinkler heads in the basement and on the 1st story will be replaced with quick-response heads. Tenant improvement work for “SunErgy” on the 1st story was done under permit BLD10-02758, tenant improvement work for “RDG Filings” on the 1st story was done under permit BLD10-02759, and tenant improvement work for “IntelliScience” in the basement was done under permit BLD10-02760. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice3/13/20133/13/20133/22/2013 DONE
DetailsDave Hannah
BLD-Aging Inspection3/11/20133/11/20133/13/2013 PASS
DetailsDave Hannah
DOC - Permit Finaled3/13/20133/13/20133/13/2013APASS
DetailsDave Hannah
BLD-Final7/7/20117/8/20117/8/2011APASS
DetailsJim Sly
Todd-Please call prior to inspection Phone #: ###-####
OK for Perm Occ.
BLD-Aging Inspection4/26/20114/26/20114/26/2011 PASS
DetailsDave Hannah
BLD-Final2/23/20112/24/20112/24/2011ANR
DetailsDave Hannah
call when on way//Jerry Phone #: ###-####
FIRE-Final Inspection2/22/20112/22/20112/23/2011PPASS
DetailsForrest France
Jerry Phone #: ###-####
Routing - FIRE12/8/201012/8/201012/14/2010 PASS
DetailsScott Arellano
Plans approved with red lined comments on plans and plan review comments attached to building plan set.
Plan assigned to (CJW)11/5/2010 12/14/2010 PASS
DetailsCarl Westfall
1st review completed  12/14/2010 PASS
Routing - PLAN CHECK12/14/2010 12/14/2010 DONE
DetailsCarl Westfall
Took drawings to the permits desk.
PLANS/APPL TAKEN TO FRONT DESK  12/14/2010 DONE
Inspection Record Card- Bld  12/14/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  12/14/2010  
Issue PAID IN FULL permit  12/14/2010 DONE
DetailsChristina Prado
Route to Impact Fee Review12/8/201012/13/201012/9/2010 PASS
DetailsCindy M. Gould
Remodel existing building no impact fees
Routing - PLAN CHECK12/7/2010 12/8/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Routing - PUBLIC WORKS11/30/2010 12/7/2010  
Need addresses for TIs
Plan resubmittals received  12/2/2010 DONE
received 1 transmittal and 2 copies of sheets A0.01,A0.02,A0.03,A2.00,A2.01,A2.10,A2.11,A5.11 taken to Carl Westfall
Routing - PLAN CHECK11/8/2010 11/30/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on November 15, 2010 and finished on November 29, 2010. Revised drawings were required. See the plan review report.
Plan resubmittals received  11/23/2010  
DetailsBarbara Stitt
Recieved 2 copies of sheets A1.00, A2.01, A2.10, 2.11 and 3 applications to split out TI's for IntelliScience, RDG Filings, SunErgy taken to Carl Westfall
Routing - PUBLIC WORKS11/5/2010 11/8/2010 PASS
DetailsBeverly Mountain
Plans ACCEPTED BY PLAN TECH  11/5/2010 DONE
11-4-10 ok per Tim W for level 3 intake
Pending Assignment by JCB11/5/2010 11/5/2010 DONE
DetailsJason Blais
Application received 11/4/2010