BLD-Final | 1/5/2011 | 1/6/2011 | 1/6/2011 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 1/6/2011 | 1/6/2011 | 1/6/2011 | P | PASS |
Mike Jordan
|
|
|
Smoke detectors were repaired. Letter of compliance was issued.
|
BLD-Final | 12/29/2010 | 12/29/2010 | 12/29/2010 | P | FAIL |
Mike Jordan
|
|
|
John Phone #: ###-####. Smoke detectors not interconnected.
|
BLD-Framing/Rough-in | 11/24/2010 | 11/26/2010 | 11/26/2010 | P | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
Routing Walk-In (Zoning) | 11/5/2010 | 11/5/2010 | 11/5/2010 | A | PASS |
Bruce Eggleston
|
|
|
|
Routing Walk-In (BLD) | 11/5/2010 | 11/5/2010 | 11/5/2010 | A | FAIL |
Carl D Madsen
|
|
|
Floorplan is required
|
Routing Walk-In (BLD) | 11/5/2010 | 11/5/2010 | 11/5/2010 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 11/5/2010 | 11/5/2010 | 11/5/2010 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 11/5/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/5/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2010 | | |
|
|
|
|
Application received | | 11/5/2010 | | | |
|
|
|
|