Third Follow up | | | 1/5/2012 | | DONE |
Tisha Gallop
|
|
|
put hold on Idaho Lifestyle Builders until receive final cert of value for Bld10-02263 & Bld10-02661.
|
Third Notice | | 11/27/2011 | 12/7/2011 | | DONE |
|
|
|
mailed to Ryan Colson
|
Third Notice | | 10/14/2011 | 11/7/2011 | | DONE |
|
|
|
mailed to GC
|
Third Notice | | 8/30/2011 | 9/29/2011 | | DONE |
|
|
|
mailed to GC
|
Second Notice | | 8/12/2011 | 8/25/2011 | | DONE |
Christina Prado
|
|
|
Mailed 8-25-11
|
First Notice | | 7/25/2011 | 8/2/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/15/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PASS |
Mike Jordan
|
|
|
ok for perm occ. Bond has been posted.
|
BLD-Final | 4/6/2011 | 4/7/2011 | 4/7/2011 | A | NH |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. No one at jobsite, no call back, no access.
|
Zoning Approval Temp | 4/7/2011 | 4/7/2011 | 4/7/2011 | | PASS |
Sarah Schafer
|
|
|
Temporary approval until exterior improvements completed.
|
BLD-Final | 3/28/2011 | 3/28/2011 | 3/28/2011 | P | FAIL |
Mike Jordan
|
|
|
Ryan-Please call prior to inspection Phone #: ###-####. Needs zoning sign off or post bond. Provide vertical grab bars in restrooms also provide the mirros in restroom. Install handrails for stairs and ramp at west side of building.
|
FIRE-Final Inspection | 3/24/2011 | 3/25/2011 | 3/25/2011 | A | PASS |
Forrest France
|
|
|
Reinspection passed, C/N items are complete. Manual thumbturns have been removed.
|
FIRE-Final Inspection | 3/24/2011 | 3/24/2011 | 3/24/2011 | P | FAIL |
Forrest France
|
|
|
Missing premise identification, remove manual thumbturns at two locations including the main entry/exit.
|
BLD-Framing/Rough-in | 2/18/2011 | 2/18/2011 | 2/18/2011 | P | PASS |
Jim Sly
|
|
|
follow up//call when on way --Ryan Phone #: ###-#### Header above N. door ......and micro installed to 3 ply truss OK per Eng.....
|
BLD-Framing/Rough-in | 2/11/2011 | 2/14/2011 | 2/14/2011 | A | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. ok to rock.
|
BLD-Framing/Rough-in | 2/11/2011 | 2/11/2011 | 2/14/2011 | P | PART |
Mike Jordan
|
|
|
late pm please//Ryan Phone #: ###-####. ok to insulated. Pending electrical rough in. Also needs to provide header calc for three ply girder and provide straps on top plates and noted locations.
|
BLD-Footing | 11/29/2010 | 11/30/2010 | 11/30/2010 | A | PASS |
Mike Jordan
|
|
|
nate - first thing in the morning if possible please Phone #: ###-####
|
Plan assigned to (SRZ) | 11/9/2010 | 11/9/2010 | 11/19/2010 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 11/19/2010 | | 11/19/2010 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 11/19/2010 | | 11/19/2010 | | PASS |
Beverly Mountain
|
|
|
Added service sink in front office tenant.
|
Case Summary (BLD) | | | 11/19/2010 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 11/19/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2010 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 11/19/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/19/2010 | | DONE |
Tisha Gallop
|
|
|
called Ryan Colson ###-#### and told him permit is ready and fees, and need ACHD
|
Print Occupancy Form | | | 11/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 11/19/2010 | | DONE |
Tisha Gallop
|
|
|
received revised application adding tenant "T & R Ventures" to permit
|
Issue PAID IN FULL permit | | | 11/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Design Review | 11/18/2010 | | 11/18/2010 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 11/18/2010 | | 11/18/2010 | | PASS |
Tim Frost
|
|
|
|
Routing - PLAN CHECK | | | 11/18/2010 | | FAIL |
Sam Zahorka
|
|
|
Still needs a service sink. Called the applicant and left a message. Waiting for him to return my call.
|
Routing - Erosion and Sediment | 11/10/2010 | | 11/15/2010 | | PASS |
Steven Webb
|
|
|
Use the same ESC permit for both T.I.'s
|
Case Summary (BLD) | | | 11/12/2010 | | |
|
|
|
|
Routing - Addressing | 11/10/2010 | | 11/10/2010 | | PASS |
Terry Records
|
|
|
Correct address is 1122 S. Five Mile Not 1120
|
Routing PW Sewer Rating | 11/10/2010 | | 11/10/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 11/10/2010 | | 11/10/2010 | | PASS |
Beverly Mountain
|
|
|
**RESUBMITTALS SPLIT BUILDING INTO TWO T.I.'S WITH ADDITIONAL FIXTURES - RE-ROUTE TO ALL DEPARTMENTS.** Plan corrections recieved. Corrections effect all departments. Started routing process again.
NEW ADDRESS?
|
Application received | | 11/9/2010 | 11/9/2010 | | DONE |
Tisha Gallop
|
|
|
permit and value split out from Bld10-02263
|
Intake Approval | | | 11/9/2010 | | PASS |
Tisha Gallop
|
|
|
Initial plan intake done with Bld10-02263.
|
Plans ACCEPTED BY PLAN TECH | | | 11/9/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/9/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 11/9/2010 | | 11/9/2010 | | PEND |
Sam Zahorka
|
|
|
Plan corrections recieved. Corrections effect all departments. Started routing process again.
|