Permit Information
Permit NumberBLD10-02666
StatusFinaled
Name TK CONSTRUCTION
Site Address 5900 W FAIRVIEW AVE
Project NameThe Original Pancake House
Customer Number 
ePlanReviewNo
Description
(THE ORIGINAL PANCAKE HOUSE) (11-14-11 PLAN MODIFICATION TO CHANGE THE WIDTH OF THE EAST VEHICULAR DRIVEWAY AT FAIRVIEW AVENUE AND TO RELOCATE THE DUMPSTER ENCLOSURE.) Fire sprinklers used for fire area. To remodel an existing 3,155 square foot restaurant building for a new restaurant tenant. Work is to include 2 restrooms accessible to the disabled, 2 grease hoods, 3 steam hoods, interior nonbearing walls, exterior walls, exterior windows, exterior doors, kitchen equipment, millwork, and finishes. Structural work includes a concrete footing, steel columns, expansion anchors, beams, roof joists, shear walls, and hold downs with epoxy anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/6/20123/7/2012 DONE
This permit finaled on the web by Todd Kurns
Second Notice 2/27/20123/1/2012 DONE
First Notice 2/13/20122/17/2012 DONE
Permanent Occupancy  2/3/2012 DONE
DetailsTisha Gallop
BLD-Final1/30/20122/1/20122/1/2012APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Todd Kurns
BLD-Final1/30/20121/31/20121/30/2012ACANC
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Todd Kurns Inspection cancelled from web by: Todd Kurns
BLD-Wall cover1/23/20121/23/20121/24/2012PDONE
DetailsTom Arcoraci
FIRE-Final Inspection1/6/20121/9/20121/9/2012APASS
DetailsTroy Cobbley
life safety passed.
FIRE-Alarm Testing1/6/20121/9/20121/9/2012APASS
DetailsTroy Cobbley
Fire alarm testing is complete.
FIRE-Alarm Testing1/5/20121/6/20121/6/2012ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Todd Kurns Inspection cancelled from web by: Todd Kurns
FIRE-Final Inspection1/5/20121/6/20121/6/2012ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Todd Kurns Inspection cancelled from web by: Todd Kurns
Zoning Approval12/8/201112/8/201112/8/2011 DONE
DetailsAndrea Tuning
BLD-Other11/17/201111/17/201111/17/2011APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Todd Kurns
OVERRIDE  11/15/2011  
CHANGE STATUS TO (ISS)  11/15/2011 DONE
DetailsChristina Prado
Print Occupancy Form  11/15/2011 DONE
DetailsBarbara Stitt
Telephone call  11/15/2011 DONE
t/c w gene - permit (plan mod) ready and fees given
Permit Ready to Issue  11/15/2011 DONE
Details
Plan assigned to (CJW)11/8/201111/8/201111/14/2011 PASS
DetailsCarl Westfall
THE ORIGINAL PANCAKE HOUSE - PLAN MOD
Routing - PUBLIC WORKS11/9/2011 11/14/2011 PASS
DetailsConnie Baumgartner
Relocated dumpster
Routing PW Solid Waste11/9/2011 11/14/2011 PASS
DetailsPeter J. McCullough
12' X 15' enclosure; exact location must be verified with Allied as noted on plans.
Routing - PLAN CHECK11/14/2011 11/14/2011 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  11/14/2011 DONE
Routing - PLAN CHECK11/8/2011 11/9/2011 PASS
DetailsCarl Westfall
Inserted modified plans. Started routing.
Routing - PLANNING11/9/2011 11/9/2011 PASS
DetailsAndrea Tuning
Plan Modification Accepted  11/8/2011  
DetailsBarbara Stitt
Plan modification acceted for the front entry off Fairveiw on side of buiding to be modified due to easment requirment. Submited pages SD1.0 & C1.1 with no change in value.
FIRE-Conference9/30/201110/3/201110/3/2011ADONE
DetailsTroy Cobbley
The insulation filling the combustible concealed spaces has been verified.
FIRE-Conference9/30/20119/30/20119/30/2011PDONE
DetailsTroy Cobbley
Spoke to the insulation contractor about providing the necessary access points to verify that the combustible concealed spaced are completely filled with noncombustible insulation.
BLD-Framing/Rough-in9/27/20119/28/20119/28/2011APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Todd Kurns
FIRE-Conference9/26/20119/27/20119/27/2011ADONE
DetailsTroy Cobbley
I discussed the installation of insulation in the combustible concealed spaces with the insulation contractor.
FIRE-Conference9/21/20119/21/20119/21/2011ADONE
DetailsTroy Cobbley
The flat roof area over the seating area can have the sheet rock applied to the bottom of the trusses. The truss spaces have been filled with non combustible insulation.
FIRE-Conference9/12/20119/12/20119/12/2011PDONE
DetailsTroy Cobbley
Discussed covering of the insulation with Todd
BLD-Footing8/12/20118/12/20118/12/2011PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in8/4/20118/5/20118/5/2011APART
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Todd Kurns ext ok for cover
Issue PAID IN FULL permit  7/11/2011 DONE
(F) Reprint permit  7/11/2011 DONE
DetailsChristina Prado
Extend Review Timeline  5/27/2011 DONE
Telephone call  5/26/2011 DONE
t/c w Gene - he said he received an email from Rome Acopan that he had applied for an extension - I told Gene that I would check with Jason Blais to confirm this
Telephone call  5/24/2011 DONE
t/c w gene - let him know that the permit is going to expire on the 28th if an extension is not requested - he said he would send an email requesting an extension today.
Expiration Notice5/17/20116/8/20115/17/2011 DONE
DetailsPatricia Smith
sent expiration notice per jason blais
Routing - PLAN CHECK4/29/2011 5/16/2011 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
PLANS/APPL TAKEN TO FRONT DESK  5/16/2011 DONE
Print Occupancy Form  5/16/2011 DONE
Permit Ready to Issue  5/16/2011 DONE
DetailsTisha Gallop
Telephone call  5/16/2011 DONE
DetailsTisha Gallop
called Gene Ulmer and told him that permit is ready and fees.
Plan assigned to (CJW)11/30/2010 5/16/2011 PASS
DetailsCarl Westfall
1st review done
Plan resubmittals received  5/6/2011 DONE
DetailsTisha Gallop
received two copies of structural calcs and plan sheets S0.0, S1.0, S1.1, S2.0, S2.1, S2.2; taken to Carl Westfall
Routing - FIRE4/28/2011 4/29/2011 PASS
DetailsScott Arellano
Attached revised IFC comments to plans. Final approval will be subject to satisfactory field inspection by the PDS Fire inspector.
Routing - PLAN CHECK1/3/2011 4/28/2011 FAIL
DetailsCarl Westfall
Completed the 2nd review. Some structural issues not resolved.
Plan resubmittals received  4/22/2011 DONE
DetailsChristina Prado
Received two copies of Structural Cals; two copies of Structural Cals-Addendum; one copy of ACHD letter; two copies of plans A0.1, SD1.0, C1.1, A1.0, A1.1, A1.2, A1.3, A1.4, A2.0, A3.0, A4.0, A5.0, A6.0, S0.0, S1.0, S1.1, S2.0, S2.1, M-1, M-2, M-3, M-4, P-1, P-2, P-3, E-1, E-2, E-3, and E-4. Routed to Carl Westfall for review
Routing - FIRE12/22/201012/22/20101/3/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  1/3/2011 FAIL
Failed Plan Check, Fire
Route to Impact Fee Review12/22/201012/28/201012/27/2010 PASS
DetailsCindy M. Gould
TENANT IMPROVEMENT NO IMPACT FEES
Routing - PLAN CHECK12/8/2010 12/22/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on December 14, 2010 and was finished on December 22, 2010. Revised drawings were required. See the plan review report.
Routing - PLANNING12/8/2010 12/8/2010 PASS
DetailsAndrea Tuning
Routing - PLUMBING12/7/2010 12/8/2010 PASS
DetailsBill VanDegrift
provide floor drains in the restrooms. additional cross connection protection will be required on equipment, and upstream of any filter systems.
Routing - Erosion and Sediment12/6/2010 12/7/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00878. Need valid RP prior to issuance of permits.
Routing - PUBLIC WORKS12/2/2010 12/6/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating12/6/2010 12/6/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing12/3/2010 12/3/2010 PASS
DetailsTerry Records
Intake Approval  12/2/2010 PASS
DetailsJason Blais
Pending Assignment by JCB11/29/2010 11/30/2010 DONE
DetailsJason Blais
Plan Reviewer's activity  11/30/2010 DONE
DetailsJason Blais
Called architect and emailed ESC documents needing to be filled out and returned. Architect stated he would complete and provide next day.
Intake Approval  11/30/2010 FAIL
DetailsJason Blais
Needs ESC Application and Plan Waiver Letter to be submitted. Called architect to let know and emailed documents.
Plans ACCEPTED BY PLAN TECH  11/29/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  11/29/2010 DONE
DetailsBarbara Stitt
Application received 11/9/201011/9/2010 DONE
DetailsTisha Gallop
Intake Approval  11/9/2010 FAIL
DetailsDan Stuart
Copy of failed plan intake checklist attached to permit.