Second Notice | | 10/30/2011 | 11/7/2011 | | DONE |
Christina Prado
|
|
|
faxed 11-7-11
|
First Notice | 10/11/2011 | 10/11/2011 | 10/20/2011 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 10/7/2011 | 10/10/2011 | 10/11/2011 | A | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
DOC - Permit Finaled | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 4/21/2011 | 4/21/2011 | 4/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 4/20/2011 | 4/20/2011 | 4/21/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/20/2011 | 4/20/2011 | 4/20/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 2/17/2011 | 2/18/2011 | 2/18/2011 | A | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-#### pend mti
|
BLD-Footing | 2/17/2011 | 2/18/2011 | 2/18/2011 | A | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-#### pend mti
|
BLD-Footing | 2/9/2011 | 2/10/2011 | 2/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
MIKE Phone #: ###-#### pending mti
|
BLD-Footing | 1/28/2011 | 1/31/2011 | 1/31/2011 | A | PART |
Tom Arcoraci
|
|
|
Mike Phone #: ###-#### mti on site wip ok
|
Plan assigned to (JCM) | 11/10/2010 | | 1/28/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 1/27/2011 | | 1/28/2011 | | PASS |
John Menard
|
|
|
Plans Routed to John per RMH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2011 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2011 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 1/28/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 1/28/2011 | | DONE |
Christina Prado
|
|
|
Called and left message for Tammy to pick up. Advised on fees and ACHD requirements prior to issue
|
Telephone call | | | 1/28/2011 | | DONE |
Christina Prado
|
|
|
Called Tammy to pick up. Per Ron Hill ok to pick up without ACHD letter. Achd fees will be paid with building permit for Stein Dist.
|
Telephone call | | | 1/28/2011 | | |
|
|
|
I called and talked to Jeanie at ACHD, She indicated that it would be up to Boise City if we wanted to issued the permit, The Fee's and conditions of approval will be collected and performed under the Shell and Core permit that is still under review. RMH 1-28-11
|
Issue PAID IN FULL permit | | | 1/28/2011 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 1/27/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of SD1.1; taken by Roberta Kerr
|
Plan resubmittals received | | | 1/26/2011 | | DONE |
Tisha Gallop
|
|
|
receceived four copies of plan sheet S6.03; taken by Roberta Kerr.
|
Routing - Design Review | 1/26/2011 | | 1/26/2011 | | PASS |
Andrea Tuning
|
|
|
This approval is for the foundation of the building only. A number of the plans included in the building package do not match the approved site plan and landscape plan in regard to landscape planters and parking areas.and are not approved as overall site plans. Andrea Tuning
|
Routing - PLAN CHECK | 11/26/2010 | | 1/26/2011 | | PEND |
Jason Blais
|
|
|
Plans routed to Planning.
|
Plan Reviewer's activity | | | 1/25/2011 | | DONE |
|
|
|
Structural approval based on detail e-mailed directly to outsource structural reviewer. Permit can't be issued until we receive 4 copies of the revised sheet 6.03 (footing detail 2). John Menard e-mailed Jarod at Lochsaw and let him know.
|
Routing Off Site - STRUCTURAL | 1/18/2011 | | 1/24/2011 | | PASS |
John Menard
|
|
|
Received letter from consulting structural engineer approving final requested revisions. JCM
|
Routing - PLANNING | 1/24/2011 | | 1/24/2011 | | PASS |
Joshua Johnson
|
|
|
|
Telephone call | | | 1/18/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up.
|
Plan resubmittals received | | | 1/13/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of structural response and calculations and two copies of plans sheets S6.02, S6.03; inserted by Penelope Dennis and taken back to John Menard.
|
Plan resubmittals requested | | | 1/6/2011 | | DONE |
John Menard
|
|
|
E-mailed the applicant a copy of the second structural review comment list requesting additional revisions. JCM
|
Routing Off Site - STRUCTURAL | 12/21/2010 | | 1/5/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions.
|
Plan resubmittals received | | | 12/21/2010 | | DONE |
Tisha Gallop
|
|
|
received one copy of Geotech report, three copies of structural response and structural calcs, three copies of plan sheets S0.01, S6.01, S6.02, S6.03; taken to Ron Hill.
|
Telephone call | | | 12/21/2010 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals requested | | | 12/10/2010 | | DONE |
John Menard
|
|
|
E-mailed the applicant a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 11/15/2010 | | 12/10/2010 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - FIRE | 11/23/2010 | 11/23/2010 | 11/26/2010 | | PASS |
Scott Arellano
|
|
|
No seperate comments attached.
|
Routing - Design Review | 11/17/2010 | | 11/26/2010 | | FAIL |
Andrea Tuning
|
|
|
The applicant must either have Luch Street vacated or provide teh 20-foot street side setback that is required from Lauch Street. This was identified as a finding of fact and a site specific condition of approval in the Design Review approval.
DRH10-00223 Andrea Tuning, CVA10-00028 Josh Johnson
|
1st review completed | | | 11/26/2010 | | FAIL |
|
|
|
Failed Public Works, Erosion & Soil Control, Planning
|
Route to Impact Fee Review | 11/23/2010 | 11/29/2010 | 11/24/2010 | | PASS |
Cindy M. Gould
|
|
|
footings and foundation only building permit has not been applied for. Will put impact fees on building permit.
|
Routing - PLAN CHECK | 11/18/2010 | | 11/23/2010 | | PASS |
John Menard
|
|
|
John Menard
|
Routing - Erosion and Sediment | 11/19/2010 | | 11/19/2010 | | PASS |
Steven Webb
|
|
|
ESC "Master Plan" submitted to Boise City on November 18, 2010 is approved of scope of work beyond the demo portion of the project. Approved plan (ESC/SWPPP) is required to be on site during the project. Kent Olsen (CON04-00484) is the certified Responsible Person. As well ESC permit attached conditions are expected to be followed during construction.
|
Plan resubmittals received | | | 11/18/2010 | | |
|
|
|
ESC Narrative resubmitted, Ron Hill delivered to Steve Webb
|
Routing PW Drainage | 11/16/2010 | | 11/17/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 11/17/2010 | | 11/17/2010 | | FAIL |
Joshua Johnson
|
|
|
The applicant must either have Lauch Street vacated or provide the 20-foot street side setback that is required from Lauch Street. This was identified as a finding of fact and a site specific condition of approval in the Design Review approval.
DRH10-00223 Andrea Tuning, CVA10-00028 Josh Johnson
|
Routing - PUBLIC WORKS | 11/15/2010 | | 11/17/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 11/17/2010 | | 11/17/2010 | | FAIL |
Steven Webb
|
|
|
reference ESC10-00814: ESC plan approved under ESC10-00814 does not include re-building portion of this project. I had informed the PD (T. Arnold) in October 2010 that this plan does not meet the requirements of BCC 8-17 for the re-building of the project. I also informed P. Dennis of McAlvain Design Build that another plan or at least an addendum to the prior approved plan/narrative will be needed. This project requires coverage under the Federal Construction General Permit.
|
Routing PW Sewer Rating | 11/16/2010 | | 11/16/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Telephone call | | | 11/15/2010 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - Addressing | 11/15/2010 | | 11/15/2010 | | PASS |
Terry Records
|
|
|
|
Application received | | 11/10/2010 | 11/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/10/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/10/2010 | | DONE |
Tisha Gallop
|
|
|
|