Permit Information
Permit NumberBLD10-02676
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 601 N PHILLIPPI ST
Project NameSTEIN DISTRIBUTING
Customer Number 
ePlanReviewNo
Description
STEIN DISTRIBUTING - (FOUNDATION PERMIT) - This permit is issued to pour footings and foundation and do underground utilities for the future construction of the Stein Distributing building remodel and expansion. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file. DRH10-00223/Demo Permit BLD10-02537 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/30/201111/7/2011 DONE
DetailsChristina Prado
faxed 11-7-11
First Notice10/11/201110/11/201110/20/2011 DONE
DetailsTom Arcoraci
BLD-Final10/7/201110/10/201110/11/2011APASS
DetailsTom Arcoraci
mike Phone #: ###-####
DOC - Permit Finaled10/11/201110/11/201110/11/2011PPASS
DetailsTom Arcoraci
FIRE-Final Inspection10/10/201110/10/201110/10/2011PPASS
DetailsTroy Cobbley
life safety passed
BLD-Conference4/21/20114/21/20114/22/2011APASS
DetailsTom Arcoraci
BLD-Conference4/20/20114/20/20114/21/2011PPASS
DetailsTom Arcoraci
BLD-Aging Inspection4/20/20114/20/20114/20/2011 PASS
DetailsTom Arcoraci
BLD-Foundation2/17/20112/18/20112/18/2011APASS
DetailsTom Arcoraci
mike Phone #: ###-#### pend mti
BLD-Footing2/17/20112/18/20112/18/2011APASS
DetailsTom Arcoraci
mike Phone #: ###-#### pend mti
BLD-Footing2/9/20112/10/20112/10/2011PPASS
DetailsTom Arcoraci
MIKE Phone #: ###-#### pending mti
BLD-Footing1/28/20111/31/20111/31/2011APART
DetailsTom Arcoraci
Mike Phone #: ###-#### mti on site wip ok
Plan assigned to (JCM)11/10/2010 1/28/2011 PASS
DetailsJohn Menard
Routing - PLAN CHECK1/27/2011 1/28/2011 PASS
DetailsJohn Menard
Plans Routed to John per RMH
PLANS/APPL TAKEN TO FRONT DESK  1/28/2011 DONE
DetailsJohn Menard
Inspection Record Card- Bld  1/28/2011 DONE
DetailsChristina Prado
Permit Ready to Issue  1/28/2011 DONE
DetailsChristina Prado
Telephone call  1/28/2011 DONE
DetailsChristina Prado
Called and left message for Tammy to pick up. Advised on fees and ACHD requirements prior to issue
Telephone call  1/28/2011 DONE
DetailsChristina Prado
Called Tammy to pick up. Per Ron Hill ok to pick up without ACHD letter. Achd fees will be paid with building permit for Stein Dist.
Telephone call  1/28/2011  
I called and talked to Jeanie at ACHD, She indicated that it would be up to Boise City if we wanted to issued the permit, The Fee's and conditions of approval will be collected and performed under the Shell and Core permit that is still under review. RMH 1-28-11
Issue PAID IN FULL permit  1/28/2011 DONE
DetailsChristina Prado
Plan resubmittals received  1/27/2011 DONE
DetailsTisha Gallop
received two copies of SD1.1; taken by Roberta Kerr
Plan resubmittals received  1/26/2011 DONE
DetailsTisha Gallop
receceived four copies of plan sheet S6.03; taken by Roberta Kerr.
Routing - Design Review1/26/2011 1/26/2011 PASS
DetailsAndrea Tuning
This approval is for the foundation of the building only. A number of the plans included in the building package do not match the approved site plan and landscape plan in regard to landscape planters and parking areas.and are not approved as overall site plans. Andrea Tuning
Routing - PLAN CHECK11/26/2010 1/26/2011 PEND
DetailsJason Blais
Plans routed to Planning.
Plan Reviewer's activity  1/25/2011 DONE
Structural approval based on detail e-mailed directly to outsource structural reviewer. Permit can't be issued until we receive 4 copies of the revised sheet 6.03 (footing detail 2). John Menard e-mailed Jarod at Lochsaw and let him know.
Routing Off Site - STRUCTURAL1/18/2011 1/24/2011 PASS
DetailsJohn Menard
Received letter from consulting structural engineer approving final requested revisions. JCM
Routing - PLANNING1/24/2011 1/24/2011 PASS
DetailsJoshua Johnson
Telephone call  1/18/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up.
Plan resubmittals received  1/13/2011 DONE
DetailsTisha Gallop
received three copies of structural response and calculations and two copies of plans sheets S6.02, S6.03; inserted by Penelope Dennis and taken back to John Menard.
Plan resubmittals requested  1/6/2011 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the second structural review comment list requesting additional revisions. JCM
Routing Off Site - STRUCTURAL12/21/2010 1/5/2011 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions.
Plan resubmittals received  12/21/2010 DONE
DetailsTisha Gallop
received one copy of Geotech report, three copies of structural response and structural calcs, three copies of plan sheets S0.01, S6.01, S6.02, S6.03; taken to Ron Hill.
Telephone call  12/21/2010 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan resubmittals requested  12/10/2010 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL11/15/2010 12/10/2010 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - FIRE11/23/201011/23/201011/26/2010 PASS
DetailsScott Arellano
No seperate comments attached.
Routing - Design Review11/17/2010 11/26/2010 FAIL
DetailsAndrea Tuning
The applicant must either have Luch Street vacated or provide teh 20-foot street side setback that is required from Lauch Street. This was identified as a finding of fact and a site specific condition of approval in the Design Review approval.

DRH10-00223 Andrea Tuning, CVA10-00028 Josh Johnson
1st review completed  11/26/2010 FAIL
Failed Public Works, Erosion & Soil Control, Planning
Route to Impact Fee Review11/23/201011/29/201011/24/2010 PASS
DetailsCindy M. Gould
footings and foundation only building permit has not been applied for. Will put impact fees on building permit.
Routing - PLAN CHECK11/18/2010 11/23/2010 PASS
DetailsJohn Menard
John Menard
Routing - Erosion and Sediment11/19/2010 11/19/2010 PASS
DetailsSteven Webb
ESC "Master Plan" submitted to Boise City on November 18, 2010 is approved of scope of work beyond the demo portion of the project. Approved plan (ESC/SWPPP) is required to be on site during the project. Kent Olsen (CON04-00484) is the certified Responsible Person. As well ESC permit attached conditions are expected to be followed during construction.
Plan resubmittals received  11/18/2010  
ESC Narrative resubmitted, Ron Hill delivered to Steve Webb
Routing PW Drainage11/16/2010 11/17/2010 PASS
DetailsBrian Murphy
Routing - PLANNING11/17/2010 11/17/2010 FAIL
DetailsJoshua Johnson
The applicant must either have Lauch Street vacated or provide the 20-foot street side setback that is required from Lauch Street. This was identified as a finding of fact and a site specific condition of approval in the Design Review approval.

DRH10-00223 Andrea Tuning, CVA10-00028 Josh Johnson
Routing - PUBLIC WORKS11/15/2010 11/17/2010 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment11/17/2010 11/17/2010 FAIL
DetailsSteven Webb
reference ESC10-00814: ESC plan approved under ESC10-00814 does not include re-building portion of this project. I had informed the PD (T. Arnold) in October 2010 that this plan does not meet the requirements of BCC 8-17 for the re-building of the project. I also informed P. Dennis of McAlvain Design Build that another plan or at least an addendum to the prior approved plan/narrative will be needed. This project requires coverage under the Federal Construction General Permit.
Routing PW Sewer Rating11/16/2010 11/16/2010 PASS
DetailsConnie Baumgartner
Telephone call  11/15/2010 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - Addressing11/15/2010 11/15/2010 PASS
DetailsTerry Records
Application received 11/10/201011/12/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/10/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/10/2010 DONE
DetailsTisha Gallop