BLD-Final | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Tony Young
|
|
|
jim Phone #: ###-####
|
DOC - Permit Finaled | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Final | 4/26/2011 | 4/27/2011 | 4/27/2011 | P | DEFR |
Jim Storey
|
|
|
Jim Phone #: ###-#### need mech sign off
|
BLD-Final | 4/26/2011 | 4/26/2011 | 4/27/2011 | P | NR |
Tony Young
|
|
|
Jim Phone #: ###-####,, need trades
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/4/2011 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/2/2011 | 2/3/2011 | 2/3/2011 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
Routing Walk-In (BLD) | 2/3/2011 | 2/3/2011 | 2/3/2011 | A | PASS |
Perry Paine
|
|
|
projection changes ok
|
BLD-Framing/Rough-in | 1/11/2011 | 1/11/2011 | 1/11/2011 | P | FAIL |
Mike Jordan
|
|
|
chad Phone #: ###-####Framing at garage aDDITION, bathroom and patio cover. Needs tocomplete airseal, provide approved plans and needs shear nail inspection. Also needs to proveide additional nailing on T7 2 ply truss on webs and bottom chord as per truss engineering and install bearing blocks. ok to insulate.
|
BLD-Footing | 11/18/2010 | 11/19/2010 | 11/19/2010 | A | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
Routing Walk-In (PW Hillside) | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | DONE |
Colleen T Carroll
|
|
|
|
Routing Walk-In (Zoning) | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Joshua Johnson
|
|
|
|
Routing Walk-In (BLD) | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Perry Paine
|
|
|
approved revised site plan showing 2nd phase of project
|
PubWorks Subgrade Approval | 11/18/2010 | 11/18/2010 | 11/18/2010 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Case Summary (BLD) | | | 11/18/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/16/2010 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 11/12/2010 | | |
|
|
|
|
Routing Walk-In (PW Hillside) | 11/12/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Jim Wyllie
|
|
|
|
Routing Walk-In (Zoning) | 11/12/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 11/12/2010 | 11/12/2010 | 11/12/2010 | A | FAIL |
Perry Paine
|
|
|
need foundation engineering.
|
Routing Walk-In (BLD) | 11/12/2010 | 11/12/2010 | 11/12/2010 | P | PASS |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 11/12/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2010 | | |
|
|
|
|
1st review completed | | | 11/12/2010 | | DONE |
|
|
|
|
Telephone call | | | 11/12/2010 | | DONE |
Tisha Gallop
|
|
|
called Renaissance Remodeling and told Trina that permit is ready and fees.
|
Application received | | 11/12/2010 | | | |
|
|
|
|