BLD-Final | 1/5/2011 | 1/6/2011 | 1/6/2011 | A | PASS |
Jim Sly
|
|
|
Trina Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 1/6/2011 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/4/2011 | 1/5/2011 | 1/5/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 12/1/2010 | 12/2/2010 | 12/2/2010 | A | FAIL |
Troy Cobbley
|
|
|
Repair both exit signs at the front and rear exits, repair the centrally located emergency light. Also two pendant heads are over spaced off of the restroom walls. This sprinkler work will require a separate permit. A correction notice and a marked up plan was left on site with the owner. I also left a message on Bob's voice mail.
|
Routing Walk-In (BLD) | 12/1/2010 | 12/1/2010 | 12/1/2010 | P | PASS |
Perry Paine
|
|
|
new floor plan accepted
|
FIRE-Final Inspection | 11/30/2010 | 11/30/2010 | 11/30/2010 | P | FAIL |
Troy Cobbley
|
|
|
I spoke to Bob over the phone and he stated that he did not have the city approved drawings/notes on site. We discussed what I needed to perform my inspection and I eventually deferred him to the plan reviewer for further assistance. No inspection was performed.
|
BLD-Conference | 11/29/2010 | 11/30/2010 | 11/30/2010 | P | CANC |
Jim Sly
|
|
|
Robert ###-####..........Still waiting on fire inspection approval.
|
BLD-Final | 11/23/2010 | 11/29/2010 | 11/30/2010 | P | CANC |
Jim Sly
|
|
|
Robert phone 484 2354 Trina 375- 7575
|
FIRE-Final Inspection | 11/29/2010 | 11/29/2010 | 11/29/2010 | P | CANC |
Troy Cobbley
|
|
|
I spoke to Bob and he stated that there was no paper work at the project site. I contacted Jim Sly and he was going to contact Bob and go over the requirements for an inspection.
|
BLD-Conference | 11/24/2010 | 11/29/2010 | 11/29/2010 | A | CANC |
Jim Sly
|
|
|
Robert ###-#### Trina ###-#### Re-sched....
|
BLD-Final | 11/22/2010 | 11/23/2010 | 11/24/2010 | P | NR |
Jim Sly
|
|
|
Robert Phone #: ###-#### Went to address....No plans on site.....Need Fire final inspection prior to calling for Structural final.
|
FIRE-Final Inspection | 11/22/2010 | 11/23/2010 | 11/23/2010 | A | FAIL |
Troy Cobbley
|
|
|
I left a message on the contacts voice mail at 8:30 stating I would be there in 30 minutes. I arrived at 9:00 and he was not here. I spoke to a lady in the flowere shop but she was not sure who Robert was and did not have the city approved drawings. No inspection was performed. Robert Phone #: ###-####
|
Plan assigned to (PEP) | 11/19/2010 | 11/19/2010 | 11/22/2010 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 11/19/2010 | 11/19/2010 | 11/22/2010 | P | DONE |
Perry Paine
|
|
|
|
1st review completed | | | 11/22/2010 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/22/2010 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 11/22/2010 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 11/22/2010 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 11/19/2010 | | 11/22/2010 | | PASS |
Perry Paine
|
|
|
|
Application received | | 11/19/2010 | 11/19/2010 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 11/19/2010 | | PASS |
Perry Paine
|
|
|
|
First Notice | | 1/16/2011 | | | |
|
|
|
|