Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD10-02738
StatusFinaled
Name ESI
Site Address 12000 W EXECUTIVE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(Shell & Core – Fire Pump Room) Permit is to upgrade an existing fire riser room to be fully rated and comply with the other provisions of a Fire Pump Room (Last occupied by BMC West Door Plant). Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create the rated fire pump room, installation of new accessible door / hardware, installation of new mechanical vents, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Any racking installed exceeding 8 ft. in height will require a separate racking permit. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/10/20114/8/2011 DONE
This permit finaled on the web by nate hutton
First Notice3/29/20113/29/20113/31/2011 DONE
DetailsMike Jordan
BLD-Final3/28/20113/29/20113/29/2011APASS
DetailsMike Jordan
final inspection for riser room

Nate Hutton-###-#### >> Inspection requested via web by nate hutton
DOC - Permit Finaled3/29/20113/29/20113/29/2011PPASS
DetailsMike Jordan
BLD-Conference3/28/20113/28/20113/28/2011PDONE
DetailsTroy Cobbley
Final fire and building inspections
FIRE-Final Inspection3/28/20113/28/20113/28/2011PPASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  2/22/2011 DONE
DetailsChristina Prado
OVERRIDE  12/14/2010  
Telephone call  12/14/2010 DONE
12-14-10 called Nate permit ready and fee given. Also need electrical & plumbing certof value filled out.///dld
Plan assigned to (TLW)11/24/2010 12/14/2010 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK12/8/2010 12/14/2010 PASS
DetailsTim L. Woodard
Project submitted yesturday to clear up Scentsy project that had been begun without any permits. This and all future BLD's will be double feed. TLW
PLANS/APPL TAKEN TO FRONT DESK  12/14/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/14/2010 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  12/14/2010 DONE
Permit Ready to Issue  12/14/2010 DONE
Routing - FIRE12/2/2010 12/8/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans.
1st review completed  12/8/2010 PASS
Routing - PLAN CHECK11/24/2010 12/2/2010 PASS
DetailsTim L. Woodard
Approved with Redline of shaft requirements. TLW
Plans ACCEPTED BY PLAN TECH  11/24/2010 DONE
ok per Tim W. for a level 1 intake
Recd Pcfee & Taken To Pln CK  11/24/2010 DONE
Application received 11/19/2010