Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD10-02760
StatusFinaled
Name VERTICAL CORP
Site Address 416 S 8TH ST Unit: 010
Project NameIntelliScience
Customer Number 
ePlanReviewNo
Description
(INTELLISCIENCE - DRAKE COOPER BUILDING - BASEMENT) Fire sprinklers used to allow a 100 foot travel distance for stories with one exit. To remodel an existing 6,717 square foot office tenant space located in the basement of an existing building. Work is to include an interior nonbearing wall, a shower and shower room accessible to the disabled, and an accessible upgrade to an existing restroom. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Fire sprinkler heads in the basement and on the 1st story will be replaced with quick-response heads. Building shell work was done under permit BLD10-02635. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/27/20113/23/2011 DONE
First Notice 3/6/20113/17/2011 DONE
BLD-Final2/23/20112/24/20112/24/2011APASS
DetailsDave Hannah
call when on way//Jerry Phone #: ###-####
Permanent Occupancy  2/24/2011 DONE
FIRE-Final Inspection2/22/20112/22/20112/23/2011PPASS
DetailsForrest France
Fire life safety finaled.
Routing - FIRE12/8/201012/8/201012/14/2010 PASS
DetailsScott Arellano
Plans approved with red lined comments and attached plan review report.
Plan assigned to (CJW)11/23/201011/23/201012/14/2010 PASS
DetailsCarl Westfall
1st review completed  12/14/2010 PASS
Routing - PLAN CHECK12/14/2010 12/14/2010 DONE
DetailsCarl Westfall
Drawings taken to the permits desk,
PLANS/APPL TAKEN TO FRONT DESK  12/14/2010 DONE
Print Occupancy Form  12/14/2010 DONE
DetailsTisha Gallop
Permit Ready to Issue  12/14/2010 DONE
Telephone call  12/14/2010 DONE
12-14-10 called Andrew Erstad permit ready and fee given ///dld
Issue PAID IN FULL permit  12/14/2010 DONE
DetailsChristina Prado
Route to Impact Fee Review12/8/201012/13/201012/9/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK12/7/2010 12/8/2010 PASS
DetailsCarl Westfall
Drawings approved.
Routing - PUBLIC WORKS11/30/2010 12/7/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing12/6/2010 12/6/2010 PASS
DetailsTerry Records
Routing - PLAN CHECK11/24/2010 11/30/2010 FAIL
DetailsCarl Westfall
Application received 11/23/201011/23/2010 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  11/23/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  11/23/2010 DONE
DetailsBarbara Stitt