Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02792
StatusFinaled
Name DURBIN BUILDERS
Site Address 1025 S CAPITOL BLVD
Project NameHCD
Customer Number 
ePlanReviewNo
Description
(HOUSING AND COMMUNITY DEVELOPMENT) Permit is to remodel an existing 616 square foot office area within the existing HCD office building. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to enlarge the existing two offices, installation of new accessible door / hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is only Fire Sprinklered with an approved Fire Alarm system in the existing cafeteria (Light House) side of the building. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/14/20114/1/2011 DONE
Third Notice 3/22/20113/31/2011 DONE
interoffice mail to HCD (Ron Garvin)
Second Notice 3/13/20113/17/2011 DONE
DetailsChristina Prado
Mailed 3-18-11
First Notice2/28/20112/28/20113/3/2011 DONE
DetailsTom Arcoraci
BLD-Final2/25/20112/28/20112/28/2011PPASS
DetailsTom Arcoraci
ron Phone #: ###-####
DOC - Permit Finaled2/28/20112/28/20112/28/2011PPASS
DetailsTom Arcoraci
FIRE-Final Inspection2/25/20112/28/20112/28/2011APASS
DetailsForrest France
Life safety inspection per scope of permit documents passed.
BLD-Final2/25/20112/25/20112/27/2011PNR
DetailsJim Sly
Ron Phone #: ###-#### ext 110
Need fire final.
BLD-Framing/Rough-in1/24/20111/24/20111/24/2011PPASS
DetailsJim Storey
Mark-PLease call at least 30 mins prior to inspection Phone #: ###-####
Issue & PRINT to be Invoiced  1/24/2011 DONE
DetailsBarbara Stitt
Permit Ready to Issue  12/7/2010  
Telephone call  12/7/2010 DONE
12-7-10 called Ron permit ready ///dld
Plan assigned to (TLW)12/1/2010 12/6/2010 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK12/1/2010 12/6/2010 PASS
DetailsTim L. Woodard
Routing - FIRE  12/6/2010 PASS
DetailsTim L. Woodard
FIELD VERIFY
1st review completed  12/6/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/6/2010 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/6/2010 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  12/6/2010 DONE
Recd Pcfee & Taken To Pln CK  12/1/2010 DONE
Application received 12/1/2010