Letter of compliance/Occupancy | | | 6/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/18/2011 | 5/19/2011 | 5/19/2011 | A | PASS |
Mike Jordan
|
|
|
Rustin Phone #: ###-####
|
DOC - Permit Finaled | 5/19/2011 | 5/19/2011 | 5/19/2011 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy issued.
|
BLD-Final | 5/13/2011 | 5/13/2011 | 5/13/2011 | P | NR |
Mike Jordan
|
|
|
rustin - please call for access Phone #: ###-####. Neesd electrical final.
|
BLD-Energy code compliance | 2/17/2011 | 2/17/2011 | 2/17/2011 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rustin Ray
|
BLD-Framing/Rough-in | 2/17/2011 | 2/17/2011 | 2/17/2011 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rustin Ray
|
BLD-Energy code compliance | 2/16/2011 | 2/16/2011 | 2/16/2011 | P | CANC |
Mike Jordan
|
|
|
rustin Phone #: ###-####
|
BLD-Framing/Rough-in | 2/16/2011 | 2/16/2011 | 2/16/2011 | P | FAIL |
Mike Jordan
|
|
|
rustin Phone #: ###-####. Still needs to seal around gas pipe penetration at bottom plate for fireblocking, also, ESC issues have not been resolved.
|
BLD-Framing/Rough-in | 2/15/2011 | 2/15/2011 | 2/15/2011 | P | FAIL |
Mike Jordan
|
|
|
rustin Phone #: ###-####. Provide strap at top plate at 4" dryer vent, Foam seal bottom plate at gas pipe penetration, Nail 2ply F3 truss as per truss engineeing, Provide support at bottom of stairs as noted on approved plans. Correction notice posted. ok to insulate.
|
BLD-Framing/Rough-in | 1/24/2011 | 1/24/2011 | 1/24/2011 | P | FAIL |
Mike Jordan
|
|
|
Rustin Phone #: ###-####. Ok to insulate. Needs to modify scope of work to reflect the bathroom upstairs as being finished and not storage as noted on approv ed plans. Also noted excessive notching and bored holes in 2x10 floor joist were holes and notches are not allowed per IRC. Noted to contractor that they would need to justify in place work with engineering or use the enginnered floor joist shown on approved plans.
|
BLD-Foundation | 1/21/2011 | 1/21/2011 | 1/21/2011 | P | PASS |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
BLD-Conference | 1/19/2011 | 1/19/2011 | 1/19/2011 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Footing | 1/19/2011 | 1/19/2011 | 1/19/2011 | P | PASS |
Mike Jordan
|
|
|
jay Phone #: ###-####. ok to place concrete, subgrade has thawed.
|
BLD-Foundation | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | PART |
Mike Jordan
|
|
|
jAY Phone #: ###-####. Noted that subgrade is frozen, no concrete is allowed at this time. Needs to reschedule inspection when subgrade is thawed prior to placing concrete.
|
Issue PAID IN FULL permit | | | 1/14/2011 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 12/30/2010 | | |
|
|
|
|
Plan assigned to (PEP) | 12/27/2010 | 12/27/2010 | 12/30/2010 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 12/30/2010 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
reprint
|
Permit Ready to Issue | | | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
ready to issue after modification
|
Telephone call | | | 12/30/2010 | | DONE |
Tisha Gallop
|
|
|
called Stan Ray and told him permit is ready and new fees
|
Routing - PLAN CHECK | 12/27/2010 | | 12/30/2010 | | PASS |
Perry Paine
|
|
|
|
Plan resubmittals received | | | 12/27/2010 | | |
|
|
|
received two copies of full plans 12-27-2010 cdp. Routed to Perry for review
|
OVERRIDE | | | 12/20/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2010 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2010 | | DONE |
|
|
|
t/c w stan - permit ready and fees given
|
Permit Ready to Issue | | | 12/20/2010 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 12/17/2010 | 12/17/2010 | 12/17/2010 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (CDM) | 12/2/2010 | 12/2/2010 | 12/17/2010 | | DEFR |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/9/2010 | | 12/17/2010 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 12/17/2010 | | |
|
|
|
|
1st review completed | | | 12/17/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2010 | | DONE |
|
|
|
|
Route to Impact Fee Review | 12/2/2010 | 12/7/2010 | 12/9/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 12/8/2010 | | 12/9/2010 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 12/8/2010 | | 12/8/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 12/3/2010 | | 12/7/2010 | | PASS |
Terry Records
|
|
|
|
Application received | | 12/2/2010 | 12/3/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/3/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/2/2010 | | DONE |
|
|
|
|
Intake Approval | | | 12/2/2010 | | PASS |
Tisha Gallop
|
|
|
|