"This structure is located in Wildland Urban Interface zone A. No Fire Sprinkler System required per Tim Frost 12-14-2010" To construct a new 2,813 sq. ft., Two story, (1,926 sq.ft. First story / 887 sq.ft. Second story) single family dwelling with 4 bedrooms, 3 1/2 bathrooms, approximately 240 sq. ft. of covered patio/porch and a 1,019 sq. ft. attached garage. All work to be done per the approved plans, plan review report, Engineering and all other reviewing agencies approvals. This lot is within the hillside area and is subject to the hillside ordinances. A class “A” non-combustible roof system with protection of eaves, soffits, facias, and exterior walls is required. A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. Fire sprinklers are not required per Fire plan review. A-1 zoning and setbacks per planning and zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/21/20117/22/20117/22/2011APASS
DetailsTony Young
Shane Phone #: ###-####
DOC - Permit Finaled7/22/20117/22/20117/22/2011PPASS
DetailsTony Young
c of c issued
BLD-Grading Inspection7/22/20117/22/20117/22/2011ADONE
DetailsTerry Records
Final grading and drainage approved
BLD-Energy code compliance4/15/20114/18/20114/18/2011APASS
DetailsTony Young
shane Phone #: ###-####
BLD-Energy code compliance4/14/20114/15/20114/15/2011AFAIL
DetailsTony Young
shane Phone #: ###-####,, still need fireplace final
BLD-Framing/Rough-in4/8/20114/11/20114/11/2011APART
DetailsTony Young
Shane Phone #: ###-####,, correction notice on rear of truss calcs,, need fireplace pass,, need ESC posted,, etc,, ok to insulate
BLD-Foundation1/19/20111/20/20111/20/2011PPART
DetailsTony Young
Bill Phone #: ###-####,, work ln progress
BLD-Footing1/18/20111/19/20111/19/2011APART
DetailsTony Young
Bill-around 9:30 if possible please Phone #: ###-####,, work in progress
PubWorks Subgrade Approval1/18/20111/18/20111/18/2011 DONE
DetailsTerry Records
Footing subgrade approved by the geotechnical engineer
Issue PAID IN FULL permit  1/3/2011 DONE
DetailsChristina Prado
Route to Impact Fee Review12/29/20101/4/201112/29/2010 PASS
DetailsCindy M. Gould
Plan assigned to (SRZ)12/17/201012/17/201012/29/2010 PASS
DetailsSam Zahorka
Routing - PLAN CHECK12/22/2010 12/29/2010 PASS
DetailsSam Zahorka
Plan assigned to (CDM)12/10/2010 12/29/2010 PASS
DetailsCarl D Madsen
Defered to Sam Z 12-17-10 CDM
Inspection Record Card- Bld  12/29/2010 DONE
Permit Ready to Issue  12/29/2010 DONE
DetailsTisha Gallop
Telephone call  12/29/2010 DONE
DetailsTisha Gallop
called and left message for Shane that permit is ready and fees
Case Summary (BLD)  12/29/2010 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  12/29/2010 DONE
DetailsSam Zahorka
Telephone call  12/28/2010 DONE
DetailsSam Zahorka
Spoke with the designer Brian McGowan about correction status. He stated he was still discussing with the applicant Shane Jayo and would have the corrections soon. SRZ
Meeting  12/23/2010 DONE
DetailsSam Zahorka
Meeting with Brian McGowan to discuss needed corrections prior to permit issuance. He stated he would speak with the applicant Shane Jayo and get back with me.
Routing - PLAN CHECK12/14/2010 12/22/2010 FAIL
DetailsSam Zahorka
Corrections needed.
Telephone call  12/22/2010 DONE
DetailsSam Zahorka
Called the Designer Brian Gowanwood and requested plan corrections prior to permit issuance. He stated he wanted to have a meeting to discuss the corrections and the WUI. I'm waiting for him to call to schedule the meeting.
Case Summary (BLD)  12/22/2010  
1st review completed  12/22/2010 DONE
DetailsSam Zahorka
Routing - Erosion and Sediment12/13/2010 12/14/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC10-00894
Routing - FIRE12/14/2010 12/14/2010 PASS
DetailsScott Arellano
Fire sprinklers are not required on this project
Routing - PLANNING12/10/2010 12/13/2010 PASS
DetailsColleen T Carroll
Application received 12/10/201012/10/2010 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  12/10/2010 DONE
DetailsChristina Prado
Intake Approval  12/10/2010 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/10/2010 DONE
DetailsChristina Prado
Routing - Addressing12/10/2010 12/10/2010 PASS
DetailsTerry Records
Routing - PUBLIC WORKS  12/10/2010 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside  12/10/2010 PASS
DetailsTerry Records
Approved as Category 3