Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD10-02862
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 960 S BROADWAY AVE 340
Project NameDept of Treasury-IRS
Customer Number 
ePlanReviewNo
Description
Department of Treasury-IRS-- Permit for tenant improvements to an existing 3707 sq. ft. tenant space with work to include the removal of approximately 66 lineal feet of interior non-bearing partition wall and the construction of approximately 63 lineal feet of new interio non-bearing partition wall for the recofiguration of the tenant space. All interior finishes to be installed as required per chapter 8 of the IBC. "This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/13/2011 DONE
Third Notice 12/5/201111/22/2011 DONE
DetailsChristina Prado
done
Third Notice 11/12/201111/22/2011 DONE
faxed
Second Notice 10/30/201111/7/2011 DONE
DetailsChristina Prado
faxed 11-7-11
First Notice 10/17/201110/20/2011 DONE
Permanent Occupancy  10/7/2011 DONE
DetailsChristina Prado
BLD-Final9/29/20119/30/20119/30/2011PPASS
DetailsJim Storey
matt Phone #: ###-####
FIRE-Final Inspection9/29/20119/30/20119/30/2011APASS
DetailsForrest France
Fire life safety inspection passed.
FIRE-Alarm Testing9/13/20119/13/20119/13/2011PPART
DetailsForrest France
Fire alarm work passed field testing.
FIRE-Conference8/30/20118/31/20118/31/2011APART
DetailsForrest France
Inspection for cover at the fire sprinkler system modifications passed.
FIRE-Final Inspection8/15/20118/15/20118/15/2011PNR
DetailsForrest France
Work in progress
BLD-Framing/Rough-in8/4/20118/5/20118/5/2011APASS
DetailsJim Storey
jack Phone #: ###-####
FIRE-Final Inspection7/20/20117/20/20117/21/2011PNR
DetailsForrest France
Issue PAID IN FULL permit  5/18/2011 DONE
DetailsChristina Prado
Print Occupancy Form  12/17/2010 DONE
Permit Ready to Issue  12/17/2010 DONE
DetailsTisha Gallop
Telephone call  12/17/2010 DONE
DetailsTisha Gallop
called and told Matt Rhees permit is ready and fees.
Plan assigned to (CDM)12/10/201012/10/201012/16/2010 DONE
DetailsCarl D Madsen
Routing - PLAN CHECK12/10/2010 12/16/2010 PASS
DetailsCarl D Madsen
Carl Madsen
1st review completed  12/16/2010 DONE
Routing - FIRE  12/16/2010 PASS
Verify in field CDM
Case Summary (BLD)  12/16/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/16/2010  
Application received 12/10/201012/10/2010 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  12/10/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  12/10/2010 DONE
DetailsBarbara Stitt