Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02882
StatusFinaled
Name TOM HOUSTON (OWN REP)
Site Address 800 E PARK BLVD
Project NameBOISE HUD OFFICE
Customer Number 
ePlanReviewNo
Description
(BOISE HOUSING AND URBAN DEVELOPMENT OFFICE - 2ND STORY - SOUTH SIDE) Fire sprinklers used to meet high-rise provisions. To enlarge an existing 657 square foot conference room to 814 square feet creating an A-3 Occupancy within an existing 4,534 square foot office tenant space. The size of the tenant space will NOT increase. Security features will also be added. Work is to include interior nonbearing walls, interior doors, new self-closing and self-latching 20 minute fire doors with card reader security and automatic openers/closers in existing 1-hr corridor walls, panic hardware, a glazed service window with a pass-through opening and speak-through device, a new break room sink, and millwork. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The existing restrooms on this story were upgraded to be accessible to the disabled under permit BLD06-02701. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/18/20116/28/2011 DONE
Second Notice 6/5/20116/13/2011 DONE
First Notice 5/16/20115/26/2011 DONE
Permanent Occupancy  5/6/2011 DONE
DetailsTisha Gallop
BLD-Final5/2/20115/3/20115/3/2011APASS
DetailsDave Hannah
Request permit be finaled out now that the fire life/safety has passed. Thanks. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
FIRE-Final Inspection5/2/20115/2/20115/2/2011PPASS
DetailsForrest France
Fire life safety finaled. Inspection passed. No signature card available on site.
BLD-Final4/28/20114/29/20114/29/2011APART
DetailsDave Hannah
>> Inspection requested via web by Brandon McCurdy ok for perm occ after fire oks
FIRE-Final Inspection4/18/20114/18/20114/18/2011APART
DetailsForrest France
Project related fire alarm and fire sprinkler permits finaled.
BLD-Framing/Rough-in3/7/20113/7/20113/7/2011PPASS
DetailsDave Hannah
There is nobody on site. The stamped drawings are sitting on the table in the back Conference Room. Contact Brandon @ ###-#### with any questions. Thanks. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
Issue PAID IN FULL permit  2/28/2011  
Routing - PLAN CHECK12/29/2010 12/30/2010 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  12/30/2010 DONE
Print Occupancy Form  12/30/2010 DONE
Permit Ready to Issue  12/30/2010 DONE
DetailsBarbara Stitt
Telephone call  12/30/2010 DONE
DetailsBarbara Stitt
Left a message for Katie Butler that permit is ready, fees due and need GC & GC # on 12-30-10 @ 1:30pm
Plan assigned to (CJW)12/17/2010 12/30/2010 PASS
DetailsCarl Westfall
Route to Impact Fee Review12/27/201012/30/201012/29/2010 PASS
DetailsCindy M. Gould
Remodel existing tenant space
Routing - FIRE12/27/201012/27/201012/29/2010 PASS
DetailsScott Arellano
Please, see attached comments.
.
1st review completed  12/29/2010 DONE
Routing - PLAN CHECK12/21/2010 12/27/2010 PASS
DetailsCarl Westfall
The IBC plan review was started on December 22, 2010 and was finished on December 27, 2010. The drawings were approved with "red lines". See the plan review report.
Routing - PUBLIC WORKS12/17/2010 12/21/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating12/20/2010 12/20/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing12/20/2010 12/20/2010 PASS
DetailsTerry Records
Pending Assignment by JCB12/14/2010 12/17/2010 DONE
DetailsJason Blais
Application received 12/14/201012/14/2010 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  12/14/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  12/14/2010 DONE
DetailsBarbara Stitt