DOC - Permit Expired | 3/13/2013 | 3/13/2013 | 3/13/2013 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/12/2013 | 3/12/2013 | 3/13/2013 | P | PASS |
Dave Hannah
|
|
|
|
Case Summary (BLD) | | | 8/10/2011 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | FAIL |
Jim Sly
|
|
|
Tracy phone ###-#### Framed a lot of other areas in this residence that is not in the scope of work for this permit. Need plan modification and approvals.
|
BLD-Framing/Rough-in | 2/22/2011 | 2/22/2011 | 2/23/2011 | P | NR |
Jim Sly
|
|
|
Tracy Phone #: ###-####
|
Routing Walk-In (BLD) | 2/17/2011 | 2/17/2011 | 2/17/2011 | A | FAIL |
Perry Paine
|
|
|
will need new permit and foundation engineering
|
Routing Walk-In (PW Hillside) | 12/17/2010 | 12/17/2010 | 12/17/2010 | A | DONE |
Terry Records
|
|
|
Prior to final inspection the design engineer must submit a letter indicating that the foundation was done according to the approved plans.
|
Routing Walk-In (Zoning) | 12/17/2010 | 12/17/2010 | 12/17/2010 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 12/17/2010 | 12/17/2010 | 12/17/2010 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 12/17/2010 | 12/17/2010 | 12/17/2010 | | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 12/17/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/17/2010 | | |
|
|
|
|
1st review completed | | | 12/17/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/17/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/17/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/17/2010 | | DONE |
|
|
|
|
Application received | | 12/17/2010 | | | |
|
|
|
|