Permit Information
Permit NumberBLD10-02905
StatusFinaled
Name ASPEN LEAF FROZEN YOGURT
Site Address 800 W IDAHO ST Unit: 112
Project NameTHE MODE BUILDING
Customer Number 
ePlanReviewNo
Description
(ASPEN LEAF FROZEN YOGURT) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. An automatic sprinkler system shall be required in the proposed walk-in freezer. Remodel for a new assembly frozen yogurt tenant in an existing 4,008 sq. ft. space on first floor of existing building. This space was previously occupied by Osaka Japanese and Sushi restaurant. Work to include: interior demolition work per plans; construct new interior walls to create a new customer sales/dining area, a employee support room, a small office, and storage room; install new flooring, ceiling treatment, and wall treatment; install new plumbing, electrical, and plumbing distribution work from the existing units and panels; installation of exit signs and emergency lighting; removing an exterior door and replacing with storefront glazing; and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. All work shall comply with the approved drawings, the plan review report, and all applicable codes. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/10/20114/8/2011 DONE
Telephone call  4/8/2011 DONE
DetailsTisha Gallop
Per phone call with Jeff Langan/CSDI; electrical value $2,742 of it is for alarm; mechanical - Highmark was did not go through CSDI so he didn't include their value and KMD had a change order of +3,423 he didn't include in this worksheet that needs to be added to mech and project value. Called Highmark and their final value over the phone was $4,336.
First Notice 3/26/20113/31/2011 DONE
Permanent Occupancy UNPAID FEE  3/16/2011 DONE
DetailsBarbara Stitt
BLD-Final2/28/20113/1/20113/1/2011PPASS
DetailsDave Hannah
Tony Phone #: ###-####
Temporary Occupancy UNPAID FEE  3/1/2011 DONE
DetailsBarbara Stitt
FIRE-Final Inspection2/24/20112/25/20112/25/2011APASS
DetailsForrest France
Fire life safety completed acceptable, inspection passed.
Zoning Approval2/25/20112/25/20112/25/2011 PASS
DetailsJosh Wilson
FIRE-Conference2/15/20112/15/20112/15/2011PDONE
DetailsForrest France
Regarding fire alarm and sprinkler system modifications due to tenant remodel work.
FIRE-Sprinkler Rough-in2/8/20112/9/20112/9/2011APART
DetailsForrest France
Overhead fire sprinkler system modifications okayed for cover with exceptions as marked on FP plan sheet. Verified insulation fill at the east soffit concealed space.
BLD-Framing/Rough-in2/3/20112/4/20112/7/2011APASS
DetailsDave Hannah
Tony Phone #: ###-####
BLD-Wall cover2/2/20112/3/20112/4/2011PPART
DetailsDave Hannah
Tony Phone #: ###-#### ok to cover walls
BLD-Wall cover1/25/20111/26/20111/26/2011APART
DetailsJim Storey
Tony Phone #: ###-#### ok to hang gyp in service area ceilling.
Print Occupancy Form  1/21/2011 DONE
Issue PAID IN FULL permit  1/21/2011 DONE
Routing - PLAN CHECK1/11/2011 1/12/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/12/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  1/12/2011 DONE
Permit Ready to Issue  1/12/2011 DONE
Telephone call  1/12/2011 DONE
1-12-11 called Thom permit ready and fee given Also nee GC & ACHD ///dld
Plan assigned to (SRZ)12/17/2010 1/12/2011 PASS
DetailsSam Zahorka
Routing - PLAN CHECK1/5/2011 1/11/2011 PASS
DetailsSam Zahorka
Case Summary (BLD)  1/11/2011 DONE
DetailsSam Zahorka
Routing - PLUMBING1/11/2011 1/11/2011 PASS
DetailsBill VanDegrift
per resubmitted plans dated 12/30/10 and 2003 upc
Telephone call  1/7/2011 DONE
DetailsSam Zahorka
I spoke with the Architect Mr. Toben about needed corrections. He stated he would email them Monday Jan. 10th.
Routing - FIRE1/3/2011 1/5/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  1/5/2011 FAIL
Failed Plumbing, Plan Check
Routing - PLAN CHECK12/23/2010 1/4/2011 FAIL
DetailsSam Zahorka
Corrections needed.
Plan resubmittals received  12/30/2010 DONE
received 1 transmittal letter, 2 T & S Brass and Bronze Works sheets and 2 copies of sheets P1.0,P2.0 taken to Sam Z
Routing - PLANNING12/22/2010 12/23/2010 PASS
DetailsJosh Wilson
Josh Wilson - CZC10-00251
Routing - PLUMBING12/22/2010 12/22/2010 FAIL
DetailsBill VanDegrift
(1)reduced pressure backflow preventer required on the make up water to the machines, detail on page P2.0 (2) pressure vacuum breaker required on the hose reel. (3) floor sink required on the waste for the waste sink 18a, not located with in a cabinet. (4) drain added at the hose reel attached toCDHD review dated 12/13/10. Please address items 1,2 and 3 and resubmit.
Routing - PUBLIC WORKS12/17/2010 12/22/2010 PASS
DetailsBeverly Mountain
Routing PW Environmental12/20/2010 12/21/2010 PASS
DetailsWalt Baumgartner
No grease abatement required, OK.
Routing - Addressing12/20/2010 12/20/2010 PASS
DetailsTerry Records
Routing PW Sewer Rating12/20/2010 12/20/2010 PASS
DetailsConnie Baumgartner
Application received 12/17/201012/17/2010 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  12/17/2010 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/17/2010 DONE
DetailsChristina Prado
Pending Assignment by JCB12/17/2010 12/17/2010 DONE
DetailsJason Blais