Third Notice | | 7/12/2011 | 7/7/2011 | | DONE |
|
|
|
|
Third Notice | | 6/18/2011 | 6/28/2011 | | DONE |
|
|
|
faxed
|
Second Notice | | 6/5/2011 | 6/13/2011 | | DONE |
Christina Prado
|
|
|
Faxed 6-13-11
|
First Notice | | 5/13/2011 | 5/26/2011 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 5/3/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/28/2011 | 4/29/2011 | 4/29/2011 | A | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. All issues were resolved. Ok for perm. occ.
|
Temporary Occupancy UNPAID FEE | | | 4/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 4/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/19/2011 | 4/20/2011 | 4/20/2011 | P | PART |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. ok for temp. occ. Needs to provide vertical grab bars in both restrooms, complete firecaulking in 1hr. roof/ceiling assembly and provide code compliant door hardware on employee enterance.
|
FIRE-Final Inspection | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Per conversation with the building inspector the west facing exit doors that require the single action hardware will be verified by the building inspector.
|
FIRE-Final Inspection | 4/15/2011 | 4/19/2011 | 4/19/2011 | P | FAIL |
Troy Cobbley
|
|
|
See the correction notice for items completed as the job site. Not all of the items have been addressed.
|
FIRE-Final Inspection | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | FAIL |
Troy Cobbley
|
|
|
Provide for final inspection for BLD11-00265. Provide for testing of the exit discharge lights and exit signs. Repair emergency light in "check out" area. Provide single action hardware for the west exterior exit doors (per the plans one door panel is to be fixed). The "Cylinder Closet" exterior wall venting does not meet the height requirements of IFC 3006.2.1. Provide the NFPA Hazard Warning Sign per IFC 2703.5. Door is missing the smoke seal.
|
BLD-Energy code compliance | 3/15/2011 | 3/16/2011 | 3/16/2011 | P | PASS |
Tom Arcoraci
|
|
|
Cameron Phone #: ###-#### grid ok, 1 hr can lights covers ok
|
BLD-Other | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PASS |
Mike Jordan
|
|
|
drywall nail inspection 2nd layer//cameron Phone #: ###-####. face layer of 5/8 type x rock for 1hr. ceiling and 1hr. firewall.
|
BLD-Other | 2/23/2011 | 2/23/2011 | 2/23/2011 | P | PART |
Mike Jordan
|
|
|
drywall nail inspection 1st layer//Cameron Phone #: ###-####. Base layer of 5/8 type x rock for 1hr. ceiling assembly.
|
BLD-Framing/Rough-in | 2/18/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. All framing issues have been resolved. Also met with sheetrock contractor. All other fire issues with 1hr. ceiling have been discussed and will be inspected as job progresses.
|
BLD-Energy code compliance | 2/22/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####
|
BLD-Energy code compliance | 2/16/2011 | 2/18/2011 | 2/18/2011 | P | CANC |
Mike Jordan
|
|
|
cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 2/16/2011 | 2/17/2011 | 2/17/2011 | P | FAIL |
Mike Jordan
|
|
|
cameron Phone #: ###-####. Sprinkler rough in required prior to cover, Bearing blocks required at girder truss T15 and T14. Truss T7 requires min 2x6 T bracing, 2x4 was used. Need approved plan forshell portion of work. Needs to provide rated can lights or box out. Provide damperas for ducts, fire collar for water heater vent, 5/8 type x rock reqiured at ceiling at pre built soffits. ok to inulate.
|
BLD-Energy code compliance | 2/4/2011 | 2/4/2011 | 2/4/2011 | P | PART |
Mike Jordan
|
|
|
CAMERON Phone #: ###-####. Wall insulation at 1hr. gas room.
|
BLD-Conference | 1/27/2011 | 2/1/2011 | 2/1/2011 | A | CANC |
Mike Jordan
|
|
|
cameron Phone #: ###-#### 1-31-11 PER CAMERON JAYO CONSTRUCTION CANCEL INSPECTION ///DLD
|
BLD-Footing | 1/26/2011 | 1/27/2011 | 1/27/2011 | P | PASS |
Mike Jordan
|
|
|
cameron Phone #: ###-####. Footing for 1hr gas room.
|
Permit Ready to Issue | | | 1/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/21/2011 | | DONE |
Barbara Stitt
|
|
|
Called Cameron and left voice message that permit is ready & fees due, also need valid RP on 1-21-11 @ 8:45am
|
Issue PAID IN FULL permit | | | 1/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 12/20/2010 | | 1/20/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 1/20/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of A4-1 to show changes in wall design. Routed to Tim W
|
Routing - PLAN CHECK | 1/20/2011 | | 1/20/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines and plan review report. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/20/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/20/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/18/2011 | | 1/19/2011 | | PEND |
Tim L. Woodard
|
|
|
Informed architect that additional info was needed before issuance. Either show new 1 hour wall to bottom of one hour assembly or provided engineering for plan shown. TLW
|
Routing - FIRE | 1/13/2011 | | 1/18/2011 | | PASS |
Scott Arellano
|
|
|
Attached revised IFC comments to plans
|
Routing - PLAN CHECK | 1/7/2011 | | 1/13/2011 | | PASS |
Tim L. Woodard
|
|
|
Resubmittals Approved. TLW
|
Plan resubmittals received | | | 1/12/2011 | | DONE |
Christina Prado
|
|
|
received two copies of A2-1 & A4-1 and one cover letter. Taken to Tim in plan check
|
Routing - FIRE | 1/5/2011 | | 1/7/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 1/7/2011 | | FAIL |
|
|
|
Failed Fire
|
Routing - PLAN CHECK | 12/23/2010 | | 1/5/2011 | | PASS |
Tim L. Woodard
|
|
|
Tim W.
|
Routing - Erosion and Sediment | 12/22/2010 | | 12/23/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver request is approved according to the ESC permit conditions. ESC10-00917
|
Routing - PLUMBING | 12/22/2010 | | 12/22/2010 | | PASS |
Bill VanDegrift
|
|
|
(1)additional cross connection protection may be required. P-15,P-16 etc. (2) mount P-7 over the mop sink. (3) United water requires a separate water service for the sprinkler in the gas closet, contact United water. (4) all med gas piping below slab must be in a sleeve or block out.
|
Routing - PLAN CHECK | 12/22/2010 | | 12/22/2010 | | PEND |
Tim L. Woodard
|
|
|
Routing to esc and plumbing.
|
Routing - PUBLIC WORKS | 12/20/2010 | | 12/22/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 12/21/2010 | | 12/21/2010 | | PASS |
Terry Records
|
|
|
|
Plan resubmittals received | | | 12/21/2010 | | DONE |
Tisha Gallop
|
|
|
received ESC application and waiver request letter and two copies of plan sheet A2-1; taken to Tim Woodard
|
Routing PW Sewer Rating | 12/21/2010 | | 12/21/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 12/20/2010 | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|