Second Notice | | 9/4/2011 | 8/26/2011 | | DONE |
|
|
|
|
First Notice | | 8/20/2011 | 8/25/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 7/27/2011 | 7/28/2011 | 7/28/2011 | A | PASS |
Tom Arcoraci
|
|
|
Temp Occ---Jay Phone #: ###-####
|
Temporary Occupancy UNPAID FEE | | | 7/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 7/27/2011 | 7/27/2011 | 7/27/2011 | A | PASS |
Forrest France
|
|
|
|
Zoning Approval | 7/27/2011 | 7/27/2011 | 7/27/2011 | | DONE |
Josh Wilson
|
|
|
OK per CZC11-00167
|
FIRE-Final Inspection | 7/26/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Conference | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PASS |
Tom Arcoraci
|
|
|
Jay Phone #: ###-####
|
Print Occupancy Form | | | 7/19/2011 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Conference | 6/1/2011 | 6/1/2011 | 6/1/2011 | P | DONE |
Forrest France
|
|
|
Jay Phone #: ###-#### On site conference with general contractor regarding fire protection and ventilation at the medical gas room. Also discussed related fire code review note comments.
|
FIRE-Final Inspection | 5/24/2011 | 5/25/2011 | 5/25/2011 | A | CANC |
Forrest France
|
|
|
jay Phone #: ###-####
|
BLD-Energy code compliance | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Tom Arcoraci
|
|
|
jay Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2011 | 5/24/2011 | 5/24/2011 | A | PASS |
Tom Arcoraci
|
|
|
jay Phone #: ###-####
|
BLD-Conference | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
jay Phone #: ###-#### ok to istall floor and drywall lid
|
Telephone call | | | 2/22/2011 | | DONE |
Sam Zahorka
|
|
|
Left message with Jay. The specification and engineering calculations were not picked up at permit issuance. Information is at the front permit desk. Please contact Darla at front counter. SRZ
|
Issue PAID IN FULL permit | | | 2/17/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 2/2/2011 | | 2/16/2011 | | PASS |
Sam Zahorka
|
|
|
Pending Planning to approve.
2-16-11 Routed to Planning
|
Plan resubmittals received | | | 2/16/2011 | | DONE |
|
|
|
received 1 transmittal letter & 1 copy of a landscaping license sent to Sam Z for review.
|
Routing - PLANNING | 2/16/2011 | | 2/16/2011 | | PASS |
David Moser
|
|
|
|
Plan Reviewer's activity | | | 2/16/2011 | | DONE |
Sam Zahorka
|
|
|
Scanned ACHD letter for Planning and Zoning approval and attached under documents. SRZ
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 2/16/2011 | | DONE |
|
|
|
|
Telephone call | | | 2/16/2011 | | DONE |
|
|
|
t/c w dana - permit ready and fees given
|
Permit Ready to Issue | | | 2/16/2011 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 12/22/2010 | | 2/16/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Design Review | 2/16/2011 | | 2/16/2011 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC10-00167
|
Routing - PLAN CHECK | 1/21/2011 | | 2/2/2011 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 2/2/2011 | | DONE |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 1/31/2011 | | |
|
|
|
received 1 review comment, and 2 copies of sheets A0.1,A2.1,A7.1,A8.1 inserted by Jessica from Insite arch. taken to Sam Z.
|
Telephone call | | | 1/28/2011 | | DONE |
Sam Zahorka
|
|
|
Called the architect Dana Kauffman. He stated plan corrections and ACHD revisions were being worked on and resubmittals are in the works.
|
1st review completed | | | 1/21/2011 | | DONE |
|
|
|
Failed - Planning, Plan Check
|
Routing - FIRE | 1/19/2011 | | 1/21/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached review.
|
Routing - PLAN CHECK | 12/29/2010 | | 1/19/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 12/28/2010 | | 12/29/2010 | | FAIL |
David Moser
|
|
|
David Moser - CUP10-00043; failed - need copy of license agreement with ACHD for landscaping. Called and left a message with the applicant on 12-29-10
|
Routing - PLUMBING | 12/23/2010 | | 12/28/2010 | | PASS |
Bill VanDegrift
|
|
|
if CS-1 is equiped with a pull out spout cross connection protection will be required.
|
Routing - Erosion and Sediment | 12/22/2010 | | 12/23/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC permit conditions. ESC10-00914: Certified RP is required.
|
Routing - PUBLIC WORKS | 12/22/2010 | | 12/22/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 12/22/2010 | | 12/22/2010 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 12/22/2010 | | 12/22/2010 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 12/21/2010 | | 12/22/2010 | | DONE |
John Menard
|
|
|
|
Application received | | 12/20/2010 | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 12/20/2010 | | PASS |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2010 | | DONE |
Barbara Stitt
|
|
|
|